Professional Achievements

- *** kV GIS System T & C – 1320 MW Coal Power Plant – SS Power I.

- 400 kV GIS System T & C – 718 MW Combine Cycle Power Plant – SAMSUNG Power Plant, Meghnaghat.

- 400 kV AIS System T & C – 684 MW Combine Cycle Power Plant – SUMMIT- II, Meghnaghat.

- 400 kV AIS System T & C – 1X500 MW HVDC, Block 1 – PGCB.

- 400 kV AIS System T & C – 1X500 MW HVDC, Block 2 – PGCB.

- 230 kV GIS System T & C – SIEMENS Bangladesh - GPH ISPAT Power Distribution System.

- 33 kV GIS System T & C – 3 Project at Bangladesh.

B.Sc. Electrical 8+ Years Exp.

************.***@*****.***

+880****-******

Rampura, Dhaka, Bangladesh

Power Generation Electrical Substation, Distribution & Transmission

Professional Career Summary

March 2022 to Continue.

Manager The Great Western Energy (BD) Ltd.

Testing & Commissioning Main Road, Block A, Aftabnagar, DHAKA

Responsible Projects are:

1. 1X400kV Indoor GIS Substation ETC work (SS POWER I) 2. 2X540 MVA Transformer ETC work. (SUMMIT II & Unique PP) 3. 3X355 MVA Transformer ETC work. (SAMSUNG 718MW CCPP) 4. TISTA 200MW Solar Power Plant

5. 2X270 MVA Transformer ETC work. (SUMMIT II & Unique PP) 6. 6X40 MVA Transformer ETC work. (SUMMIT II & Unique PP) 7. 2X40 MVA Transformer T & C for Maintenance work. 8. (CLC 108 MW PP, Maisha Group)

September 2018 to February 2022

Asst. Manager

Reverie Power & Automation

Engineering Ltd.

Responsiblities are:

1. Budgeting, Tendering, Cost estimation, Technical solution with client & foreign EPC.

2. Utility Customer requirement meetings and in details project discussion. 3. Project Co-Ordinator (EPC Projects)

4. Electrical ETC monitoring & Approval.

5. Preparation & Maintain work schedule.

6. GPH ISPAT (230/33/11 kV GIS) Power Distribution System, Chittagong

7. 33/11 KV, 2X10 MVA Substation, Sandip, Chittagong (BPDB) Jan’17 to Aug’18

SIEMENS INDIA

Electrical Supervisor Bangladesh Project Office

Responsible Projects are:

1. 4X230 kV Switchyard Extension. (NWPGCL & PGCB)

2. 1X500 MW HVDC B2B Substation, Block-2. (PGCB)

Project Co-Ordinator

T & C

230 KV (AIS & GIS)

400 KV Electrical System (AIS & GIS)

Project Management Site Management

33 KV (AIS & GIS)

Business Development

Engineering Skills

Power Plants Transformer

Communication SCADA

HMI Testing

Switchgear

Synchronization

Grid System

AIS & GIS

Managerial Skills

Team Building Leadership

Presentation Trainer

Documentation

Cost Control

Tender

Budget

Project Skills

Team Work Engineering

Relay Communication

132 kV AIS

Presentation

Leadership

Conflict Management

Date: 31 October 2022

Page 2 of 3

May’14 to Dec’16

Bangladesh Erectors Ltd. (BEL)

Electrical Engineer Project Office, Bheramara, Kushtia. 1.1X500 MW HVDC B2B Substation, Block-1. (PGCB)

– 400 Kv AIS System

2.410 MW Combine Cycle Power Plant. (NWPGCL)

– 230 kV AIS System

Expertise & Skills

Electrical Testing Experiences

(Up to 400 kV GIS & AIS Electrical System)

400 kV AIS & GIS equipment Testing & Commissioning.

245 kV AIS & GIS equipment Testing & Commissioning.

33 kV GIS equipment Testing & Commissioning.

5X230 kV Bay Extension Equipment Testing & Charging

4X33/11 kV Substation Testing & Charging.

SCADA & Telecommunication System installation & commissioning.

Commissioning approval & Charging.

Pre-Commissioning Preparation.

Trouble Shooting.

Local/ Remote operation.

Generator

Assist Generator Manufacturer team for testing & commissioning.

18 KV, 287.8 MW 415 MVA, 50 Hz, 0.8 PF, 3 - Gas Turbine Generator Zero Flux Bushing CT Test

14.5 KV, 140.14 MW, 188 MVA, 50 HZ, 0.8 PF, 3 - Steam Turbine Generator Zero Flux Bushing CT Test

Assist Commissioning team for Trial and Final Operation.

Lube Oil feed pump Operation.

Maintenance assistance of Generator Manufacturer Engineer during shutdown & final operation.

Transformer

(400/ 3), (66.8/ 3), (66.8) KV, (201/100.5/100) MVA (1 - ) 4 NOS, Converter Transformer Testing & Commissioning

(230/ 3), (66.8/ 3), (66.8) KV, (201/100.5/100) MVA (1 - ) 4 NOS, Converter Transformer Testing & Commissioning.

