CV-Nugroho- CE_PE_QC_SUPT_CM

*

Project Superintendent / Construction Manager

RESUME

NUGROHO DWI SULISTYO

Nick name: Nugro

Phone : +62-852-******** / +65 9376 4560

Email : adumt4@r.postjobfree.com

Address : Villa Hang Lekir, Batam Island, Indonesia Project/Field/Installation/Operation Engineer

Superintendent/Construction Manager-– Cum QC Structure AGE: 46 Years

SUMMARY OF EXPERIENCE:

Qualified Const. Engineer Superintendent / Construction Manager for Field Operation, Installation, and overall Operation Project Construction, with over 18 years of extensive experience in the field of Oil and Gas Industry. I have gained substantial professional experience of working with various high profile organizations. Possessing a good knowledge in Project Construction, Installation Progress, Quality Inspection, Productivity team-work, and Safety to reach Project Accomplishment.

Have understanding Oil and Gas Offshore Project Activity such as Jacket Installation, Piling for Jacket, Jacket Upending Installation, and Platform Installation. Load Out, weighing and ballast, Vessel and Barge transporting route, S-Line Offshore Pipeline Installation include spool and riser installation, Pre-commissioning and Commissioning as per international standards and as per Client

/ DNV& ABS requirements, Anchor Pattern and Anchor Handling Tug Operation, Vessel and Barge Inspection and preparation include crew consumable and Provision, Pre Post and Positioning Survey, ROV survey and ROV modified for installation, Concrete Mattress, Free Span Correction, and Shore Pipeline trenching with Jet-Sledge and Exca, Push and Pull pipeline from shore, Air dive and Saturation dive. Weather forecast analysis.

Oil and Gas Onshore Project Activity such as Offshore Service Facility, Jacket; Pile; Platform Fabrication, Assembly Fabrication, Refinery, Processing Plant, Pipe rack; Pipe Stanchion; Pipe Sleeper, Onshore Pipeline Installation, Infrastructure Building, HVAC, Infrastructure Facility, Permanent Camp, Industrial Workshop, Service Jetty, Bulk-Head, Wharf, Living Quarter, Batching Plant, Stone Crusher, Dredging, and other projects. Project engineering, bid evaluation, project planning and controls, and contracts administration. Setup &execute to develop value engineering to considering optimum cost impact. Develop optimum detail execution integrating related regulation, standards, and codes, construct- ability, operability, and maintainability. Develop the good safety attitude as the goal part of succeeding the progress. Engineering design & review details to increase the ease of construction / Installation and maintain drawing register controls for the project. Capable to identify, develop, implement & monitor improvement program & initiatives for the all activities in area of responsibility.

CV-Nugroho- CE_PE_QC_SUPT_CM

2

Project Superintendent / Construction Manager

PROFESSIONAL PROFILE:

Febuary 2017 – September 2022

SAIPEM ENI for British Petroleum Project.

Project : TANGGUH EXPANSION PROJECT Train-3, Loading Arm Jetty-2, PipeRack Gas Transfer Project Value: USD 1.7Bill

Designation:

Lead QC Marine Struc. / Project Coordinator

DUTIES AND RESPONSIBILITES:

- QCP (Quality Control Plan), ITP (Inspection Test Plan)

- Audit (CAR and Observation), KOM, PIM

- Project Quality Plan, TQ, IDS, TBE, QCR,

- Inspection, CR, IL, Calibration

- Technical Proposal, Project Spec and requirement, code and standard, PO, CR, IL,

- Vendor assessment. MAR, IRN, RFI, NOI, MIR, OSDR, RFQ, MRB, TOC, MOC, MSDS, WPS.

- To understand QC rules to be presenting to the Client.

- To support the Construction Progress related of QC Coord, Arch, Civil, Structure, HVAC.

- Precast Concrete Fabrication, Delivery, and Installation

- Manpower 300 person included Foreman and Supervisor and Expatriate. September 2012 – February 2017

SWIBER OFFSHORE CONSTRUCTION

Project : DAMAN Ph.1, DAMAN Ph.2, GG Project, Poleng Project, Mubadala Project. Transportation and Installation Jacket, Platform, Offshore Pipeline, Offshore Construction, Supporting Onshore Construction.

