Professional Achievements
- *** kV GIS System T & C – 1320 MW Coal Power Plant – SS Power I.
- 400 kV GIS System T & C – 718 MW Combine Cycle Power Plant – SAMSUNG Power Plant, Meghnaghat.
- 400 kV AIS System T & C – 684 MW Combine Cycle Power Plant – SUMMIT- II, Meghnaghat.
- 400 kV AIS System T & C – 1X500 MW HVDC, Block 1 – PGCB.
- 400 kV AIS System T & C – 1X500 MW HVDC, Block 2 – PGCB.
- 230 kV GIS System T & C – SIEMENS Bangladesh - GPH ISPAT Power Distribution System.
- 33 kV GIS System T & C – 3 Project at Bangladesh.
B.Sc. Electrical 8+ Years Exp.
************.***@*****.***
Rampura, Dhaka, Bangladesh
Power Generation Electrical Substation, Distribution & Transmission
Professional Career Summary
March 2022 to Continue.
Manager The Great Western Energy (BD) Ltd.
Testing & Commissioning Main Road, Block A, Aftabnagar, DHAKA
Responsible Projects are:
1. 1X400kV Indoor GIS Substation ETC work (SS POWER I) 2. 2X540 MVA Transformer ETC work. (SUMMIT II & Unique PP) 3. 3X355 MVA Transformer ETC work. (SAMSUNG 718MW CCPP) 4. TISTA 200MW Solar Power Plant
5. 2X270 MVA Transformer ETC work. (SUMMIT II & Unique PP) 6. 6X40 MVA Transformer ETC work. (SUMMIT II & Unique PP) 7. 2X40 MVA Transformer T & C for Maintenance work. 8. (CLC 108 MW PP, Maisha Group)
September 2018 to February 2022
Asst. Manager
Reverie Power & Automation
Engineering Ltd.
Responsiblities are:
1. Budgeting, Tendering, Cost estimation, Technical solution with client & foreign EPC.
2. Utility Customer requirement meetings and in details project discussion. 3. Project Co-Ordinator (EPC Projects)
4. Electrical ETC monitoring & Approval.
5. Preparation & Maintain work schedule.
6. GPH ISPAT (230/33/11 kV GIS) Power Distribution System, Chittagong
7. 33/11 KV, 2X10 MVA Substation, Sandip, Chittagong (BPDB) Jan’17 to Aug’18
SIEMENS INDIA
Electrical Supervisor Bangladesh Project Office
Responsible Projects are:
1. 4X230 kV Switchyard Extension. (NWPGCL & PGCB)
2. 1X500 MW HVDC B2B Substation, Block-2. (PGCB)
Project Co-Ordinator
T & C
230 KV (AIS & GIS)
400 KV Electrical System (AIS & GIS)
Project Management Site Management
33 KV (AIS & GIS)
Business Development
Engineering Skills
Power Plants Transformer
Communication SCADA
HMI Testing
Switchgear
Synchronization
Grid System
AIS & GIS
Managerial Skills
Team Building Leadership
Presentation Trainer
Documentation
Cost Control
Tender
Budget
Project Skills
Team Work Engineering
Relay Communication
132 kV AIS
Presentation
Leadership
Conflict Management
Date: 31 October 2022
Page 2 of 3
May’14 to Dec’16
Bangladesh Erectors Ltd. (BEL)
Electrical Engineer Project Office, Bheramara, Kushtia. 1.1X500 MW HVDC B2B Substation, Block-1. (PGCB)
– 400 Kv AIS System
2.410 MW Combine Cycle Power Plant. (NWPGCL)
– 230 kV AIS System
Expertise & Skills
Electrical Testing Experiences
(Up to 400 kV GIS & AIS Electrical System)
400 kV AIS & GIS equipment Testing & Commissioning.
245 kV AIS & GIS equipment Testing & Commissioning.
33 kV GIS equipment Testing & Commissioning.
5X230 kV Bay Extension Equipment Testing & Charging
4X33/11 kV Substation Testing & Charging.
SCADA & Telecommunication System installation & commissioning.
Commissioning approval & Charging.
Pre-Commissioning Preparation.
Trouble Shooting.
Local/ Remote operation.
Generator
Assist Generator Manufacturer team for testing & commissioning.
18 KV, 287.8 MW 415 MVA, 50 Hz, 0.8 PF, 3 - Gas Turbine Generator Zero Flux Bushing CT Test
14.5 KV, 140.14 MW, 188 MVA, 50 HZ, 0.8 PF, 3 - Steam Turbine Generator Zero Flux Bushing CT Test
Assist Commissioning team for Trial and Final Operation.
Lube Oil feed pump Operation.
Maintenance assistance of Generator Manufacturer Engineer during shutdown & final operation.
Transformer
(400/ 3), (66.8/ 3), (66.8) KV, (201/100.5/100) MVA (1 - ) 4 NOS, Converter Transformer Testing & Commissioning
(230/ 3), (66.8/ 3), (66.8) KV, (201/100.5/100) MVA (1 - ) 4 NOS, Converter Transformer Testing & Commissioning.
