V.GURUSAMY
Door No ***, R Block,
Kovaipudur,
Coimbatore-641042,
Tamil Nadu, India.
*************@*****.***
1.General:
Position
Project Manager
Name
V. Gurusamy
Date of Birth
10th July, 1969
Citizenship
Indian
2.Education :
Master in Civil (Structural Engineering) from Coimbatore Institute of Technology, Bharathiyar University, 1993
Bachelor in Civil from Kongu Engineering College, Bharathiyar University, Coimbatore, 1990
Training:
Internal Quality Auditing Training Course In Dammam, K.S.A. Conducted By National Inspection & Testing Co Ltd (Fahss / Tuv-Germany ) During October, 2002.
Quality Control and Management Systems Auditor/Lead Training Course (Based On ISO 9001-2008) By Nigel Bauer U.K. Conjunction With Tuv During January, 2011
3.Employment record relevant to the assignment :
Period
Employing Organization and your title/Position. Contact
information for references
Country
Summary of activities performed relevant to the Assignment
March 2021 to July 2022
PETROLEUM DEVELOPMENT OF OMAN
Position: RLA Engineer ( Structural & Civil )
For Reference:
Contact: Project Lead- Arulraj
Tel: 096*-********
Oman
Through assessment of running oil/gas plant for remaining life with strong technical recommendations to run next twenty years.
January 2020 to Feb 2021
Sutra Consulting Pvt Ltd
Position: Approved valuation Engineer by Tamil Nadu Highway Department
For Reference Contact: Mrs. Sunita, Project Director
Tel: 0091- 958**-*****
India
Evaluating property valuation in Land Acquisition Rehabilitation and Resettlement plan under Chennai - Kanyakumari Industrial Corridor Project (CKICP), Chennai.
May 2018 to December 2019
EPTISA SERVICIOS DE INGENIERIA
Position: QA/QC Manager
For Reference:
Contact: Prakalath – Project Co-Ordinator
Tel: 0091- 943-***-****
Email: *.*******@*****.***
India
Review of Contractors’ Quality Assurance Plan.
Approve materials and sources of materials, review all bituminous mix designs and concrete mix designs proposed by the contractor and approve / suggest modifications in the mix design, laying methods, sampling and testing procedure.
Monitor the laboratory and field tests carried out by the contractor and maintain adequate records.
July 2016 to Sep 2017
KCCEC
Position: QA/QC Site Quality In charge
For Reference:
Contact: Karthikeyan – Quality Manager
Tel: 009**-********
Email: *.***********@****.***.**
Kuwait
Quality Inspections
Report Preparations, Verifying Samples and Certificates of Lab.
Non Conformity Report Preparation
Witnessing for Conducting the Laboratory test
June 2015 to May 2016
B.R & Co., Coimbatore
Position: Assistant GM– (Quality control & Project Coordinator)
For Reference:
Contact: Basaviah - MD
Tel: 0091 958-***-****
Email: ************@*****.**.**
India
Developing project baselines; monitoring & controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of projects.
Directed and monitored progress during project execution to ensure project deliverables conform to design specifications and quality standards
July 2014 to April 2015
Al Kayarin Group
Position: Project QA/QC Head
For Reference:
Contact: Usman Shareef –QA/QC Manager
Email: *********@*****.***
Qatar
Quality Inspections
Report Preparations
Verifying Sample and Certificate of Laboratories.
Non Conformity Report Preparation
Preparation of Method Statements
Jan 2011 to Sep 2013
UDHE India Pvt Ltd
Position: QA/QC Manager
For Reference:
Contact: Ashwin - PM
Tel: 0091 876**-*****
Email: ******.*****@************.***
India
Quality Inspections, Report Preparations
Verifying Sample and Certificate of Laboratories.
Non Conformity Report Preparation
Preparation of Method Statements, Inspection Test Plans
Project Final documents Preparation works
March 2009 to June 2010
Tristar Transport and Contracting
Position: Sr. QA/QC Engineer
For Reference:
Contact: Ajay – Planning Manager
Tel: 009**-*********
Email: ****@*******-***.***
UAE
Quality Inspections cum Report Preparations
Verifying Sample and Certificate of Laboratories.
