Post Job Free
Sign in

Project Manager Chemistry Lab

Location:
Riverside, CA
Salary:
155k
Posted:
January 19, 2023

Contact this candidate

Resume:

JACKSON BARTLETT KISTLER

**** ******** *****

Riverside, CA 92507

Cell 951-***-****

************@*****.***

PROFESIONAL EXPERIENCE

Sept 2021 – Current SENIOR ESTIMATOR / SUPERINTENDENT – Everlevel Holdings, Chino Hills, CA. Estimated and Awarded: Solar Parking Structure Corporate Yard and The Transit Bus Station Solar Roof D/B in Porterville, CA, Sloped Bank Improvements Santa Anna, CA . Supt. on Caltrans Shoulder and Traffic Rail Replacement in Route 210 San Bernardino and Route 10 in Beaumont. Supt. of City Porterville Annex 476 New Sewer System. (Self-perform conc Manhole bases, conc site improvements, install of 12” Sanitary Sewer Pipe, Mandrel / Air test system).

May 2019 – Sept 2021 SENIOR ESTIMATOR – Rockforce Construction, Lake Forest, CA. Estimate Heavy Civil Projects: Olinda Landfill Erosion Repairs – Brea CA, D/B MLK Family Care Center – LA, CA, D/B LAC+USC Family Care Facility – LA, CA, D/B SCE Service Center - Tulare, CA, L/S San Lorenzo Sewer Lift Station – Santa Ana, CA. (Self-perform: earthwork, underground & above ground piping, concrete, light steel erection, and carpentry).

Sept 2018 – Jan 2019 CHIEF ESTIMATOR – R.I.C. Construction, Inc., Hesperia, CA. Estimate State and City projects for Municipal Water Stations. Estimated and Awarded $5M Amethyst Pump Station and $3M Arroyo Pump Station. (Self-perform: all grading, underground & above ground piping, concrete, and electrical).

Feb 2017 – April 2018 SENIOR ESTIMATOR – Hal Hays Construction, Inc., Riverside, CA. Estimate State and Federal projects for Department of Corrections, Police Departments, Fire Departments, University of California Riverside, United Technologies Corporation, Golden State Water Company Treatment Plants, SCE Utility Stations, San Bernardino International Airport Warehouse, all from $1.5M to $13M. Design / Build project: SCE Storage Warehouse in Redlands and GSWC Ballona Plant Improvements. (Self-perform: all grading, underground utilities, concrete, drywall, doors & plumbing).

July 2014 – Feb 2017 SENIOR ESTIMATOR – Fullmer Construction, Inc., Ontario, CA. Estimate concrete tilt-up warehouse and office projects from $3M to $43M. Projects included specialty Tenant Improvement build outs involving process piping, medical and or high storage racking. Conceptual estimate to final hard bid proposal based upon final design phase. (Self-perform Concrete)

Dec 2012 – July 2013 SENIOR ESTIMATOR – Robert A. Bothman, Inc., San Jose, CA. Estimate structural concrete, civil and underground projects from $1M to $22M. Projects included large mixed-use, office, hospital, high rise condo, schools & university, grocery stores, Caltrans concrete crash rails & retaining walls, and USACOE Barracks buildings. (Self-perform civil and concrete)

Oct 2011 – Dec 2012 SENIOR ESTIMATOR – Urata & Sons Cement, Rancho Cordova, CA. Estimate structural concrete projects from $2M to $15M. Projects included large mixed-use, office, parking garages, casino, hospital, corrections, geothermal plants, schools & university, subway stations, grocery stores, retail, and multi-story office buildings. (Concrete Subcontractor)

2008 – 2011 CHIEF ESTIMATOR/OWNER – Equus Construction, Sacramento, CA. Estimate and manage completion of structural concrete and masonry projects. Projects included commercial work for: Ralphs, Safeway, Sam’s Club, Walmart, and Nevada City Fire Station.

2007 – 2008 PROGRAM MANAGER/ESTIMATOR – Kitchell CEM, Sacramento, CA. Complete Correctional Projects for the California Department of Corrections and Rehabilitations from conceptual stage (space models), preliminary to final design, update cost estimates, develop bid packages for: architects & engineers, CM firms at risk, G.C.’s at risk, and analyze / negotiate contract agreements. Decide type of construction most suitable for building’s function and provide cost study comparisons of different types of construction for inmate housing units, support and program buildings. Create design / construction project schedules and Cost load project matrix schedule for CDC to manage cash flow for multiple projects using P6.

2005 – 2007 PROJECT MANAGER/ESTIMATOR - KOO Construction, Inc. West Sacramento CA. Project manager / estimator on State and Federal projects for new and remodel construction . Estimate projects and set up project management systems, staff project field team, manage team throughout progress of projects and lead Owner meetings.