(18/138 KV, 297/396 MVA, (3 - ) 1 NOS GAS Turbine Power Transformer Testing & Commissioning.

(14.5/138 KV, 145.5/194 MVA, (3 - ) 1 NOS STEAM Turbine Power Transformer Testing & Commissioning.

[780 KVA, 14.5/0.37 KV] Generator Excitation Transformer Testing & Commissioning.

2X132/230 KV, 100 MVA and 2X230/33/11 KV), 125 MVA, (3 - ) Substation Power Transformer Testing & Commissioning.

132/6.6 KV, 21/28/ 9.34 MVA, 230/33 KV, 10/14.33 MVA, 33/11 KV, 10 MVA and many more Bellow rated Power & Auxiliary Transformers are tested and charged by me.

Assist commissioning team for final charging with load.

Shutdown and maintenance & inspection activities for final energizations with load.

Primary Back Charging for 72 Hours.

SCADA communication & Clearance Up to NLDC.

NIFPS Operation from DCS/SCADA

Back Charging clearance from customer end.

DCS/SCADA Operation check. (Test & Final).

Shunt Reactor

420 KV, 80 MVAR 2 NOS Shunt Reactor Testing & Commissioning.

420 KV, 63 MVAR 2 NOS Shunt Reactor Testing & Commissioning. Erection

DCS SAS Tr. Line

OPGW WTP

EDUCATION

B.Sc in EEE

(3.02/4)-2015

University of Information

Technology & SCIENCES – (UITS)

DHAKA.

Language Proficiency

English - Fluent Hindi- Fluent

Bangla - Fluent

Computer Skills

OS: Windows/MAC/Ubuntu

Office: MS Word/ EXCEL/ Power

Point/ Project/Visio

Engineering Software:

AutoCAD

LSPS

MATLAB

Magger:-

FRAX

CABA Win

Omicron:-

PTM, Test Universal, Analyzer

Korean- Basic

Marital Status: Married

B/G: O+

Height: 5’11’’

Nationality: Bangladeshi

Religion: Islam (SUNNI)

Circuit Breaker (GIS & AIS)

420 KV, 4000 AMP Outdoor Type SF6 CB with PSD and Without PSD. [PSD

- Phase Synchronise Device]

245 KV, 3150 Amp Indoor (GIS) & Outdoor Type SF6 CB Testing & Commissioning.

33 KV, 3150 Amp and bellow rated Outdoor & Indoor type GIS CB, VCB, ACB, OCB are tested and charged by me.

Maintenance and troubleshooting at CB failure.

Maintenance at SF6 Gas Pressure Low alarm.

DCS & SCADA based Operation and protection logic-based operation.

Circuit Based Protection Operation during Pre-Commissioning activities. AC Filter, CT/CVT, VT/IVT, DS, ES, NGR, Resistor, Inductor, Capacitor

420 KC AC Filter, Capacitor, Inductor, Current Transformer (CT), Capacitive Voltage Transformer (CVT), Inductive Voltage Transformer

(IVT) Testing & Commissioning.

ZERO FLUX Current Transformer (CT) Testing & Commissioning of VALVE HALL [Converter Room- HVDC].

Metering & Protection Current Transformer (CT) Testing & Commissioning.

Maintenance equipment annually & on demand.

Local & Remote Operation of equipment.

Primary operation of each equipment after circuit checking completion. PUMP & MOTOR

Motor & Pump tested up to 4140 KW.

GBC Motor, Boiler Feed Pump, CW Pump, CCW, Cooling Tower motor e.tc are the biggest motor I’ve ever tested in power plant.

Troubleshoot motors & Pumps to solve several electro-Mechanical observations.

Local & Remote Operation of Pump Motor along with interlocks.

Maintenance of Pump & Motor on annual & operational observations or on demand.

Several Operation before pre-commissioning.

Primary operation after circuit testing.

Protection & Operation Relay

Partially tested Differential Protection, Directional Earth Fault Non- Directional Earth Fault, IDMT, Phase Synchronization, Under Voltage, Over Voltage circuit & relay.

BCU & MCU Installation & Operation & Upgradation of SCADA.

BCU & MCU input & Output & SCADA Operation Testing.

Troubleshooting BCU malfunction.

LOCAL & REMOTE Operation of BCU & MCU.

Training Undergone

Training on “HMI Design & Communication Interface” from ZENON, Austria. [Online Training]

Training on “Relay Protection in Power System with Knowledge, Conception, and Application” from IEB: 16 July 2016 to 24 July 2016

Training on “Electrical Testing during Maintenance” from SIEMENS. [Online Training]

Training on OLTC Maintenance by MR Germany. [Online Training]

Transformer Bushing Rearrangement at site due to Oil Leakage Problem. [Online Training]

Training on “Lightning Protection System” from ONAY, TURKY. Online Training.



Contact this candidate