Post Job Free

Resume

Sign in

Material Handler Production Associate

Location:
La Puente, CA
Posted:
January 24, 2023

Contact this candidate

Resume:

Lainel Finley

***-***-***

*

aduweu@r.postjobfree.com

m

Summary

Material handler with five successful years providing quality assistance for support to supervisors and managers. Extensive experience locating and organizing product for

overall projects. Strong background with problem-solving abilities which compliment excellent service,communication, and technology skills with computer proficiency. Career

Experience

APA Services Temp Assistant Bonder 05/2019 to present Build composite segments Left,Right forward and Aft Ducts. Torque segments Weigh resin and hardner to fill seams. Log information into Solumina software to process steps on completion of the build .

Sulzer Chemtech Material Handler 1/2019-4/2019

Assemble Hybrid Gauze Material With the use of nail beds.Measure lengths and gauge parts to meet specifications which are used to separate liquid loads in minute particulates for the petrochemical industry.

Aerotek Material Handler 9/2017- 12/2018 Build brick molds for refinery ignighter's. Patch extracted brick for completion of product

to be inspected for company satisfaction for customers' order for shipment.

Corbonyx ARC Facility Foreman/Fitter Welder / machine operator 12/05/2016-8/18/2017 Use blueprints to layout 40' columns 20' channel 4”tube and various angles along with measuring beams (24” web) 40ft. Layout for bolt up location to attach numerous

beams to construct building,companying various hand tools plasma cutter grinders, overhead crane (10 ton) and forklift to move material for loading and unloading shipment. Familiar with long,short 90's and 45 take outs for pipe fitting assembly. Duit Construction Loader/ Laborer 05/2016-10/2016

Operate broom, dry-drum roller and sheepfoot, assist trackhoe operator to set wall bearer,

Flag, lay out area for Geo felt to be applied,install silt fence, dig, clean work area use water pump to pump water.

Aeropro LLC-225 S Leland Norton Way, San Bernardino, Ca 11/2016 - 09/2012 Performed VIP interior Modification

Removed and reinstalled interior components

Fit and trim ceiling panel,sidewall panel, valance panel, side ledge,galleys,lavatory, Deco panel,bulkhead,master bed, side cabinets,conference room for final installation In accorrendance in engineering drawing.

Ability To follow and evaluate (Engineering Change Request)”Under Revision” Procedure and plug notes to accomplish the assignment.Install different kinds of Inserts,rivets,dome nuts,nut plates,helicoil inserts for interior assembly. Application of various types of bonding resin and sealant for composite repair,fiberglass repair, smooth successive layers of materials as necessary to Secure build up free from wrinkles,air pockets and voids molding and repair uneven surface.Use various types of sandpaper,polishes,adhesives,masking mediums Bonding compound and resin finish materials.hand tools and various power tools to Disassemble and assemble parts .

Working with composite repair for uneven surface,smooth successive layers of material as necessary to secure build up free from wrinkles,air pockets and voids Molding Panels From honeycomb.performed any job assigned by the lead. Excel Safety Consultants Inc. Fire Watch Hole Watch 02/05/2016-03/18/2016

• Inspect area of vessel for slip trips and falls,inspect welders,boilermakers and inspectors.

• Log in each person making an entry and exiting vessel (name date and time).

• Check for proper PPE,Ty-vek,full harness and lanyards fresh-air face mask and or shield.

• Inspect fire extinguisher A,B,C label,check for charge and last inspection label. Employee Solutions Production Associate 07/01/2015-09/28-2015

• Repair 12v-24v display signs with volt-ohm meter for complete circuit to replace ballast, LED's and audio.

Standby Personnel Material Handler /Installer 02/02/2015-06/13/2015

• Coordinate material via internet-unit mark summary.

• Provide individuals specific conveyor beds, motors, supports,curves and belts.

• Communicate directly with leadmen and linemen on out of stock material.

• Prepared inventory sheets to inform management to order more parts. Standby Personnel Supervisor MGT Construction 09/2014-01/2015

• Coordinate and manage crew on meetings, conferences and special events.

• Processed orders and ensured accurate information was distributed to various locations.

• Assist journeyman with pulling 3”and 12” cast iron water pipes,1”and 2” for fire hydrants.

• Installed ceiling fans, receptacle, light switches, Sinks, faucets, toilets, garbage disposals. Ardsley's Group Park Forest Homes Maintenance Technician 05/06/1999-02/12/2007

• Installed kitchen countertops and sinks, bathroom vanity sinks, entrance and exit doors.

• Prepare and replace floor tile,subfloors, p-traps,toilet wax rings, windows,screens and assist with the replacement and repair of HVAC units.



Contact this candidate