Designation:

SR FIELD ENGINEER-Offshore

PROJECT SUPERINTENDENT-Onshore

Cum – QC

DUTIES AND RESPONSIBILITES:

(July 2016-Jan-2017) ONGC-DAMAN PHASE 1 PROJECT (5 platforms and 5 jackets Fabrication) Project Value: USD 493Mill

1., PETRO VIETNAM TECHNICAL SERVICE COORP, Mechanical and Construction, PTSC Yard, Vung-tau, VIETNAM, Task :

- Construction Manager/ CSR Rep. (PTSC Yard, Vietnam)

- Lead Structure QC for Structure, Arch and HVAC and Dossier (PTSC Yard, Vietnam)

- Daily Progress monitoring and Coordination (PTSC Yard, Vietnam)

- Shiploosed, Site Material coordinator (PTSC Yard, Vietnam)

- Fabrication Material control (PTSC Yard, Vietnam)

- Weighing coordinator (PTSC Yard, Vietnam)

- Load Out, Ballast and Sailaway coordinator (PTSC Yard, Vietnam) CV-Nugroho- CE_PE_QC_SUPT_CM

3

Project Superintendent / Construction Manager

- Barge and Tug readiness liaise with MWS (PTSC Yard, Vietnam)

- Manpower 1200 person

2. (January 2016-June 2016) ONGC-DAMAN PHASE 1 PROJECT (3 platforms and 3 jackets Fabrication), Singapore, GUNANUSA PTG Yard Indonesia, Project Value: USD 275Mill

(September 2015 – December 2015) Mumbai High Sea, Task:

- Construction Manager / CSR (PTG Yard Indonesia)

- Lead Structure QC for Structure, Arch and HVAC and Dossier (PTG Yard Indonesia)

- Daily Progress monitoring and Coordination (PTG Yard Indonesia)

- Shiploosed, Site Material coordinator (PTG Yard Indonesia)

- Fabrication Material control (PTG Yard Indonesia)

- Weighing coordinator (PTG Yard Indonesia)

- Load Out, Ballast and Sailaway coordinator (PTG Yard Indonesia)

- Barge and Tug readiness liaise with MWS (PTG Yard Indonesia)

- Project Engineer / Senior Field Engineer (Mumbai Office, Phoenix Mall, India)

- Pipe QC (Jindal Prakash Factory, Kashmir Gujarat)

- Pipe Loading Master (ADANI PORT, Mundra, Gujarat)

- Barge and Tug readiness liaise with MWS (ADANI PORT, Mundra, Gujarat)

- Manpower 600 person

3. (November 2013-December 2014) PHE ONWJ PERTAMINA, BALONGAN REFINERY, GG Field Development Project, West Java, Indonesia. Install Jacket, Platform, and offshore pipeline Project Value: USD 223Mill, Task :

- Construction Manager (Onshore), (Project Coordinator-Offshore), Site Logistic Coord, Lead PTW applicator.

- Leading of Offshore Laid Pipe, 40km.

- Vessel, Tug, Barge readiness liaise with MWS

- Leading of installing Piling, Jacket, and Platform. (Balongan Offshore)

- Leading of Pre-Post Integrated Positioning Survey (Onshore / Offshore Balongan)

- Leading Hydrotest Pre-Commissioning activity (Balongan Offshore)

- Leading of Nearshore Push-Pull (Beach Pull), Dead Man Anchor application. (Balongan Offshore)

- Leading Nearshore Trench (Balongan Nearshore).

- Leading Concrete Mattress Installation (Balongan Offshore).

- Leading of Offshore Freespan Correction and SSIV installation (Balongan Offshore).

- Leading Riser and Spool installation (Balongan Offshore).

- Air Diving activity supervisor (Balongan Offshore).

- ROV (Remote Operated Vehicle) activity supervisor (Balongan Offshore).

- Manpower 350 person

4. (April 2013-October 2013) PHE ONWJ PERTAMINA, POLENG Project, West Madura Offshore Field,

(36” offshore pipe leaking project) Project Value: USD 21Mill (VO due to Pipe Leak), Task :

- Project Superintendent / Senior Field Engineer

- AWB Barge Rig Up Built and Modification for SAT Diver Equipments (Batam Yard). CV-Nugroho- CE_PE_QC_SUPT_CM

4

Project Superintendent / Construction Manager

- Barge Readiness Lead liaise with MWS, include the crews and provision (Batam Yard).

