Stephen W. Horton

Ephrata PA ***** • aduupu@r.postjobfree.com • 352-***-**** • www.linkedin.com/in/stephen-horton-80402022/

Experienced Electrical Planner

Dynamic electrical construction professional with over 20 + years’ experience in the nuclear industry.

— Key Qualifications —

Skilled in managing successful, on-time, and within budget, electrical planning projects.

Experience collaborating with design engineering to ensure the accuracy of project plans and resolve unforeseen issues in the field, during the implementation of new engineering designs in an operational nuclear facility.

Valuable experience as a technician, foreman, general foreman, and supervisor, combined with thorough knowledge of all national codes and specifications for electric and other craft areas.

Adept in all aspects of the electrical field of construction, including: formula calculations, blueprint and schematic reading, building as built drawings, cable raceway systems, conduit support systems, conduit bending calculations, underground duct bank systems, cable pulling systems, fire alarm systems, installation of main distribution systems and panels, and other technical aspects of the electrical industry.

Proficient in Microsoft Excel, Word, Excel, PowerPoint, Outlook, ESOMS, Passport, PIMS.

Nuclear Experience

300 Qualified Planner

CB&I / Aptim / Allied Power Services, 1/2016 to Present

Peach Bottom Atomic Power Station, Limerick Generating Station

Serve as a Supplemental Planner with PIMS / Passport 300 qualification as an Electrical Planner. Supervise and manage complex electrical modification projects including: Acid house, Fukushima mods, HCVS, ROWS, generator rewind, feed water heater replacement, CST / heat trace removal and replacement, and HPCI / RCIC level switches to name a few. Ensure accuracy of proposed engineering changes and write necessary engineering change requests. Create thorough and accurate technician work order activities, procure all required materials / parts, and create clearance requests and fire systems impairment requests. Utilize customized management tools, including MS Excel spreadsheets, to track project progress. Collaborate with other project stakeholders, attend project meetings, develop strategies, and influence project workflow.

Create 100% accurate, and safety driven work orders, avoiding delays and allowing for new engineering designs to be implemented in an operating nuclear facility.

Implemented a new process, at Peach Bottom, Limerick, TMI, Fitzpatrick, Lassal, Dresden, St Lucie, Turkey point Nuclear Power Houses, resulting in the update of 30-year old technical specifications, which saved the client countless amount of revenue.

Served on a cross-functional project team that reviewed, analyzed, and rewrote an ambiguous nuclear procedures and specification. To include new safety related electrical support systems

Lead Electrical Superintendent / Electrical Superintendent

CB&I, 1/2012 to 1/2016

Bechtel Power Corporation, 10/2010 to 12/2011

Turkey Point Nuclear Generating Station, Sea Brook Station Nuclear Power Plant, Dresden Generating Station, St. Lucie Nuclear Power Plant, Point Beach Nuclear Plant, Crystal River 3 Nuclear Power Plant

Provided daily oversight for a variety of Nuclear facility modifications during nuclear outages and EPU / RHR project upgrades, including NFPA 805, Cyber security, DAM 1 Temp Power installation, EDG mods, GSC mods, etc. Supported and collaborated with design and field engineers to resolve project issues including modifying operating plant electrical system designs. Coordinated project workforce; managed the scheduling, man loading, estimates, budgeting, personnel safety, and adherence to company and client QA / QC procedures for 180+ craft and sub-contractors. Liaised between the client and the sub-contractors to ensure work was completed on schedule. Managed client documentation and ensured that all standards and procedures were maintained throughout project lifecycle.

Selected Contributions:

Successfully managed the staffing and scheduling for a large number of nuclear facility modifications.

Ensured the timely completion of a $700M EPU project.

Electrical Experience

Journeyman Wireman Supervisor

International Brotherhood of Electrical Workers (IBEW), Local Union 1205 – Gainesville, FL, 10/2000 to Present

Worked in domestic and overseas locations for a variety of contractors. Managed all aspects of electrical installation projects ranging in ranging in complexity from residential wiring to heavy industrial. Notable projects include: Hoover Dam Bridge Bypass, Boston, Massachusetts Central Artery, IBM’s Fishkill Micro Chip Plant, City of Las Vegas Water Reclamation, various Power Generation Stations including: Turkey Point, Port St. Lucie Crystal River, Point Beach, Baxley.

Electrical Supervisor

Halliburton – Baghdad, Iraq, 9/2003 to 4/2004

Collaborated with the Army Corps of Engineers to assess electrical distribution systems and rebuild military installation power systems in Baghdad, Iraq. Oversaw 150 + locale electrical workers, secured millions of dollars’ worth of required tools and materials from outside vendors, and scheduled craft contractors to ensure projects were completed on time, within scope and budget limitations.

Training, Licenses & Education

International Brotherhood of Electrical Workers (IBEW), Local Union 1205

Journeyman Wireman License, #A204561, 10/1998 to Present