Non Conformity Report Preparation
Preparation of Method Statements, Inspection Test Plans
Project Final documents Preparation works
Feb 2007 To Nov 2007
Dodsal Pvt Ltd
Position: Senior QA/QC Engineer – Civil
For Reference:
Contact: Rasheed– Construction Manager
Tel: 009**-********
Qatar
Quality Inspections, Report Preparations
Verifying Sample and Certificate of Laboratories.
Non Conformity Report Preparation
Preparation of Method Statements, Inspection Test Plans
Feb 2005 To July 2006
Granite Construction Company
Position: QA/QC Engineer
For Reference:
Contact: Chako Joseph – Area Manager
Tel: 009**-********
UAE
Quality Inspections & Verifying Samples, Certificates of Lab.
Non Conformity Report Preparation
Preparation of Method Statements, Inspection Test Plans
Jan 2003 to Feb 2004
NASSARS AL-HAJRI CORP
Position: QA/QC Engineer
For Reference:
Contact: Jayakaran - - Quality Manager
Tel: +965-****-****
Saudi Arabia
Implementing Quality system procedure through spot checking, Verifying samples & Certificate of laboratories.
Preparation of Field Inspection Reports, Method Statements.
Oct 1995 to May 2002
TVN & Co (Construction Division)
Position: QA/QC Engineer cum Project Engineer
For Reference:
Contact: Thirumalai - MD
Tel: 908-***-****
Email: *************@*****.***
India
Project management done effectively by using pert chart and other planning tools.
Inspection of all activities related to building works e.g., Survey, Footing / Piling, Columns, Beams, Slab
Brickwork, Windows & Doors, Internal & External Plaster, Flooring & Tiles fixing works, water proofing, Plumping, Painting, Emulsion painting for interior walls.
Mar 1994 to Sep 1995
Sundar & Sundaram Architects
Position: QA/QC Engineer cum Project Engineer
For Reference:
Contact: Er Kumaraswamy
Tel: 042********
India
Inspection and management for all activities to the showroom pattern which developed by our company for TVS Ltd and being adapted for all the TVS Showrooms in entire south India.
May 1990 to Jan 1994
Bharath Contractors
Position: Site Engineer cum Quality Engineer
For Reference:
Contact: Gowtham – MD
Tel: 0091 958-***-****
Email: gowthamtennis@gmail,com
India
Inspection and management for all activities to CIT INDOOR AUDITORIUM, first of its kind in Coimbatore city, situated in CIT CAMPUS, with grid roof of span 400’x150’. Inspection and management for all activities to Cheran Tower first biggest apartment building in Coimbatore city incorporating ten story apartment design and a swimming pool over the top most floor.
4.Membership in Professional Associations & Publications:
Member in Indian Concrete Institute - Chennai
Member in American Concrete Institute – Maharashtra Chapter
5.Language Skills :
Language
Reading
Speaking
Writing
English
Excellent
Excellent
Excellent
Hindi
Excellent
Excellent
Excellent
6.Detailed Tasks Assigned on Consultant’s Team of Experts:
Responsible for the material test related aspects of the project.
Conduct review of the available existing documents regarding the project.
Conduct review of the existing infrastructure based on the available documents, secondary sources etc and identify the areas requiring modifications.
Review of Contractor’s Quality Assurance Plan.
Prepare Quality assurance and Quality control system plans consisting of model documents on management procedures for managing construction, design, quality.
Assist in preparing assessment of cost estimates for the project; assist in preparation of contract drawings, Bills of Quantities (BOQ) based on the cost estimates.
Carry out detailed supervision of construction works; Issue correction methods to overcome defects during work progress.
Ensure that the construction works are in accordance with the plans, specifications.
Responsible for supervising all the tests done in different stages of construction and ensure the same are as per specifications.
Responsible for checking the calibration of the material testing equipment.
Approve materials and sources of materials, review all bituminous mix designs and concrete mix designs proposed by the contractor and approve / suggest modifications in the mix design, laying methods, sampling and testing procedure.
Monitor the laboratory and field tests carried out by the contractor.
Inspect and approve quality of goods and materials used at the construction site.
Carry out independent tests on materials of construction as well as partially or completely erected structures etc. and maintain adequate records.
Order special tests of materials and / or completed works, order removal and substitution of improper materials and / or works as required.
Report to the team leader on conformity or non-conformity of the test result and quality of materials.