(18/138 KV, 297/396 MVA, (3 - ) 1 NOS GAS Turbine Power Transformer Testing & Commissioning.
(14.5/138 KV, 145.5/194 MVA, (3 - ) 1 NOS STEAM Turbine Power Transformer Testing & Commissioning.
[780 KVA, 14.5/0.37 KV] Generator Excitation Transformer Testing & Commissioning.
2X132/230 KV, 100 MVA and 2X230/33/11 KV), 125 MVA, (3 - ) Substation Power Transformer Testing & Commissioning.
132/6.6 KV, 21/28/ 9.34 MVA, 230/33 KV, 10/14.33 MVA, 33/11 KV, 10 MVA and many more Bellow rated Power & Auxiliary Transformers are tested and charged by me.
Assist commissioning team for final charging with load.
Shutdown and maintenance & inspection activities for final energizations with load.
Primary Back Charging for 72 Hours.
SCADA communication & Clearance Up to NLDC.
NIFPS Operation from DCS/SCADA
Back Charging clearance from customer end.
DCS/SCADA Operation check. (Test & Final).
Shunt Reactor
420 KV, 80 MVAR 2 NOS Shunt Reactor Testing & Commissioning.
420 KV, 63 MVAR 2 NOS Shunt Reactor Testing & Commissioning. Erection
DCS SAS Tr. Line
OPGW WTP
EDUCATION
B.Sc in EEE
(3.02/4)-2015
University of Information
Technology & SCIENCES – (UITS)
DHAKA.
Language Proficiency
English - Fluent Hindi- Fluent
Bangla - Fluent
Computer Skills
OS: Windows/MAC/Ubuntu
Office: MS Word/ EXCEL/ Power
Point/ Project/Visio
Engineering Software:
AutoCAD
LSPS
MATLAB
Magger:-
FRAX
CABA Win
Omicron:-
PTM, Test Universal, Analyzer
Korean- Basic
Marital Status: Married
B/G: O+
Height: 5’11’’
Nationality: Bangladeshi
Religion: Islam (SUNNI)
Circuit Breaker (GIS & AIS)
420 KV, 4000 AMP Outdoor Type SF6 CB with PSD and Without PSD. [PSD
- Phase Synchronise Device]
245 KV, 3150 Amp Indoor (GIS) & Outdoor Type SF6 CB Testing & Commissioning.
33 KV, 3150 Amp and bellow rated Outdoor & Indoor type GIS CB, VCB, ACB, OCB are tested and charged by me.
Maintenance and troubleshooting at CB failure.
Maintenance at SF6 Gas Pressure Low alarm.
DCS & SCADA based Operation and protection logic-based operation.
Circuit Based Protection Operation during Pre-Commissioning activities. AC Filter, CT/CVT, VT/IVT, DS, ES, NGR, Resistor, Inductor, Capacitor
420 KC AC Filter, Capacitor, Inductor, Current Transformer (CT), Capacitive Voltage Transformer (CVT), Inductive Voltage Transformer
(IVT) Testing & Commissioning.
ZERO FLUX Current Transformer (CT) Testing & Commissioning of VALVE HALL [Converter Room- HVDC].
Metering & Protection Current Transformer (CT) Testing & Commissioning.
Maintenance equipment annually & on demand.
Local & Remote Operation of equipment.
Primary operation of each equipment after circuit checking completion. PUMP & MOTOR
Motor & Pump tested up to 4140 KW.
GBC Motor, Boiler Feed Pump, CW Pump, CCW, Cooling Tower motor e.tc are the biggest motor I’ve ever tested in power plant.
Troubleshoot motors & Pumps to solve several electro-Mechanical observations.
Local & Remote Operation of Pump Motor along with interlocks.
Maintenance of Pump & Motor on annual & operational observations or on demand.
Several Operation before pre-commissioning.
Primary operation after circuit testing.
Protection & Operation Relay
Partially tested Differential Protection, Directional Earth Fault Non- Directional Earth Fault, IDMT, Phase Synchronization, Under Voltage, Over Voltage circuit & relay.
BCU & MCU Installation & Operation & Upgradation of SCADA.
BCU & MCU input & Output & SCADA Operation Testing.
Troubleshooting BCU malfunction.
LOCAL & REMOTE Operation of BCU & MCU.
Training Undergone
Training on “HMI Design & Communication Interface” from ZENON, Austria. [Online Training]
Training on “Relay Protection in Power System with Knowledge, Conception, and Application” from IEB: 16 July 2016 to 24 July 2016
Training on “Electrical Testing during Maintenance” from SIEMENS. [Online Training]
Training on OLTC Maintenance by MR Germany. [Online Training]
Transformer Bushing Rearrangement at site due to Oil Leakage Problem. [Online Training]
Training on “Lightning Protection System” from ONAY, TURKY. Online Training.