Post Job Free

Resume

Sign in

Project Manager Commissioning

Location:
Aurora, CO
Salary:
180,000
Posted:
January 15, 2023

Contact this candidate

Resume:

Michael T. Gulas

Denver, Colorado *****

Queens, New York 11357

Mobile Phone #: 646-***-****

aduovy@r.postjobfree.com

aduovy@r.postjobfree.com

linkedin.com/in/michael-gulas-90701848

SUMMARY:

A dynamic analytical person with over thirty-six years of Engineering and Construction experience, in positions of increasing responsibility and complexity. Most recently, for over seven years, owner/operator of independent contractor, serving various firms on projects throughout the USA and Canada with demonstrated success in the roles of:

• Project Executive

• Extensive Engineering Background & Estimating, and Contract Negotiations

• Business Development

• Peal-Estate Development Opportunities

• Data Centers:

• Crypto-Mining

• Edge & Hyperscale opportunities

• Traditional Uptime certified.

• Both Modular & Traditional Build expertise

• Owners Representative

• Senior Level Project Manager - MEP & Traditional Construction

• Project Manager

• Commissioning Manager/Quality Control Inspector

• Director of Operations & MEP Superintendent

• Hospital & Senior Assisted Living Requirements

• Chip Manufacturing Plants & Laboratory Facilities Infrastructure Projects

• Pharmaceutical Projects

• Sprot Facilities, Multi-Tenant Real Estate Developments

• Schools, Office, Transit and Airport Dev elopement Projects

• Data Center Deployment Projects Experience:

• Co-Location Data Center Infrastructure and Facility Deployment

• Live Infrastructure Upgrades

• Edge Data Center Deployment Projects

• Modular Deployment Projects

• Air-Cooled Modular

• Liquid Immersion Cooling Modules

• Single Phase Solutions

• Two-Phase Solutions

• Clean Energy and Ultra Low CO*2 Emission Sites

• Combined Heat & Power Data Center Projects

• Natural Gas Prime Power Deployment with no requirements for UPS or Generator back-up (4-Million per Mw)

• Air Cooled and Liquid Immersion Cooling Applications

• Single Phase Solutions

• Two Phase Solutions

• Hyperscale Data Center Deployment

• Crypto-Mining Deployment Projects

• Air Cooled & Liquid Immersion Cooling Designs

• Alternate Energy Experience:

• Wind Turbine Deployment for Real-Estate Development Opportunities

• Solar Energy Systems for Utility Grid Back-up (25-mW & Larger)

• Solar Residential & Commercial Deployments

• Microgrid development projects (50-kW to 25-mW Deployments & Greater)

• BESS Storage system for both development & grid-level back-up

• CHP Installations to 256-mW with both power and waste heat recovery utilization

• Micro-Nuclear Design Applications for European & American Development Opportunities

• CO*2 Emissions engineering designs & LEED Certification OBJECTIVE:

Currently seeking an Executive and/or Senior Project Manager/Executive level position career with a company where my experience, skills, talent and knowledge will benefit the company and provide new challenges.

WORK EXPERIENCE:

M-2 Energy, LLC January 2021to Present

Numerous development projects involving Multi-family & Senior Assisted Living opportunities, combined with Clean Energy Ultra Low CO*2 Emissions in various locations around the USA. Work includes analysis of bot Federal & State Incentives, Engineering, Estimating and Project management for turn-key real-estate development opportunities from 3.5-Million to 350-Million plus

• Modular Deployment for Data Centers, Crypto-Mining & Edge

• Modular Infrastructure Modules

• Modular deployment for Vertical Farm Box Opportunities w/Alternate Energy Considerations “Wind-Solar-Microgrid”

• Organic Marijuana Growing Farms

• Multi-Family Real-estate Development Projects

• Senior Assisted Living Real-Estate Projects

• Site Development Projects

Michael T. Gulas Owner/Consultant Flushing, NY 11358 Jul 2013 to Present Numerous projects involving site developments for both Data Centers and Alternate Power Production

(CHP, Biomass, Wind, and Solar) options. Provide insight into developing real estate potentials to larger markets. Contracted to get Data Center projects under budget, while increasing the efficiency (lower PUE) and increasing reliability. Providing educational (teaching) seminars to Investors, Engineer and Project Development teams to provide valuable insight into the technology/construction world.