Assist in preparing Monthly progress reports, Quarterly reports, Annual Reports, Completion Reports, Final certificates.
Maintain coordination with the Client and other concerned parties of the project.
7.Adequacy for the Assignment:
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
Name of Assignment
Remnant life assessment study (RLA)
Year
March 2021 – July 2022 (Input: 1Y 5 months)
Location
Oman
Client
PDO – Petroleum Development Oman
Main project features
Performance remnant life assessment (RLA) study of the existing facilities of PDO oil stations to develop a comprehensive understanding of the technical integrity and recommend requirements for future repairs, renewal, replacement or upgrade ( including obsolescence).
Position held
RLA Engineer ( Civil & Structural)
Activities performed
Study the existing steel and civil foundation of various PDO refinery assets including roads, infrastructures, control buildings, storm water drains, culverts, etc. Evaluate the remaining life in the structure by sheel global performance standards. Drafts the current status report, corrective action work sheet along with recommendations for the possibility of extent the life of structural members.
Name of Assignment
Chennai-Kanyakumari Industrial Corridor Project (CKICP)
Year
Jan 2020 – February 2021 (Input: 1Y 2m)
Location
Chennai
Client
Tamil Nadu Highway Development
Main project features
Monitoring of Land Acquisition Rehabilitation and Resettlement plan under Chennai – Kanyakumari Industrial Corridor Project (CKICP), Chennai and funded by Asian Development Bank.
Position held
Approved Civil Valuation Engineer
Activities performed
Verification of evaluated property valuation in Land Acquisition for asian development bank funding. The verification includes the site visit, calculation of land and property worth made by highway local body personal, approval of final valuation to sanction.
Name of Assignment
Investigation,Design,Construction of Roads and UTILITIES FOR LPS ZONE 7, Project Cost: 867 Cr INR
Year
May 2018 – December 2019 (Input: 1Y 10m)
Location
Amaravati, Andhra Pradesh.
Client
APCRDA
Main project features
To developing the capital city region, APCRDA has decided to prepare a Smart Integrated Infrastructure works encompassing the Capital City of an area of 217 sq. km which also includes the development of Tier-II infrastructure for 17000 acres of returnable lands under Land Pooling Scheme.
The scope of the project includes ETS Survey, Geo Tech Investigation, Design, Detailed Engineering GFC (Good for Construction) drawings and Construction of Roads- BT & PQC, Storm water Drains, Culverts, Water Supply, Sewerage & STP, Ducts for Power & ICT, Reuse waterline & Avenue Plantation in Layouts for Land Pooling Schemes of Kondamarajupalem (P), Lingayapalem (P), Uddandarayunipalem (P), Velagapudi (P) and Mandadam (P) in ZONE-7 area of Amaravati Capital City, Andhra Pradesh in 760 acres.
Position held
QA/QC Manager
Activities performed
Review of Contractors’ Quality Assurance Plan, Approve materials and sources of materials, review all bituminous mix designs and concrete mix designs proposed by the contractor and approve / suggest modifications in the mix design, laying methods, sampling and testing procedure. Monitor the laboratory and field tests carried out by the contractor and maintain adequate records.
Name of Assignment
Build of Multistory Multi Utility complex, Group Houses, Coimbatore; Funded by: Akthi Sree Shakthi Group; Project Cost: 120 Cr INR
Year
June 2015 - May 2016 (Input: 1Year)
Location
Coimbatore, India
Client
Basavaraja
Main project features
Project consists residential structures which delivers a sense of distinctive modern living including all modern infrastructures and roads in Sree Sakthi Phase 1 & 2 – Saravampatti, Kovai pudur.
Position held
Assistant GM– (Quality control including Materials)
Activities performed
Assess and check the laboratory and field tests carried out by the contractors and carry out independent tests. Directed and monitored progress during project execution to ensure project deliverables conform to design specifications and quality standards. Responsibility includes review of pavement designs of Flexible pavement. Approval of all construction materials like asphalt, emulsion, cement, fill materials of RES etc.
Name of Assignment
General Maintenance of Highways in State of Kuwait - Farwaniya,Jahra Funded by: Ministry of Public Works; Project Cost: USD 1500 million
Year
July 2016 – Sep 2017 (Input: 1Y 5m)
Location
Kuwait
Client
Ministry of Public Works
Main project features
Milling and ashphalt resurfacing and patchrepair o Express roads wih construction of roads with the construction of ditches and strom water network, supply and installation of guard rail and fences.