1999 – 2004 CHIEF ESTIMATOR – Sequoia Pacific Builders, Inc., Roseville, CA. Manage and complete all project estimates for the company. Provide cost estimates for all types of commercial & retail projects. Complete detail estimates for our in-house concrete and rough carpenter operations. Provide conceptual and hard bid budgets for many Design/Build and multi-story tilt-up conc. projects. Provide cost analysis to ensure the proper building system for individual negotiated projects. (Self-performed Concrete & Rough Carpentry)

1997 – 1999 PROJECT MANAGER – Panattoni Construction. Co., Sacramento CA. Responsible for negotiating many Design/Build contracts for Clients of Panattoni Development desiring commercial office, warehouse, or manufacturing space. Most projects were tilt-up buildings completed by our in-house concrete crews. I continued management of projects from design, through permit, to final Certificate of

Occupancy. (Self Performed Concrete)

1994 – 1997 PROJECT MANAGER – West Coast Contractors, Fairfield, CA. (all public works) Reported directly to the president, managed projects comprised of industrial high tech, commercial and hospital work. Negotiate change orders and mediate resolve disputes with project owners. Provide training / demonstrations / seminars for project managers and superintendents. Other responsibilities include; safety management, quality control, participation in strategic business plan development, coaching / managing project managers and superintendents, bid on new projects bi-monthly to assist estimating dept. (Self Performed Concrete)

1990 – 1994 ESTIMATOR/SCHEDULER – John F. Otto, Inc., Sacramento CA.

Estimated and awarded private and public projects consisting of Medical Hospital, Airport, Parking Garages, State of California work, and Assisted Living Communities. Responsible for writing subcontract agreements, processing submittals, building construction schedule and completing updates on P3. (Self Performed Concrete and Rough/Finish Carpentry)

1989 – 1990 PROJECT ENGINEER – Turner Construction Company, Inc., Irvine, CA.

Completed my internship training working on high rise project in the field assisting Field Superintendent and Project Manager with man hour and material quantity tracking, contract document updates, submittal processing, detail schedule updates, and identification and resolve of possible safety incidents. Assisted estimating team during the tenant improvement build-out phase of the project.

EDUCATION: BACHELOR OF SCIENCE: CONSTRUCTION MANAGEMENT

College of Engineering at Arizona State University,

3 years of Professional Architectural Studies and drafting.

ACCOMPLISHMENTS:

Scholarship: ASU full Athletic; De Boise Academic; NCAA’s Post Eligibility Academic

Wrestling: 1984 Olympic Team – Alternate, Two-time All-American, Div 1, NCAA; Captain (2 years)

COMPUTERS SKILLS:

Proficient in Windows Excel & Word, HCSS Heavy Bid, Timberline, Primavera 6, Sure-Trak, Plan-Swift, On-Screen Takeoff, and Blue Beam.

PROFESSIONAL SUMMARY

Name: Jackson B. Kistler

Current Position: Estimator / Project Manager

Years of Experience: Twenty-nine Years

Other Experience: Three Years of Architectural Design & Drafting, Trade Carpenter/Mason.

PROJECT

Everlevel Holdings (Self Perform: Earthwork, Undergrd/Abv Grd Pipe, Concrete Manholes)

Corporate Yard Solar Parking Structure, Porterville, CA $2.1M

Transit Bus Station Solar Roof D/B Project, Porterville, CA $2.9M

Caltrans Hwy Shoulder and Traffic Rail Improvements $1.75M

San Bernardino & Beaumont, CA

Santa Ana Slope Bank Improvements, Santa Ana, CA $5.75M

City of Porterville Annex 476 Sanitary Sewer System $4.2M

RockForce Const. (Self Perform: Earthwork, Undergrd/Abv Grd Pipe, Concrete)

SCE Service Center, D/B of Haz Mat Bldg, Truck Washdown Bldg, $5M

Truck Maintenance Bldg, Tulare, CA

MLK Family Care Center, D/B 87,000 SF, 3-Story Bldg $34M

Los Angele, CA. Self-Perform $4.6M

LAC+USC Care Facility, 4ea - 3-Story Bldgs, 1ea – 4-Story Bldg $52M

Los Angele, CA. Self-Perform $6.5M

Olinda Landfill Erosion Repairs of Western Slope $800K

Brea, CA

R.I.C. Const. (Self Perform: Earthwork, Undergrd/Abv Grd Pipe, Concrete & Elec)

Amethyst Pump Station Bldg & Pumps at: $5M

Victorville, CA

Arroyo Park Pump Station Upgrade to Bldg & New Pumps at: $3M

Pasadena, CA.

