Waleed Basha MSc
PETROLEUM ENGINEER
- C O N T A C T -
- P R O F E S S I O N A L E X P E R I E N C E -
CONSULTANT
Clint Consulting
CROATIA // JANUARY 2020– PRESENT
Monitoring and analyzing well production data to optimize production, achieve production targets and improve reservoir recovery.
Planning workovers; designed and selected well completions for onshore projects.
Identifying opportunities for production increase to support field development and increase company’s reserves.
Increasing the operating life of down-hole equipment in troublesome wells by analyzing failures and optimizing completion.
Supporting EOR Project implementation (injection wells relining, production wells anti- corrosive re-completion).
Chief Executive Officer
Quick Insurance Brokers Dubai – 2016-2019
RESEVOIR ENGINEER–Internship–
NIS GAZPROM - NEFT // SERBIA // 2015 - 2016
Analyzing production and injection performance of various wells and recommended remedial actions.
Elaborating water-coning problems of various wells and recommended solutions.
Estimating field reserves and ultimate recoveries using different methods (volumetric, material balance, decline analysis).
Optimizing well and field surveillance processes using nodal analysis and history matching methods.
Supervising contractor work and completion activities on injection wells.
Providing engineering support for completion of wells for C02 and water injection.
Coordinating operations.
Provide reservoir engineering evaluation to support well development and work over programs.
Material balance simulation to evaluate reservoir properties: OOIP, forecast reservoir pressure and estimate reservoir drive.
Perform well test transient analysis as required to evaluate reservoir pressure, skin and permeability.
Petrel reservoir simulation to predict production performance of new proposes well.
Decision analysis and economic evaluation to assess the available alternatives.
Reservoir management: Develop Asset Depletion Plan, Reserve Audit and Production Forecast for Business Plan.
Supporting EOR Project implementation (injection wells relining, production wells anti- corrosive re-completion).
DOB: 27th May 1979
DOB: 27th May 1979
DOB: 27th May 1979
************@*****.***
Residence: Zagreb, CROATIA
Nationality: Croatian
- P E R S O N A L S U M M A R Y -
A competent and qualified Petroleum Engineer with experience working in primary recovery and EOR development of both onshore and offshore projects. Qualified with a Master of Science Degree in Petroleum Engineering and skilled in Reservoir Engineering, Well Optimization, and Production Operations enhancing key project objectives to the highest international standards for quality, health, safety, security and the environment. Familiar with drilling techniques and well completions, having gained hands-on experience as a Petroleum Engineer. Is currently seeking a challenging new position with a reputable Oil and Gas Company and is available for immediate start to work on international rotation either on or offshore.
- C O M P E T E N C I E S -
Production & Injection Performance
Estimating Field Reserves
Pressure Transient Analysis
Material Balance Evaluation
Well Optimization
Nodal Analysis For Artificial Lift
Decision Analysis for Economic Evaluation
CO2 and Water Injection Systems
Drilling & Completions
Measurement While Drilling
Logging While Drilling
Completing Daily Drilling Reports
Down-Hole Equipment
End Of Well Reports
Production Operations
Anti-Corrosive Re-Completions
Drilling Technology
High Level Of HSE Awareness
Slick Line
Coiled Tubing Operations
Nitrogen Injection
- E D U C A T I O N -
UNIVERSITY OF BELGRADE - SERBIA
Faculty of Mining & Geology
MSc Petroleum Engineering
BSc Petroleum Engineering
ST. MARY CATHOLIC HIGH SCHOOL -
DUBAI, UAE
A Levels Physics & Math’s
O Levels
- P R O F E S S I O N A L E X P E R I E N C E -
PRODUCTION TECHNOLOGIST–Summer Internship–
INA // CROATIA // 2011 – 2011
Monitor and manage field production performance, generate appropriate programs to maximize wells production.
Artificial lift monitoring and optimization.
Develop well workover and stimulation program.
Injection well performance evaluation and optimization.
Acid stimulation lean sigma, Field test analysis of tubing pressure drop for two-phase steam injection.
Drilling & Well Completion–Summer Internship–
CROSCO, INTEGRATED DRILLING & WELL SERVICES // EU// 2008 – 2008
.
FIELD ENGINEER -Summer Internship–
CROSCO, INTEGRATED DRILLING & WELL SERVICES // EU// 2007 – 2007
.
Drilling And Well Completion
- M E M B E R S H I P S -
Society Of Petroleum Engineers
- S O F T S K I L L S -
Presentations
Client Needs Assessment
Coaching & Mentoring Junior Personnel
Determined Attitude
Problem Solving
Communicate At All Levels
Team Player
Excellent Written Reporting
Initiative To Act To Avoid Problems
Organizing & Planning
Meeting Targets & Deadlines
Supervisory &Leadership Abilities
Strong Work Ethic
Performance Under Pressure
Relationship Building
Time Management
Effective Listener
Managing Complex Work Scopes
- L A N G U A G E S -
English – Fluent
Arabic – Fluent
Croatian – Native Speaker
- I T S K I L L S -
Microsoft Office Applications
Petrel Reservoir Software
Eclipse Simulation
Matlab
ArcGIS
IBM SPSS
AutoCAD
Corel Draw
- P U B L I C A T I O N S -
Thermal Methods In EOR Efficiency Of Oil
Deposits By Using Solar Energy
Preparation & Processing Of Data For The
Realization Of Projects On Oil Deposit
Reservoir