Ashraf Mohamed Zakaria Eid
DCS Commissioning Supervisor
Mobile No. : +971********* -- 543908406
+201229134777-01278523472
Address : Sultan Bin Zayed St-Abu Dhabi- U.A.E
E-Mail : aduum8@r.postjobfree.com
PERSONAL DATA
Date of birth : 25 /10 /1978.
Place of birth : Alexandria.
Nationality : Egyptian.
Marital status : Married.
Military Service : Exempted.
Institute of Technical Industry.
Mar2022 Till Sep 2022
Worked as Commissioning and S/UP Supervisor in Sharja Water Treatment Plant. Activities:
Pre commissioning& Commissioning Procedures like Air Blowing, Water Flushing, Chemical cleaning, Boxing Up, RO element Installation, Filling of Sand, Gravel and Chemicals Lined Up for all Equipment and Initial S/UP
F eb 2019 till Dec 202 1
Worked in BP WND (West Nile Delta Gas Development Project) with BP Production Team as CRT
(Control Room Technician).
Gas Processing (Slug Catcher, H P Separation, Dehydration).
Condensat Treatmen t Unit
Utilities (MEG Treatment, Hot oil system and Water Treatment)
Subsea and Umbilical Line
Roles& Responsibilities:
Ensures Optimum of the plant at all times as per SOP.
Monitoring, Maintain and Analyses Performance Parameters of The Plant.
Performs safe plant S/UP & Shutdown Procedures.
Preparing the following shift reports
Responsible for troubleshooting and Mitigating abnormal Parameters on process
Participates in Environmental, Health and Safety. Feb 2017- Aug 2018
Worked in GS Engineering & Construction as (DCS ) Supervisor Pre commissioning& Commissioning Team in ERC Egyptian Refinery Company (TAKRIR).
Commissioning Activities;
Line Flushing>Air Blowing, Steam Blowing, Chemical Cleaning and Drying.
DCS Commissioning, Instrument loop test, Function test, Logic Review, Compare between DCS Graphic and Logic.
Vessel Inspection, Internal Install, Catalyst Loading, Chemical Loading,
Preservation, Reinstatement, Leak Testing, Refractory System Dray Out
MRT > (Mechanical Running Test ),
Oct 2002- Oct 2016
Worked in MIDOR Refinery as Field Operator, DCS Panel Operator and Area Supervisor.
CONTACT INFORMATION
EDUCATION
Experiences
Activities:
Monitor and analyze variable parameters to maintain optimum of all processes.
Start-up and shutdown in accordance with SOP for maintenance or Emergency.
Planning and controlled changeover/ shutdown of plant equipment for maintenance purposes.
Shift Production Control Room Log and Other reports related to Equipment Operation.
Operates pumps, compressors, fans, dryers, control valves and other equipment to achieve optimum operating conditions and product quality in Some Units for example
Naphtha Hydro Treating (NHT).
Naphtha Splitter.
Plat forming.
Continues Catalyst Regeneration (CCR).
Hydrocracker Unit (HCU).
Refinery Utilities.
Naphtha Isomerization Unit (ISOM).
LPG Merox Unit.
Diesel Hydro Treating (DHT).
Gas Treatment Unit.
Kerosene Merox Unit.
Refinery Fuel Gas.
Oct 2001- Sep 2002
Worked with Foster Wheeler Petroleum Services in same Refinery and same Units. Apr 2000- Jul 2001
Worked with TECHNIP ( T T I L – SNC ) in same Refinery as Forman Pre commissioning & Commissioning and Start Up in Hydrocracker unit and Hydrogen. Jul 1999-Mar 2000
In DAIELIM INDUSTRIAL COMPANY in same Refinery worked as pipe fetter and senior Pre commissioning & commissioning.
Jon1998-Jul 1999
In PETROJET COMPANY worked in ALEXANDRIA PETROLUM COMPANY . Feb1996- Apr1998
Worked BROWN & ROOT. Ltd COMPANY in BADR ELDAEN PETROLUM COMPANY in OBAIYD field Development as Pipeline Foreman to Installed & Repaired Pipes and Valves High Presser. Sep1992-May1995
In Alexandria Arsenal Co in Alex as PIPE FETTER and ARC Welder. Languages skills written and spoken
Arabic : Mother Tongue.
English : Excellent ( American language course level 11 ). Computer skills
Office XP Software.
3D Modeling.
Photoshop 7
COURSES
International Human Resources Development Corporation Course > For : Basic Refinery Operators Training Program.
Uhda Petrochemical Training Course > CRU Simulator
OGS (Oil &Gas Skills ) in :
Automation Control System (PLC-DCS).
Advanced Process Control System.
Pumps and Compressors (Mechanical Movers).
Water Treatment (Waste Water, Sea Water Desalination).
Gas& Steam Turbines.
Thanks
Ashraf Mohamed Zakaria