Hal Hays Const. (Self Perform: Earthwork, Underground, Concrete & Plbg)

United Technologies Corporation Facility Improvements at: $2.4M

Riverside, Chula Vista, and San Marcos, TX

CBRE Construction Management for SCE Facilities throughout $1.7M

Southern, CA.

Design/Build SCE Warehouse Storage Building $2.8M

8,000 SF, Redlands, CA

Palm Springs Fire Station No. 4 Expansion/Refurbishment, $4.1M

8,500 SF, Palm Springs, CA

San Benito Jail HC Restroom Upgrades, $13.2M

216,000 SF, Alameda, CA

CDC, Cell Front Door Replacement, $9.6M

36,000 SF, Tracy, CA

Riverside Commuter Transportation Rail HC Parking Upgrades, $1.5M

90,000 SF, Riverside, CA

New View Library $3.7M

5,200 SF, Nuevo, CA

Fullmer Const. The Ranch for First Industrial, (6) tilt-up warehouse/mezz./T.I. $52M buildings, 936,000 SF total, offsite utilities, (3) each newly

constructed streets with all improvements Eastvale, CA

Yorba Distribution Building, tilt-up/mezz./T.I. for Tesla, $9M

246,000 SF, Chino, CA

Lexington Way Distribution Center, 154,000 SF, $5.8M

San Bernardino, CA

El Dorado Stone Distribution Warehouse & Modular Office, $3.5M

85,000 SF, includes offsite utilities, Perris, CA

Bridge Buildings 1, 2 & 3, warehouse/mezzanine/T.I. $11M

217,000 SF, Santa Fe Springs, CA

Citrus Commercial Center, (3) tilt-up warehouse/T.I. Bldgs $55M

1,838,000 SF, Fontana, CA

Ridge Fontana One Warehouse Center, $9.1M

319,877 SF, Fontana, CA

I-10 Citrus Center Distribution Center and T.I., $14M

424,000 SF, Fontana, CA

Soto Industrial Building, Mezzanine and T.I., $6.2M

119,000 SF, Vernon, CA

Century Center II Warehouse / Office Center, $5.2M

220,000 SF, Lakewood, CA.

Space Center Lilac Distribution Center, Tilt-up Warehouse, $4.6M

259,000 SF, Rialto, CA.

First Park at Ocean Ranch, Tilt-up Office/Warehouse, $11.1M

Bldgs 1, 2 &3, 237,000 SF, Oceanside, CA.

South County Kidney / Endocrine Center T.I. & MedClinic $1.3M

New Castle Group, Mission Hellman, Office/Warehouse $4.3M

102,400 SF, Ontario, CA.

Robert A. Bothman (Self Performed Concrete, Earthwork & Site Utilities)

VA Palo Alto Recreation Therapy Bldg, CIP basement with 2-story $2.8M

suspended concrete floors & stairwells (Sub to Halbert Construction)

VA Palo Alto Medical Center Main Loop Road – two CIP Bldgs, $9M CIP Conc. Trench duct, CIP Vaults, (Sub to Clark Construction)

Milpitas and Berryessa Lite Rail Stations – 2 story Conc. Bldgs $6.8M

with suspended stairways and 3’ matt foundation (Sub Shimick)

Santa Clara Technology Center – 3 each, 12-story office Bldgs, $11M

2 each, CIP Utility Bldgs and site concrete (Sub to Hath/Dinwiddie)

Nvidia Office Bldg – Site concrete: planter & retaining walls, $22M

water feature, sidewalks, and seatwalls (Sub to Matt Construction)

Fremont Condo Towers – Place, Pour & Finish 22-story P.T. $480K

suspended slabs, matt foundation, 2 podiums (Sub to Webcor)

Urata Concrete Santana Row, 6-story PT mixed use condo/retail and 3-level $4.2M

Basement Garage, San Jose, CA

Clovis Medical Education Center, Clovis, CA $1.5M

Capitol Lofts, 6 story PT mixed use condo/retail/parking, Sac, CA $3.8M

Kaiser ER Expansion, San Rafael, CA $1.2M

China Town Subway Station, JV w/ C.C.Myers, San Fran, CA $22M

Kitchell CEM (Conceptual Estimator & Program Manager)

Mendota Prison - Tilt-up conc. sandwich panels, Mendota, CA $17.4M

Wasco State Prison – CIP conc., 1,000 cell Facility $520M

Kern Valley State Prison, 500 cell Facility, Bakersfield, CA $320M

North Kern State Prison, 500 cell Facility, Bakersfield, CA $298M

Northern Calif. Reception Facility, Stockton, CA $322M

Estrella Correctional Facility, El Paso de Robles, CA $72M

Pelican Bay State Prison, Heating Hot Water Loop $6.5M

Pelican Bay State Prison, Segregated Housing Unit $14.7M

Upgrade Basalite Mfg Plant, Tracy, CA – preconstruction services $3.5M

KOO Construction, Inc.

