Bradford L. Rinard
**************@*****.***
Summary
Heavy equipment operator, skilled with mass excavation and finish grade. Adept at transitioning to constantly changing priorities, and able to work independently, or as part of a team.
Experience:
Union Member June 2020 - Present
GSI/Environet February 2021 – July 2021
181 S Kukui St
Honolulu, HI 96813
808- 681-2742
Heavy Equipment Operator on Military Bases
Including Crane Naval Base, Pearl Harbor, and Marine Corps Base Hawaii (MCBH) working electrical utilities.
Operated Excavator
Osha 30, Trench Safety, and CPR Certifications
Milestone Contractors June 2020 - October 2020
PO Box 421459
Indianapolis, IN 46242
Heavy Equipment Operator
Operated Dozer, Excavator, and Motor Grader
Kiewit Mining San Miguel Mine May 2015 - August 2019
9200 Peeler Ranch Road
Christine, TX
Heavy Equipment Operator
Operated Cat D-11, Komatsu 575, and 100 ton end dumps
MSHA Certified
Q Haul Inc. March 2013 - April 2015
P.O Box 7
Tilden TX.
Heavy Equipment Operator
Built pads, reserve pits for oil rigs. Mass excavation for frac ponds
Operated dozer, track-hoe, loader, backhoe
Self Employed January 2010 - March 2013
Clearing fence line and land on ranches
Digging stock ponds
Equipment Operator
Balfour Beatty May 2008 - January 2010
999 Peachtree St.N.E Suite 200
(Atlanta, GA) Austin, TX
Heavy Equipment Operator on 45 Buda Toll Road:
Primary responsibility loader, dozer, backhoe, track-hoe operator.
MSE walls, demolition, mass excavation, and rough finish.
Hill Country Constructors February2007- May 2008
12357-A Riata Trace
Parkway Suite 300
Austin, TX
Heavy Equipment Operator on 183A Toll Road:
Finish work on curb, gutter, ditch lines, and traffic control.
Granite Abrams April 2005 - February 2007
14926 N. 620 R.R.
Austin, TX
Heavy Equipment Operator on 45 Toll Road:
Finish work on dirt and concrete on 45 toll road.
Set toll booths, cut ditch lines, finish slops, and loaded trucks for haul off.
Lone Star Infrastructure August 2002 - April 2005
Austin, TX
Heavy Equipment Operator on SH130 Toll Road:
Built MSE walls, assisted drillers transporting column cages, removing spoils, as well as loaded trucks for haul-off.
References:
Brian Stewart – Project Manager GSI – 254-***-****
Rick Bishop – Electrical Superintendent GSI – 808-***-****
David McDaniel – Qhaul Superintendent – 830-***-****
TJ Belcher – Crane Superintendent – 512-***-****