• Merck Pharmaceutical Lab Research Project – Durham, NC – Project responsibilities included Commissioning Manager for Mechanical Infrastructure Support on DS4. This was a contract assignment ($135M project + fee

• China Mobile Data Center – San Jose, Ca – Uptime Certified Tier III 20-mW deployment in San Jose area, which includes eight 2.5-mW Pods, with a 60,000-square foot five (5) story office fit out. The estimated Project value is $400M project + fee.

• Microsoft BN Site – Quality Control & Infrastructure Specialist for the 5-9 Renovations Project in Boynton, VA -

• Microsoft CYS04 – 5-9 Renovation Expansion Project Manager – PlanNet – Microsoft RNG Project, critical re-fresh for the CNR Infrastructure for the next technology upgrade. Cheyenne, WY - $27M upgrade + fee

• Microsoft CYSO4 Commissioning Manager – PlanNet – Microsoft CYS05 Project, new 32-mW Data Center Project, with 100-MW Utility Substation 115-kV to 26-kV for 2N deployment for the next three projects “CYS-05, 06, & 07. Also, Natural Gas Generators for stand-by and peak shaving for critical loading. Cheyenne, WY - $423M Project + fee

• Construction Manager & Quality Control – Planet – Microsoft CYS04 5-9’s Project, 10- MW Deployment of new engineered reserve line-up, renovation in live critical environment. Cheyenne, WY - $125M

• Commissioning Manager – Primary Integration – Microsoft CYS04 Project, 32-MW Data Center Project, Cheyenne, WY - $425.0 Million

• Owner’s Representative – TLM Group – Morgan Stanley Project - $ 26 Million

Blackrock Data Center - $36M

RBC Data Center – GCC Legacy Upgrade - $ 17M

• Pre-Construction & Project Management & Cost Estimating- ICS-Net, Inc. – Saudi Project -$40M

• Site Developments Projects:

o Southeast Asia – Wind Farm – 500-mW Opportunity - $2.25B (2016) o Southeast Asia – Solar Petrochemical Process Opportunity - $450 M o Pacific Islands – Complete Multi-Island Bio-Mass Power Plant & new CHP Airport Cooling System design - $450M

• Other Opportunities

o Data Center Site Developments 100-mW & 150-mW - $800M to $1.5B o RED Bird Park Development – Dallas, TX – CHP On-Site Power Generation for Multi-use 55-acrea site development which includes Health Care, Senior Living, and Medical Office Centers, and re-feeding the existing Airport Facility with clean green energy $350-750M o New England (Mass-Ct-NH Area) – CHP Combined with Bio-Mass Research Facility, Data Center’s & Harbor Marina/Hotel Complex for the development of 650-Acres of Property. ($1.5-2.5B)

ConceptCSI

Director of Design& Construction Nov 2011 to Jul 2013 On-site coordinator for the company’s various projects with both CyrusOne & Digital Reality Trust Company “Co- Location Data Center” Fit-outs (1.0-2.5mW Fit-out in Live Data Center Environments); Wallingford, MA, and Dallas/Houston, TX Locations

• CyrusOne 2.0-Mw Deployments in Lewisville, Tx Facility

• Up Garde of the existing Utility Service @ Lewisville, TX Facility “MV Upgrade Project”

• CyrusOne Pod Fit out @ Houston, TX facility.

• Digital Reality Trust Infrastructure Project in MA Skanska USA Building

Director of Operations, Mission Critical COE/MEP May 2005 to Nov 2011 On-Site Senior MEP Project Manager & MEP Superintendent, expertise and in-dept understanding of how highly sophisticated MEP infrastructures should be planned, designed and executed to ensure that the operational objectives of systems are achieved or exceeded. Track record illustrates consistent high levels of success, in part, due to in- depth knowledge of electrical and mechanical equipment and systems operations/maintenance- plus excellent relationships with major vendors and specialty contracting companies. These relationships are leveraged to benefit client requirements for fast-track procurement/fabrication/delivery schedules.