- Towing Supervisor and Engineer.

- Leading to find 24” Offshore Pipe Installed Leaking (West Madura Offshore).

- Leading Post Offshore Integrated Positioned Survey (West Madura Offshore).

- SAT Diver activity supervisor (West Madura Offshore).

- Air Diving activity supervisor (West Madura Offshore).

- ROV (Remote Operated Vehicle) activity supervisor (West Madura Offshore).

- Additional 2 SSIV Christmas Tree installation and the Platform to block the running Gas with re-Commissioning.

- Manpower 100 Person

5. (October 2012-March 2013) MUBADALA PETROLEUM, RUBY PEARL OIL, MAHAKAM 1 & 2 Development Project, Offshore Pipeline Balikpapan, Indonesia Project Value: USD 2.172B :

- Construction Engineer / Senior Field Engineer

- Leading Offshore Pipe laid 320km, 14”, Finished within 82Days with Conquest Barge

(Balikpapan offshore)

- Leading Pre-Post Offshore Integrated Positioning Survey (Balikpapan).

- Site Logistic Coordinator (Singapore).

- Leading Freespan correction Job

- Leading Hydrotest Pre-Commissioning activity.

- Leading SSIV Installation

- Leading Concrete Mattress Installation.

- Leading Riser and Spool installation.

- Pipes Carrier Vessel Management

- SAT Diver activity supervisor (Balikpapan Offshore).

- Air Diving activity supervisor (Balikpapan Offshore).

- ROV (Remote Operated Vehicle) activity supervisor (Balikpapan Offshore).

- Manpower 350 person

April 2015-August 2015

COOEC (China Oil Offshore Engineering Construction). Project: BD Field Madura Development.

Project Value: USD 407Mill

Transportation and Installation, 650T Platform, 950T Jacket, and 54 km 16” offshore pipeline to the shore.

Designation: Construction Installation / QC-Lead

DUTIES AND RESPONSIBILITES:

- Following, reviewing, and participate to make Transportation and Installation Document Engineering.

- Vessel plan readiness, Logistic Base readiness, load out preparation.

- Readiness Operation preparation.

- Performing Execution plan and Handover schedule include all dossier base on TOC.

- Subcontractor coordinator.

- Pipe Production QC lead, LQ Arch HVAC QC-Structure

- Manpower 200 craft + foreman

CV-Nugroho- CE_PE_QC_SUPT_CM

5

Project Superintendent / Construction Manager

February 2012–September 2012 (7 Months contract)

Nippon Steel Engineering Coorp Ltd.(NSEC)

Project : Ruby Pearl Oil 14km 14” Offshore Pipeline and South Mahakam Project 24” Offshore Pipeline for Total Indonesie.

Project Value: USD 387Mill

Offshore Pipeline to the Nearshore, Shore Trenching, Near Shore Push Pull pipeline, Concrete Matrass, Free-span correction, Pre-Commissioning, Positioning Survey, Air Diving, SAT Diving Designation: Construction Field Engineer

DUTIES AND RESPONSIBILITES:

- Supervise and review Subcontractor’s work offshore onboard to reach the progress, safety, and quality.

- Review Subcontractor’s engineering document and Report.

- Permit to Work and Marine Permit Coordinator.

- To attend a technical meeting and take attend various site inspections.

- Progress speed up and monitoring.

- To liaise with CPY/Subcontractor/CTR’s offshore team on technical issue.

- Ensure that safety standards are observed and guarantee the quality of the work

- Manpower 200 craft + foreman

November 2009–February 2012

SAIPEM ENI,

Project: Saipem KarimunYard (Fabrication Yard and Offshore Services) Project Value: USD 268Mill

Is the biggest Onshore and Offshore Services Maintenance and Fabrication yard in South Asia for Oil and Gas industrial.

Industrial Workshop, Piping Workshop, Painting workshop, Plat and Beam Workshop, Assembly yard, Housing, Apartment, Accommodation, Main Office, Sport center, Clinic, Training Center, Laboratory, Facility and Infrastructure.

Helipad, Power Station, Power Plant, Water Treatment Plant, Field for Bulk Head, Stone Crusher and Service Jetty, Dredging.

