Richard Sullivan
adutjr@r.postjobfree.com
Cell: 781-***-****
Permanent Address:
Weymouth, MA 02188
OBJECTIVE Obtain Full-Time Position in the Engineering Department utilizing related experience, leadership and interpersonal skills.
Commonwealth Partners, Boston Ma. 2017-2022
Chief Engineer
200 Pier4 Boulevard.
Oversee construction from basic core to installing building systems
Involved with commissioning building & tenant floors
Implement all equipment into Angus Work Order System
Hire staff to assist with tenants needs
Work out a verity of post construction concerns
Added value to property with garage floor coating & wall painting
Adjust BMS daily to conserve energy an insure tenant comfort
2020 rated best for energy savings in company portfolio for square footage
CW Services, Boston Ma. 2016-2017
Chief Engineer
400 & 470 Atlantic Ave.
Implement all equipment into Angus Work Order System
Commission all new VAV boxes from 400 construction
Repair ductwork issues from 400 construction on 3rd floor
Install VFD on 400 Domestic Water Pumps
Install new Domestic Water Pumps at 470
Rebuild ERV Heat Wheel units on 470 Rooftop
Work with C3 Engineering on Smoke EVAC for Boston Fire
Tennant Surveys were Good to Excellent after many repairs to both buildings
EXPERIENCE DTZ, South Boston, Ma. 2013-2016
Assistant Chief Engineer
1 Iron Street State Street Bank
Hire 10 engineers to staff for 24/7-hour operation per tenant lease
Implement all equipment into Workspeed work order system
Oversee new construction during Phase 1 floors 1-5, Phase 2 floors 6-12
Assist with startup and testing of new building and a ten-floor parking garage
Assign scheduled equipment PMs to engineers
Manage tenant with new building system issues
Colonnade Properties, Boston, Ma. 2010-2013
Chief Engineer
400 Atlantic Ave
Manage building for tenant lease renewal
Operate HVAC equipment
250 Summer Street, 400 Atlantic Ave
Oversee new contracted venders
Implement Angus Any Where work order system
Managed two total new roofing projects
Managed a 100% of 8 floor repointing project
Plan 6-inch Bypass Valve project on cooling tower piping
Plan 4-inch Gas Main installation to change oil fired boilers
Assisted with improved tenant relations, tenant signed ten-year lease
Assisted with new tenant build-out on 12,000 square foot space
Northland Investment Company, Boston, Ma. 2008-2010
Chief Engineer
160 State Street, 250 Summer Street, 400 Atlantic Ave
Responsible for updating capital projects for buildings
Bid out all contracts for operations
Implement Aware PM system
Installed Water Abatement meters on cooling towers
Installed VFD controls on pumps & tower fans with NSTAR rebates
Assisted with NSTAR rebates on tenant lighting
Started weekly meetings with staff on operations
Improve tenant relations by more contact and support on any issues
Equity Office Properties, Boston & Cambridge, MA 1997-2008
Chief Engineer
175 Federal Street & South Station
Responsible for building operations, tenant build outs and Life Safety
Managed installation of “Protect System” with Homeland Security
Assisted with Central Artery Transportation disruptions during Big Dig
Installation of Cooling Tower and applied for Nstar rebates on VFD fans
Upgraded HVAC, Energy Management System to DDC on Air Handler Units
Budgeted and implemented rebuilding of chillers
Organized repairs of HVAC equipment
Implemented new PM system
Replaced Domestic Water pump station, add Water Abatement with Boston Water & Sewer
Reviewed bids for new EPDM Concourse roof and facade panels, skylight, rear window caulking
Implemented Facade study with three year pointing project
Assisted with design, and budget for new roof installation, solving years of tenant complaints
Chief Engineer
150 Federal Street
Responsible for building operations, tenant build outs and Life Safety
Installed fourteen VFD’s on floor Air Handler Units with NSTAR rebates
Replaced piping design for sewer main tidal tank to street main
Troubleshoot VAV heating boxes throughout 28 floor office building
Budgeted and managed installation of new roof on lower section of building
Shut down and repaired main condenser water system in building
Senior Engineer
245 First Street
Responsible for operations of four buildings
Install Water Abatement in three buildings with City of Cambridge
Implemented five-year capital plan
Installed first Energy Management System in two properties
Installation of new make-up air units
Managed clean-up of lobby due to street flooding from broken main city pipes numerous times
Responded to 4 alarm fire in Restaurant located in building and recovery back to operation
Implemented restoration with restaurant owner to reopen in 2 months
Beacon Management Company, Boston, MA 1987-1997
Start-up Engineer
One Post Office Square
Responsible for 42 story building operations, tenant build outs and Life Safety
Installed first leak detection system on hot water tanks
Facilitated Indoor Air Quality cleaning procedures
Cambridge Center Marriott, Cambridge, MA 1986-1987
Senior Refrigeration Technician
Troubleshoot problems of new equipment
Assisted with opening of new property
EDUCATION Northeast Institute of Industrial Technology, Boston, MA
Air Conditioning and Refrigeration program, 1985-1986
LICENSES
HVAC Refrigeration Technician
Sprinkler Journeyman
Asbestos Training
OSHA Safety Training (10 & 30 Hour)
SKILLS Microsoft Office, Microsoft Excel, Internet Explorer
AWARDS Equity Office Properties Steps to Success Award
Equity Office Properties Certificate of Appreciation Award
Tenant Recognition During Build Outs Award
Assisting Boston Area During Extreme Cold Award
Outstanding Performance and Lasting Contribution to Center Plaza Award
Northeast Institute, Dean’s List