Position held
QA/QC Engineer cum Material Engineer
Activities performed
Review and implementation of Quality assurance plan and construction methodology of each activity. Responsibility includes review of pavement designs of Flexible pavement. Approval of all construction materials like asphalt, emulsion, cement, fills materials of RES etc. Responsibility also include approval mix design of concrete of high grade, asphalt mixes (DBM, BC, SDBC, SD), wet mix macadam, Granualr Sub base, Grouting, furnishing items etc.
Name of Assignment
Design & Build of Multi-Storey Car Parkat Barzan Camp, G+2 Floors, Pre-stressed precast concrete structure, including Entrance Gate and Roads and Amenities. Funded by: PEO-Private Engineering office Qatar government; Project Cost: USD 1500 million
Year
July 2014 - April 2015 (Input: 1Y 2m)
Location
Qatar
Client
Private Engineering Office
Main project features
Capacity - 500 cars per lot.
Position held
Project QA/QC cum Material Engineer
Activities performed
Preparation of Method Statements. Ensuring that Material testing and sampling are in accordance with Specifications and the materials delivered at site comply with Specifications. Ensure required standards and consistency in quality at the commencement / suggest modifications in mix design, laying methods, sampling and testing procedure and items. Variations in quantities/non BoQ items.
Name of Assignment
Hydrogen Plant Project including infrastructures and roads, Funded by: Indian Oil Corporation; Project Cost: USD 1000 Cr INR
Year
January 2011 - September 2013 (Input: 2Y 8m)
Location
India
Client
Praxair Limited
Main project features
90 million standard cubic feet per day hydrogen plant at the Paradip refinery, Orissa.
Position held
QA/QC Manager including Material Incharge
Activities performed
Responsible for Quality inspections report preparations. Verifying Sample and Certificate of Laboratories. Preparation of method statements, prepare project final documents preparation works. Responsible for review and implementation of Quality assurance using computerized modern technology. Report to the team leader on conformity or non-conformity of the test result and quality of materials. Assist in preparing monthly progress reports, quarterly reports, annual reports, completion reports, final certificates.
Name of Assignment
Al Maktoum International Airport Expansion Project, Funded by: Dubai Airports; Project Cost: USD 33bn
Year
March 2009 - June 2010 (Input: 1Y 3m)
Location
Abu Dhabi, UAE
Client
Department of Dubai Civil Aviation
Main project features
The Dubai Aviation Engineering Projects (DAEP), an autonomous entity responsible for the planning and development of Dubai’s airports, has embarked on a new expansion project at Al Maktoum International Airport. It has a capacity of over 12 million tons of cargo a year and 220 million passengers per year. It is capable of handling all new generation aircraft such as A380 Super Jambo. Biometrics and smart passenger tracking will be used during the expansion to facilitate seamless passenger movement through the terminals. Annual Capacity of 220 Million PAX PA.
Position held
Sr. QA/QC Engineer cum Material Engineer
Activities performed
Preparation of Report cum Quality Inspections. Verifying Sample and Certificate of Laboratories. Preparation of Method Statements, Inspection test plans. Project Final documents Preparation works. Ensuring that Material testing and sampling are in accordance with Specifications and the materials delivered at site comply with Specifications. Ensure required standards and consistency in quality at the commence of suggest modifications in mix design, laying methods, sampling and testing procedure and items. Fully familiar with material property of construction material, technical specifications and procedures of material tests and testing equipments.
Name of Assignment
Ras Gas Onshore Expansion project Phase 2 Funded by: Qatar oil company Project Cost: 2500 million
Year
February 2007 - November 2007 (Input: 9 month)
Location
Qatar
Client
Ras Laffan Liquefied Natural Gas Company Limited
Main project features
Multi-billion dollar expansion project to bring the company LNG production capacity to approximately 37 MTA with the completion of seven operational trains including roads and infrastructures
Position held
Senior QA/QC and Material Engineer - Civil
Activities performed
Periodic inspection and field testing to ensure the materials and the works are in line with the specification. Preparation of method statements, prepare project final documents preparation works. Responsible for review and implementation of quality assurance using computerized modern technology. Report to the team leader on conformity or non-conformity of the test result and quality of materials. Assist in preparing monthly progress reports, quarterly reports, annual reports, completion reports, final certificates.