• Verizon Data Center Project – Manhattan, NY

• Goldman Sachs – NJ

• IBM Data Center’s – NJ, NY, CT Locations

• eBay – Salt Lake City, UT

• KPMG – NJ (Combined Heat-Power Data Center “One of Seventeen CHP Powered Data Centers”)

• Royal Bank of Canada – Canada (Two Sites) Guelph & Stratford Facilities Five Star Electric Company

Senior Project Manager/Assistant Superintendent: Feb 2002 to May 2005 Responsibilities included Project Estimating, Equipment Ordering, Manpower, Complete MEP Coordination, Marketing, Managing all Construction Issues, Engineering Design Issues and Field Supervision for the following projects:

• Rector Street 1 & 9 Subway Re-build Project $45M

• Penn Station Subway Station $55M

• PS 254 $12M

• PS 268 $12M

• Pro Foods/ BJ’s Retail Food Stores $8M

• Home Depot, Multiple Sites NYC

• Queens Center Mall: Queens, NY $37.5M

• 121-Retain Tenant Projects

• Newtown Creek Wastewater Treatment Facility $85M F.W. Sims Mechanical Contractors

Superintendent and Project Manager: Jan 1998 to Feb 2002 Senior Project Manager and Assistant Mechanical Superintendent – Responsibilities included Contract Negotiations, Equipment Purchasing, Estimating, Pipe-fabrication Shop production, Engineering, Fabrication drawings, Coordination (MEP Trades) and Project Manager for the following projects:

• Interfaith Medical Center $25M

• Montefiore Children's Hospital $35M

• Menorah Nursing Home $14M

• JFK Airport $75-150M

• Public School Projects, Mechanical Scope $4-6M

• Central Plant Design-Build Projects $2-7M

Jones/GMO Construction

Senior MEP Project Manager/Superintendent 1994 to Jan 1998 Specifically tasked with Project Management & MEP Superintendent, assist with Engineering Design, Coordination and Estimating for the following projects:

• Westbury Hotel Project $135M

• 685 Third Avenue Central Plant & Electrical Upgrade $45M

• Manhattan Psychiatric Facility, Wards Island $430M

• Various Tenant Fit-out projects $3-5M

Huntington Power/Network HPE

Director of Engineering and Construction Projects 1990-1994 Supervised the engineering design and construction of various prime and emergency power installations in NY, NJ, PA and CT. Included engineering and design of batter & rotary UPS Systems and all mechanical support. Responsible for managing the company's largest projects and developing engineering courses for Generator and Mechanical systems installation.

• Brooklyn Metro-Tech Data Center: Brooklyn, NY $0.9M

• Konica Business Systems: South Windsor, Ct. $1.5M

• IBM Business Center: NY & CT Facilities $2.5M

• CIBA-GIEGY Laboratories & Data Centers $35M

• Bell Labs, Murray Hill NJ Facility

• Downstate Medical Facilities

• Homeless Shelter, Milford, CT $5M

• St. Michael’s Medical Center, NJ

• St. Francis Hospital, Beacon, NY 1.5 million & Electrical Design for Existing Conditiions

Flack + Kurtz Consulting Engineers / Edward A. Sears Consulting Engineers Consulting Engineer & Associate 1984-1990

Entry level Consulting Engineer at Flack & Kurtz and, through rapid advancement, achieved the position of engineer within two years. Left for a senior position at Edward A. Sears and returned to Flack & Kurtz as an Associate. Responsibilities included Engineering MEP Design and Construction Management of numerous projects at various locations in the world. EDUCATION:

Manhattan College School of Engineering 1980-1984

Bachelor of Engineering “Electrical Engineering (B.E.E.) with Minor in Mechanical Engineering and Structural Engineering New York University, School of Continuing Education 1987-1990 Instructor

Building MEP Design Courses, Data Center Design Courses, Electrical Engineering Courses Dale Carnegie 1985

Public Speaking Course, Graduated



Contact this candidate