APRIL WORKMAN
OBJECTIVE
To join a company, a leader in its field, where I can become part of a team that strives for excellence and utilize my skills in a safe and effective manner, helping the company achieve its goals and objectives
EXPERIENCE
July 2012 – Present Shurtape Technologies, LLC Hickory, NC
Packaging Analysis : The Packaging Analyst coordinates activities involving packaging materials for the Global Procurement Department and works with colleagues to ensure the quality and consistency of these materials being delivered to the plants.
Monitor and perform daily GIMS tasks
Monitor and perform daily Esko tasks
Create and maintain packaging specifications in MAPS system
Create and maintain PoP Display instructions
Work with Sourcing and Marketing to determine inventory and obsolescence
Work with BOM coordinator to ensure proper transition of materials
Participate in relevant project team meetings
Using Tops Pro, create pallet configurations based on carton dimensions.
Attend any necessary corrective action meetings involving supplier issues
QA Technician – Plant 33 Hickory, NC (June 2016 to present)
Completed QA training at plants 33,36, & 24.
Testing and inspection of new and existing products, raw materials, off coater and finished samples.
Ensuring all test data is in compliance with established specifications.
Entering all test data into specified computer systems
SAP, QMS, WIN SPC, Excel, Word
Machine Operator – Plant 24, Hudson, NC (March 2014 – June 2016)
Operate a high speed coater producing clear film packaging tape.
Also set up, operate, troubleshoot and train on auto converting (slitting) cell
Involved in continuous improvement teams (high speed coater and slitting) including kaizens
Follow daily plans, read and analyze schedules, follow and log production data for throughput, waste, and material variances. Enter and follow up on maintenance work orders.
ERT member trained in CPR / AED, Fire, Machine Extrication, Spill, Medical, patient assessment, etc.
Skilled using SAP, MS Office
Trained using sit down LP fork lift
Machine Operator – Plant 36, Hickory NC (September 2012 – March 2014)
Operated “Frogger” robotic cell finishing Frog Tape product
Also set up, operate, troubleshoot and train on auto converting (slitting) cell
Involved in continuous improvement teams (Frogger and slitting) including kaizens
Followed daily plans, read and analyzed schedules, followed and logged production data for throughput, waste, and material variances. Enter and follow up on maintenance work orders, all using SAP
April 2010 – September 2012 Designer/ Self-Employed
Interior designer
Work with clients to design a spaces that enhances function and aesthetics of interior
Select samples, including color pallets, architectural details, and flooring, to be approved by client.
Read and interpret blueprints.
Plan and estimate budgets for projects.
CAD to create drawings for approval by construction inspector to ensure the design meets building codes.
CAD or hand drafted floor plans and sketches. For proper space planning
Use computer-aided design (CAD) to create drawings.
November 2008 – April 2010 Capel Rugs Blowing Rock, NC
Design Consultant / Sales
Ensure high levels of customer satisfaction through excellent sales service, and knowledge of products offered.
Enhance the aesthetics of customer’s interior space
Negotiate prices.
Arrange pickup or in home delivery of purchase
November 2007 – August 2008 Blowing Rock Renovators Blowing Rock, NC
Interior designer /paid intern
Work with clients to design or renovate spaces to meet their standards.
Enhance the function, safety, and aesthetics of interior spaces
Select samples, including color pallet, architectural details and flooring to be approved by client.
Read and interpret blueprints.
Negotiate prices.
Plan and estimate budgets for projects.
Submit drawings for approval by a construction inspector to ensure that the design meets building codes.
Draw up floor plans and sketches.
Use computer-aided design (CAD) to create drawings.
Follow up with client to ensure design specifications have been met.
October 1996 – June 2005 PPG Shelby, NC
Sliver Handler
Collect all glass filaments strands flowing from bushing and separating filaments to specification.
Applying glass filaments to chemical binder applicator to prevent breakage in winding process.
Troubleshoot non-flowing glass filaments, chemical binder applicators, and recurring breakouts.
Proper cleaning and change out of chemical applicators and furnace glass filament bushings.
Shutdown and startup of furnace rebuilds.
Trained using sit down LP fork lift
EDUCATION / TRAINING
1988 Ed White High School Jacksonville, FL
1992 – 1993 Gaston College Dallas, NC
General Studies Diploma
2007 Western Piedmont Community College Morganton, NC
AAS – Applied Science – Design (Auto CAD, Hand Drafting, Space Planning
Certified in Technical Rendering
Certified in Fabric Design
REFRENCES AVAILABLE UPON REQUEST
aduzbl@r.postjobfree.com
155 JOHN THOMAS DR. •BOONE, NC 28607 • 828-***-****