Adrian A Moore
Tallahassee, FL 32305
Phone: 229-***-****
Email: *****.******@*****.***
Experience in production and processing, electrical installations, mechanical, administration and management, and performing day to day labor and construction duties.
Employment History:
Lead Installer/Supervisor
Sunpro Solar – Atlanta, GA
Feb 2021 – Present
Supervised a crew of four members
Installed modules in accordance with codes and standards using, drawings/blueprints, schematics and instructions
Installed solar collector mounting devices on tile, asphalt, shingles, or built up gravel roofs, using appropriate materials
Lead Installer/Supervisor
Hannah Solar – Atlanta, GA
Nov 2020 to Feb 2021
Supervised a crew of four members
Installed modules in accordance with codes and standards using, drawings/blueprints, schematics and instructions
Installed solar collector mounting devices on tile, asphalt, shingles, or built up gravel roofs, using appropriate materials
Foreman/Supervisor
PCL Construction - MT Orab, OH
June 2020 to Nov 2020
· Supervised a team of 76 Installers
· Provide technical assistance to installers, technicians, or other solar professionals in areas such as solar electric systems, solar thermal systems, electrical systems, or mechanical systems.
· Identify means to reduce costs, minimize risks, or increase efficiency of solar installation projects
· Coordinate or schedule building inspections for solar installation projects
· Perform start-up of systems for testing or customer implementation
Foreman
Novel Energy - Rochester, MN
January 2020 – May 2020
· Supervised solar installers, technicians, and subcontractors for solar installation projects to ensure compliance with safety standards.
· Estimated materials, equipment, and personnel needed for residential or commercial solar installation projects.
· Prepared solar installation project proposals and schedules.
· Planned and coordinated installations of photovoltaic (PV) solar and solar thermal systems to ensure conformance to codes.
· Monitored work of contractors and subcontractors to ensure projects conform to plans, specifications and schedules
Lead Solar Installer/Mechanical
OCI Construction
January 2018 to July 2018
· Tested operation or functionality of mechanical, plumbing, electrical, and control systems.
· Applied weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
· Installed solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
· Installed copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
· Identified plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
Lead Solar Installer/Electrical
Blattner Energy, Inc
February 2017 to December 2017
· Installed photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.
· Assembled solar modules, panels, or support structures, as specified.
· Applied weather sealing to array, building, or support mechanisms.
· Determined appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
· Installed module array interconnect wiring, implementing measures to disable arrays during installation.
Solar Installer
People Ready – Tampa, FL
November 2015 to May 2016
· Tested operation or functionality of mechanical, plumbing, electrical, and control systems.
· Applied weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
· Installed solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
· Installed copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
· Identified plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
Solar Installer
JB Solar – Georgia Southern, GA.
May 2015 to September 2015
· Identified electrical, environmental, and safety hazards associated with photovoltaic (PV) installations
· Examined designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.
· Checked electrical installation for proper wiring, polarity, grounding, or integrity of terminations
· Tested operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.
EDUCATION
Completion Date
Issuing Institution
Location
Degree Received
Course of Study
05/2009
Bainbridge High School
GA
High School Diploma
General High School Curriculum
Skills
• Solar (5 years), Roofing (1 year), General Laborer (8 years), Electrical (3ears), Microsoft Office (2 years), Construction (12 years), drywall (2 years)
• Supervisory Skills: Interpersonal Skills
• Written Communication, Collaboration and Analytical skills
• Data Analysis and Document Sharing
• Blueprint Reading
• Construction Management
• Landscape Maintenance
• Mowing
• Facilities Maintenance
• Handyman
• Load & Unload
• Assembly