Name of Assignment
Construction of New Avenue, Plant Access Road and Miscellaneous Roads at Ruwais, UAE Funded by : GASCO
Project Cost : 1100 million
Year
Feb 2005 - July 2006 (Input: 1Y 6 month)
Location
Ruwais, UAE
Client
Gasco
Main project features
Construction of new avenue including construction access road, under ground pressure pipe line, drainage systems, along their accessories, pipe racks and foundations, street lightings including all electrical and telecommunication systems.
Position held
QA/QC Engineer cum Material Engineer
Activities performed
Review and implementation of Quality assurance plan and construction methodology of each activity. Responsibility includes review of pavement designs of Flexible pavement. Approval of all construction materials like asphalt, emulsion, cement, fills materials of RES etc. Responsibility also include approval mix design of concrete of high grade, asphalt mixes (DBM, BC, SDBC, SD), wet mix macadam, Granualr Sub base, Grouting, furnishing items etc.
Name of Assignment
Yanpet Road and Housing Project ( infrastructures & roads) Phase-III Royal Commission, AL-Sinaiyah, Yanpu, KSA; Funded by: Royal commission Saudi Arabia; Project Cost: USD 1200 million
Year
January 2003 - February 2004 (Input: 1Y 2m)
Location
Saudi Arabia
Client
Yampu Petroleum Corporation
Main project features
Project comprises of Urban Development with all amenities like mosque, hospital, road and sewage system
Position held
QA/QC and Material Engineer
Activities performed
Implementing Quality system procedure through spot checking, verifying samples & certificate of laboratories. Preparation of field inspection reports, method statements. Preparation and establishment of quality assurance systems/ programs for the project and ensure implementation of QA/QC procedures. Instruct the contractor to immediately remove the material if it does not meet the specified quality standard or does not match with the spec.
Name of Assignment
SPC PDH/PP Project, AL-Jubail, KSA Funded by: Jubail Petroleum, Project Cost: 900 million
Year
June 2002 - December 2002 (Input: 7 months)
Location
Saudi Arabia
Client
Saudi polyolefin’s Corporation
Main project features
Produce 455 KTPA of Propylene (Largest in the World at its time) and to produce 450 KTPA
Position held
QA/QC and Material Engineer
Activities performed
Coordinating quality Inspections. Preparation of field inspection reports, method statements. Supervise setting up of materials testing laboratories and ensure that the laboratories are staffed with qualified personnel and equipped with duly calibrated testing equipment during the entire duration of the assignment. Supervise the setting up of field laboratory, hot mix plant and rock crushers with duly calibrated equipment per the contract specifications. Review the formulation of Quality Assurance procedures as per technical specifications.
Name of Assignment
Sri Sathiya Narayana Hospital, Project; Funded by: Private Funding; Project Cost: 20 Cr IND
Year
October 1995 - May 2002 (Input: 4Y 7m)
Location
India
Client
Private
Main project features
Facility with 60 bed hospital with operation theater and all amenities
Position held
QA/QC Engineer cum Material Engineer
Activities performed
Project management done effectively by using pert chart and other planning tools. Inspection of all activities related to building works e.g., Survey, Footing / Piling, Columns, Beams, Slab, Brickwork, Windows & Doors, Internal & External Plaster, Flooring & Tiles fixing works, water proofing, Plumping, Painting, Emulsion painting for interior walls etc. Preparation of Method Statements, Inspection of materials received on site (Cement, Sand, Metal Reinforcement steel, etc.). Report Reparation and documentation for all the above activities.
Name of Assignment
Cheran Tower Project; Funded by: Elango; Project Cost: 50 Cr IND
Year
May 1990 - June 1991 (Input: 1Y 2m)
Location
India
Client
Elango Architect
Main project features
10 story first multi utility complex in Coimbatore.
Position held
Site Engineer cum Quality Engineer
Activities performed
Inspection and management for all activities to Cheran Tower first biggest apartment building in Coimbatore city incorporating ten story apartment design and a swimming pool over the top most floor. Inspections, Preparation of method statements, inspection test plans. Designing and site supervision of site investigation, supervising boring and sampling process. Verify laboratory tests.