SMUD Tool Issue Building Remodel, Sac, CA $3.2M

SMUD Headquarter Basement Improvements, Sac, CA $864K

Renovate Security Offices, Defense Depot, Tracy, CA $640K

SMUD Construction Service Work, Gen. Task Orders – install new infrastructure to support solar panel yard $750K

VA Sacramento National Cemetery, Dixon, CA $3.4M

USACOE, Bldg 18000, Wing B, Camp Roberts, Los Robles, CA $925K

USACOE, Two Bay Hanger, Beale Air Force Base $7.2M

USACOE, Medical Building Renovation, Beale AFB $10.5M

Sequoia Pacific Builders ( Self Performed Concrete and Carpentry)

Sterling Point Shopping Center, 8 Retail Bldgs & Site, Lincoln, CA $4.5M

Placer Bank, Granite Bay, CA. $1.5K Relay’s Shopping Center Renovation $3M

Longs Drugstore – Oakdale, CA. $2M Longs Drugstore – Sacramento, CA $1.75M

Five Star Bank, Rocklin, CA. $800K

Relay’s Westgate Shopping Center, Lodi, CA. $3M

Galt Village Grocery Center, Off & Onsite, 8 Retail building $6M

Williamson Ranch Center, Antioch, CA. $2.8M

Big 5 Sporting Goods, Antioch, CA. $1.8M

Galt Village Center, Six Buildings & Grocery Store $6.5M

Community Swim Park with 2 Olympic Pools $1.5M

Cemo Commercial Bus. Park – 3 Tiltup Bldgs, Roseville, CA. $1.4M

Laguna West Bus. Park Tiltup Bldgs. Elk Grove, CA. $1.6M

Medical Office Park, 5 Buildings, Roseville, CA. $5.2M

Panattoni Construction (Self Performed Tilt-up Concrete)

Design/Build Meyers Tomatoes Produce Storage $2M

Ceronix Electronics Mfg & Storage Facility, Auburn, CA. $4.2M

Mimos Delicatessen, Napa, CA. $164K

Senetek Biopharmaceutical, Napa, CA. $1.4M

Chalone Winery Office Expansion, Napa, CA. $175K

Fp Label Facility Expansion, Napa, CA. $140K

Pokka Beverages & Bottling T.I., Napa, CA. $50K

West Coast Contractors, Inc. (Self Performed Concrete and Carpentry)

Remodel Veterans Hospital, Yountville, CA. $5M

Integrated Manufacturing Technical Laboratory – install new high security system with specialized electronic door hardware throughout facility. $2.9M

Sandia National Laboratories, Livermore, CA. Main Electrical Services & Switchgear – install 6 miles of underground electrical and switchgear for facility to obtain new power source $2.7M

Sandia National Laboratories, Livermore, CA.

Life/Safety Upgrade Highland Hospital, Oakland, CA – remodel all nine floors Energy Saving Retrofit, Highland & Fairground Hospitals – install new HVAC system using more energy efficient equipment and new emergency electrical generator $2M

Oakland and San Leandro, CA.

Remodel & Energy Upgrade for Dept. of Motor Vehicles – install hot water storage tanks underground for HVAC system $600K

El Cerrito, CA.

Air Traffic Control Tower Life/Safety Upgrade $650K

Hayward, CA.

John F. Otto, Inc. (Self Performed Concrete and Carpentry)

State of California Treasurer’s Office Remodel, Sacramento, CA $275K Rental Car Main Terminal, Sacramento Airport $2.25M

UCD Medical Center, Renovate Fourth Floor, Wing B $2.5M

Sacramento, CA

UCD Medical Center, Emergency Room Remodel $3.5M

Sacramento, CA

UCD Medical Center, Emergency Helicopter Pad $2M

Sacramento, CA

UCD Medical Center, Parking Garage Expansion $2.5M

Sacramento, CA

Mercy San Juan Hospital, Main Parking Garage $3.5M

Sacramento, CA

Mercy San Juan Hospital, 3rd Floor Expansion & Seismic Improvemts $3.75M

Sacramento, CA

Sutter Memorial Hospital, Utility Room Expansion & Backup Elec. $2.5M

Sacramento, CA

Rapid Transit Security Office Remodel, Sacramento, CA $550K

UCD Theatre / Auditorium, Davis, CA $350K

UCD Dormitory Remodel, Davis, CA $450K

UCD Chemistry Lab Remodel, Davis CA $195K

Rideout Memorial Hospital, South Wing Addition, Marysville, CA $8M

Turner Construction (Onsite Project Engineer)

Western Digital Corporate Headquarters, 14 story highrise $45M

Irvine, CA

Western Digital Corporate Headquarters, T.I., Phs 1 $7M



Contact this candidate