I have been joint since Zero till ready to production. Designation: SERVICE BUILDING SUPERINTENDENT

DUTIES AND RESPONSIBILITES:

- Carry out the work in the planned times & cost, manages the technical & administrative documentation

- Prepares & co-ordinates the detailed programs for the correct management of the works of one’s specific responsibility.

- Ensures the safety & quality standards are respected

- Ensures observance of the project specification

- Helps solving technical & management problems encountered in the area of responsibility CV-Nugroho- CE_PE_QC_SUPT_CM

6

Project Superintendent / Construction Manager

- In accordance with the established operating programmes, arranges for the correct and cost effective performance of construction works, coordinating & controlling the activities performed by the dependent teams and / subcontractors.

- Direct managing the subcontractors. Manages human & technical resources, indicating any need

& surplus in good time.

- To Perform and give inspection report to QC the Arch and HVAC

- Ensures that production quality and quantity standards are observed.

- Assist with the handover of completed works with Commissioning.

- Manpower inconcern = 12 Supervisor, 625 craft + foreman November 2007 – August 2009, Employee No. 4108D

J.R.MCDERMOTT, Batam Fabrication Yard

Offshore Service, Platform & Jacket Fabrication.

Project : North Belut Platform & Jacket Fabrication, Su Tu Vang Platform & Living Project Value: USD 450M (North Belut), USD 600M (Su Tu Vang), Quarter Fabrication, Platform Fabrication, Skid Way & Bulk Head, Arthit Designation: SUPERINTENDENT for Bulkhead, Quay Wall & Skidway Ramp. DUTIES AND RESPONSIBILITES:

- Part integrity fabrication before Fit up stacking up and Assemble, performing, supervision, progress and problem. (Work Pack application)

- Customer satisfaction to their target project productivity

- Small unit fabrication module fabrication lead

- Prepare the skid for Module moving out.

- Preparing foundation / Skid for Jacket & Deck Building

- Preparing Lifting up, jacking up & Load up for Jacket & Platform.

- Lead Bulkhead and Quay wall construction, concrete structure with bore pile and dead man anchor for tensioning.

- Manpower 100 craft + foreman

September 2006–October 2007

PT.BADAK LNG, Rekayasa Engineering – Onshore Refinery Project Project : Construction EngineeringTask Force in PT.BadakLNG, Bontang, East Kalimantan Project Value: USD 42Mill

Engineering Section in Project Department.

Designation: Lead Project Engineering & Construction DUTIES AND RESPONSIBILITES:

- Review design calculation for Buildings, ME and HVAC, Pipe Rack, Pipe Stanchion, Pipe sleeper, Miscellaneous Equipment foundations, Jetty, Retaining wall, Slope stability, Concrete structure reservoir, Erosion control, Roads, Drainage and Infrastructure and all refinery facility.

- Review engineering package for bid process, Field Engineering Design, Front End Engineering Design for Construction.

CV-Nugroho- CE_PE_QC_SUPT_CM

7

Project Superintendent / Construction Manager

- Engineering design & review details to increase the ease of construction / installation and maintain drawing register controls for the project.

- Prepare technical documentation for tender process and assist the procurement department in the technical evaluations. Set and control bill of quantities and cost estimate (including supplies and construction execution plan / installation method).

- Subcontractor progress review and check.

- Manpower 200 craft + 8 foreman

March 2005 –August 2006

RADIANT HYPAR ENGINEERING, Bontang Site, Indonesia – Onshore Refinery Project Project : Security Master Plant, PT. Badak LNG, Bontang, East Kalimantan Project Value: USD 22Mill

An EPCI project to secure the refinery from all kind of human intrusion and sabotage disturb for all activities of LPG & LNG processes in Zone 1 (Critical & Restricted area). All protected infrastructure and facility, mechanical, instrument & electronic equipment also add in this project, costly almost 127 Billion IDR.

Designation: SITE MANAGER

DUTIES AND RESPONSIBILITES:

- Technical and commercial proposal management supervision

- Construction management and supervision, Preparing project execution plan

- Check list Drawing Planning Construction in field

- Evaluating and expediting subcontractor’s proposal

- Arranging material and finish good stability parameter and schedule

- Check review technical specification submitted by owner

- Check and review design to site execution job

- Architectural & HVAC Installation

- Value engineering prior to budget and cost efficiency supervision

- Promotes safety awareness and environmental consciousness and complies with all applicable safety and environmental procedures and regulations, etc.

