Post Job Free

Resume

Sign in

Electrician, QAQC, electrical supervisor

Location:
Splendora, TX, 77372
Posted:
January 22, 2023

Contact this candidate

Resume:

Cory A. Hinojosa

***** ***** **.

Splendora, Tx. 77372

Cell: 832-***-****

aduubn@r.postjobfree.com

OBJECTIVE

“I want to excel with a company that can benefit from my 30 years’ experience in I&E supervision and craftmanship that can offer me with career enriched opportunities.” TITLES

I/E Construction Manager

I/E Coordinator

I/E QA Inspector

I/E QC Inspector

I/E Superintendent

I/E General Foreman

I/E Foreman

I/E Technician

EDUCATION & CERTIFICATIONS

South Houston High School 1989

IEC-SBCCI Electrical Code 3-2003

San Jacinto College-DCS Operator Control Systems 3-2012

Journeyman Electrician License #83330

NCCER (Written) Industrial Electrician 7-2000

NCCER + #1017676 (Performance Verification) Industrial Electrician 9-2012

Micro Soft Office 2016

T.W.I.C. Holder

REFERENCES

Amber Jenkins 281-***-**** Business Development Manager

Don Cruz 713-***-**** Quality Manager

Greg Felicien 281-***-**** Construction Manager

Eden Dejvongsa 281-***-**** T/A Project Consultant

Theodore Diaz 832-***-**** Project Manager

Alex Gutierrez 832-***-**** I/E Manager

Rudy Aguilera 832-***-**** Project Superintendent

JC Davis 499-***-**** Construction Manager

EMPLOYMENT

Dooley Tackaberry Ph: 281-***-**** I & E Technician 2020 to 202?

Responsible for building and equipment electrical maintenance and projects.

Insure that all maintenance and project installations were being performed productively and safely.

Made sure all I&E installations were done by client engineering standards and current NFPA Fire, Gas and NEC Code.

Responsible for developing as-built drawings for project managers and designers to revise their construction drawings thru my red-lines and drawing mark ups.

Installation of project electrical, instrument, fire & gas equipment: PLC’s, distribution panels, fire alarm control panels (FACP), instrument J-boxes, motor & controls, transformers, lighting, receptacles, switches, heaters, thermostats, fire alarm horns, strobes, manual pull stations, thermal heat sensors, solenoids, pressure, temperature & flow transmitters, conduit, cable tray etc.

QAQC all electrical, instrument and fire and gas installations, loop checks, commissioning and startup. UP Ph: 281-***-**** I & E QA Inspector 2018 to 2020

Report to the client's biweekly QAQC meeting to receive our assigned capital project spreadsheets.

Develop FCO’s (functional check out) inspection forms for projects using the Construction Tracker software.

Develop in O-Drive each project package broken down into soft folders containing all FCO’s and drawings.

Did daily inspections, testing and documentation of all project I&E equipment, materials and installations with QC.

Made sure all I&E installations were done by client engineering standards and current NEC Code.

Interface with the client Project Mngr., coordinator and key personnel on a daily basis for project updates and or changes.

Update drawings in O-Drive with field or engineering changes such as red lines, as-built and drawing markups.

Interface with operations, coordinators and techs for an organized, controlled project startup and turnover. Jacobs Ph: 281-***-**** I & E QC Inspector 2018 to 2018

Responsible for building detailed ITP’s (Inspection Test & Project books for multiple capital projects.

Did daily inspections, testing and documentation of all project I&E equipment, materials and installations.

Made sure all I&E installations were done by client engineering standards and current NEC Code.

Went to weekly 3 week look ahead meetings to prioritize projects while also keeping up with backlog.

Interact with client coordinators, designers, engineers, document control and 3rd party QA for IFC drawings, red lines, project updates, notification of completion and care, custody, control & turnover. SCR Ph: 913-***-**** I & E QA Inspector 2017 to 2017

Coordinate with day shift and night shift Construction Mgrs., Quality Mgr. and key personnel via e-mail for day shift to night shift turnover progress report.

Interact with the field I/E supervisors for visual inspection and updates on their project progress.

Witness IR’s making sure they adhere to client’s specs, details and work scope before signing off on their QVD’s.

Inspect and sign off on all problem loop folders after verifying the issues have been corrected for commissioning.

IE Group Ph: 281-***-**** I & E Superintendent 2017 to 2017

Responsible for developing as-built drawings for clients designer to revise their P&ID’s thru my red-line and drawing mark ups.

Coordinate with operations and maintenance for any updates on changes, deletions or add-ons to their facilities process.

Supervise small I & E projects at different client locations from pipeline skid addition to motor control and instrument loop upgrades.

Responsible for building I & E loop folders for commissioning TGE Ph: 281-***-**** I & E General Foreman 2016 to 2017

Start every morning off with a safety meeting, craftsman’s job updates and job safety analysis (JSA).

Interact with the client Project Mngr. and key personnel on a regular basis for project updates and strategies.

QC all installations per client work scope and insure all work is being performed productively and safely.

Coordinate with operations and maintenance for an organized, controlled project startup and turnover. Tepco LLC Ph: 281-***-**** Const. Mgr / I&E Coord. 2014 to 2016

Manage DCS Modernization Project from Fisher Provox system to Honeywell Experion PKS.

Interface with the client Project Mngr. and key personnel on a regular basis for project updates and strategies.

Monitor several project contractors to ensure that work scope is being performed productively and safely.

Coordinate with operations, maintenance and coordinators for an organized, controlled and complete project startup and turnover.

Support project engineers by going over IFA loop sheets, location dwgs., spreadsheets and P&ID drawings with field red-lines, as built and drawing mark-ups to be IFC ready.

Establish procedures, schedules and pre-startup safety review (PSSR). DW Pipeline Ph: 832- 217-3380 I & E Superintendent 2012 to 2014

Manage, plan and schedule several projects for LyondellBasell.

Interface with plant and contractor engineers and key personnel on a regular basis for project updates and strategies.

Monitor several project contractors to ensure that work scope is being performed productively and safely.

Oversee the construction and installation of the electrical/ instrument j-boxes, conduit, cable tray, tubing tray, supports and cable/wire for lighting, instruments pumps and controls.

QAQC all I & E installations, loop checks, commissioning and startup.



Contact this candidate