Post Job Free

Resume

Sign in

Telecommunications Engineer Cable Technician

Location:
Palm Coast, FL, 32164
Posted:
January 21, 2023

Contact this candidate

Resume:

**** * **** ****,

Orland. Fl *****

adutwt@r.postjobfree.com

ROHAN DEAN TAYLOR

`

Telecommunications engineer with over 30 years experience in the installation, optimization, and troubleshooting of telephone, cellular, and IT networks.

SKILLS & ABILITIES

LTE, CDMA, and GSM commissioning

RBS installation (indoor and outdoor cell-sites)

Structured cabling, rack and stack, data room operations

Reading and interpretation of blue prints, schematic diagrams, and MOPs

POTS and Fiber Optic splicing, troubleshooting, and repairs

EXPERIENCE

PROJECT LEAD, DS0 Fiber Transformation. IS3Solutions. Port Authority of New York and New Jersey (PANYNJ)

08/2019 – 08/2021

Project lead for the Port Authority’s T1 circuit migrations to new fiber backhaul. Duties include coordinating and scheduling jobs with clients for DS0 teams, site visits, analyze DS0 circuits, log data, troubleshooting circuit issues, validation of all repaired circuits, and the inventory and updating of the PA’s 1,360 DS0 circuit data base. Additional responsibilities are the organizing, coordinating, and monitoring of the DS0 teams’ daily activities as it relate to procedures before and after migration. Supervising and quality auditing of Verizon’s contractors installation of TCC equipment.

INTEGRATOR LEAD, RIGHTECH. AT&T NJ / PA Markets.

09/2017 – 07/2019

Installation, integration, and commissioning of Nokia’s Airscale (5G) technology. Job functions included power works in power bays (terminating to -48Vdc power racks), cable routing on cable racks secured with waxed cord. Integration and commissioning of indoor and outdoor cell environments utilizing ftp clients. Troubleshooting of alarms, E911 call testing, COPs, commissioning reports, and other documentations and reports.

INTEGRATOR LEAD, RAMAPO COMM CORP. T MOBILE NJ Market

02/2017 – 05/2017

L700 & L1900 projects. Installation of RBS 6102, 6131, and ODEs. Complete power upgrade for PSU AC, upgrade power units (PSU, PDU, and SPD). Terminate hybrid power, installation of radios based on cabinet configuration. Add, replace, or remove nodes based on configuration. Configurations applied were 702 Cu/Cc, 702 Av / Av 2.1, 702 4sector, 704E, 792 4sector, 792DB, 794DB, 794FDB, & 795FDB. Terminating hybrid fibers, migrations of DU for LTE, modification of IDB, scripting of UMTS nodes, installation of new Base Band Unit (XMU), and troubleshooting. SRS call testing, E911, and COP pictures completed my duties.

CABLE TECHNICIAN, CREW FORCE. New York Metro.

09/2013 – 01/2017

The responsibilities of routing and terminating CAT 5, 6, and 6E cables on patch panels and station jacks, installing IDF hardware including cable racks, cabinets, back boards, and grounding system, installing AV systems, DAS installs and configurations. Data center operations: build and troubleshoot data circuits from servers to patch panels.

RBS INSTALLER / INTEGRATOR, FUSION SOLUTIONS. T MOBILE NY / Westchester Markets

02/2015 – 09/2015

Modernization projects. 2C, 3C, 4C, 2B 3C, configurations. Installed & integrate nodes for AWS, PCS, GSM, & LTE Technologies. Scope included; installation of new RBS 6102 or 6131 cabinets. PSU AC 04 upgrade, install and strap battery string, installation of radio, power & digital units, hybrid power & fiber terminations, loading software and scripts for technologies using EM, OMT, HYT, & TOTAL COMMAND. Call testing, E911, and COP completed my duties.

RBS INTEGRATOR / INSTALLER, RIGHTECH. T MOBILE NJ / PA Markets.

05/2014 – 08/2014

Installed, integrated, and troubleshoot Ericsson’s Radio Base Stations (RBS) 3100, 6200, and 6600 series for modernization project. Configurations completed included; 2C, 3C, 2B, 3B, & 4 SECTOR 2C sites. The completion of RBS check list, call testing, E911, and COP

RBS INSTALLER, ORIN USA. US CELLULAR and VERIZON NEW ENGLAND / MIDWEST Markets

04/2013 – 10/2013

Installation of RBS 6200. Not excluding power runs from Emerson power bays to RBS, mounting of radio units (B12 & B5) on racks, connecting oil cables from radios to SPDs, grounding units and RBS to MGB, installation of cones, GPS modules, splitters and surge arrestors.

EDUCATION

NOKIA TRAINING CENTER - OHIO – AIRSCALE INSTALLATION AND INTEGRATION

ERICSSON’S TRAINING DIVISION – TEXAS – TELECOM FUNDAMENTALS & LTE COMMISSIONING

AT&T WEB BASE TRAINING & VENDOR CERTIFICATIONS

UNIVERSITY OF TECHNOLOGY – JAMAICA - ELECTRONICS AND ELECTRICAL PRINICIPLES

CABLE & WIRELESS TRAINING DEPARTMENT – JAMAICA – TELEPHONY TECHNOLOGY

UNIVERSITY OF PHOENIX – ARIZONA - CCNA NETWORKING

Working towards associate degree in Information Technology.

ST. ANDREW TECHNICAL HIGH SCHOOL – JAMAICA --DIPLOMA IN ENGINEERING TECHNOLOGY

CERTIFICATIONS

Ericsson LTE Commissioning

Nokia AIRSCALE certification

L1900 MHZ Installation and Integration

RBS Basic Installation Technique

Leadership Training

OSHA 30

CPR

Microsoft (word, excel, and power point)

FileZilla, Total Commander, and Hyper-Terminal.

Basic Cable Splicing

E Side Termination and Splicing

Fiber Optic Splicing (Fusion)



Contact this candidate