- Manpower inconcern = 8 Supervisor, 400 craft + foreman March 2003 – February 2005

RADIANT HYPAR ENGINEERING, Pertamina Cilacap Refinery Site, Indonesia Project : LPG & Sulphur Recovery Plant – Onshore Refinery Project Project Value: USD 22Mill

An EPC Contractor project for refinery. Is the project where the crude oil will be processed within the existing plant then transferred to this new project, and separate the LPG and the sulphur trough an equipment (Merox=Mercaptans Oxidations).

This project was US$ 22 Million and joint operation with Siemen Engineering Coorp. Designation: Project Engineering

DUTIES AND RESPONSIBILITES:

CV-Nugroho- CE_PE_QC_SUPT_CM

8

Project Superintendent / Construction Manager

- Civil Field Engineering Design when field design change to considering optimum inter-discipline impact interface. Coordination with related other discipline (Piping, Mechanical, Electrical, Instrument,Static, etc.)

- Review, Leading and Design calculation for Pipe Rack, Pipe stanchion and Pipe Sleeper, Retaining wall, slope stability and erosion control. Buildings and shelter, infrastructure, Refinery facility

- Supervising execute & Supporting Construction as follow as design

- Compiling Data, Reporting & Coordination with Engineering team project to make decision / justification to solve engineering problem at site

- Review (review, clarification / witness, approval) Material (submitted by Sub Contractor)

- Technical clarification with Client, Vendor / Sub Contractor, Monitoring MDR status. May 2002 – February 2003

PT.BANGUN CIPTA CONST.

Project : Jetty 16000 DWT for Cement Bossowa Maros – Offshore Industrial Project Project Value: USD 9Mill

Precast and Cast is place concrete, Steel pipe pile foundation with hydro drill barge method & bulking instrument with pipe stanchion line from Portland milling Designation: Construction Engineer / Site Engineer DUTIES AND RESPONSIBILITES:

- Piling Work onshore and Offshore Installation progress.

- Moving, transportation and installation of precast review and monitoring.

- Cast in Situ concreting application execution and monitoring.

- Preparing project execution plan considering with marine construction & weather condition

- Develop and improvement the planning, scheduling & estimating of the site execution, preparing planning of manpower, equipment, & efficiency work method

- Identify, develop, implement & monitor improvement program & initiatives for the all activities in area of responsibility

VARIUOS EXPERIENCED :

- February 2001 – April 2002, Site Manager, Building Construction – Onshore Commercial Project.

- February 2000 – January 2001, Site Engineer, Industrial Workshop. – Onshore Commercial Project.

- February 1999 – January 2000, Site Engineer, Airport Run Way Construction.

- September 1997 – January 1999, Site Manager, Ground Reservoir and 20”, Onshore pipeline for Potable water.

- December 1996 – August 1997, Structure Supervisor, Building Construction – Onshore Commercial Project.

CV-Nugroho- CE_PE_QC_SUPT_CM

9

Project Superintendent / Construction Manager

PROFESSIONAL QUALIFICATION:

- Diploma in Civil Construction Graduated, Diponegoro Polytechnic, 1996

- Bachelor Civil/Structural Engineering Graduated, Diponegoro University 2001 Certificate :

- Military Basic Course.

- Computer Course English Course.

- Civil Technic Basic Course.

- Plumbing System Design Course.

- Water & Environmental.

- Waste Water Treatment Plant Design.

- K3LL Safety Course for Liquefaction (PT.Badak LNG Refinery).

- Fog Evacuation Safety in Confine Space (PT.Badak LNG Refinery).

- Heavy Equipment Driving License.

- Diver with PADI Diver certificated.

- Scaffold Competent.

- PERMIT TO WORK (more than 12 years).

- First Aid Level 2.

- Hearing & Respiration Protection.

- Management Conflict.

- BOSIET (Basic Offshore Safety Induction & Emergency Training and Travel Safety by Boat

(57067))

- Sea Survival.

- Pipeline Inspector certified.

- Inspection Certified NDT Level-2, MT/PT, RI, UT (ASNT Level-2)

- HLO (Helicopter Landing Officer).

Reference Info :

1. Sujudran Balachandran (Swiber Director).

Phone : +52-938-***-****

2. Michael Maxwell (Swiber Trench and Cable Lay Manager) Phone : +60-13-844-****