Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Chicago, IL
Salary:
$120,000
Posted:
January 09, 2023

Contact this candidate

Resume:

DAVID LIU, Ph.D., P.E., S.E.

**** * ******* *****,**** 307, Chicago, IL 60656

Tel: 217-***-**** Email: adujwm@r.postjobfree.com

US Citizen

OBJECTIVE

Senior bridge engineer, project manager, or Structural department manager position

EDUCATION

Clarkson University, Potsdam, New York, Ph.D., Structural Engineering

South China University of Technology, Guangzhou, China, M.S. and B.S., Structural Engineering

PROFESSIONAL REGISTRATION

S.E. registered in IL. P.E. registered in IL, Mo, Kansa, MI, WI, PA, Conn, VA, MD, DC and FL. PE in NM, IA, GA, and Mn (expired)

COUNTRIES WORKED IN: USA, UAE, Canada, Indonesia, China

STATE PROJECTS WORKED ON:

Illinois, Iowa, Michigan, Wisconsin, Indiana, Missouri, Minnesota, Pennsylvania, Oregon, New Jersey, New Mexico, Idaho, Colorado, Tennessee, Arizona, Utah, West Virginia

PROFESSIONAL AFFILIATIONS

AREMA Committee 15

ASCE FELLOW

Co-leader for IL Tollway sub-committee for precast deck panels

EXPERIENCE

I have over 25 years of experience in structural design and analysis of steel I-girder, steel box girder, steel truss, prestressed concrete girder and post-tensioned bridges, retaining wall, noise wall, and railroad bridges. I was working on some well-known long span bridges, such as Lion’s gate bridge and Paseo bridge. I have written 300 technical papers published, presented accepted or to be submitted to ASCE Journals, ASCE periodicals, conferences, and seminars. I am a Program Manager and Team Leader for IDOT bridge inspections. I was a bridge department manager and PM for 7 years in the past.

Achievements:

ASCE fellow

EOR of Illinois’s first precast deck panel bridge with UHPC joints.

Designed Minnesota’s first haunched steel box girder bridge

Designed Oregon’s first Continuous Deck Bulb Tee Girder Bridge

Designed Iowa’s first stabbed H-pile foundation to support integral abutments

Structural lead for preliminary design of Illinois’s longest integral abutment bridge (550 ft, 30 degree skew)

IMEG Naperville, IL (04/2022-Present)

Senior Bridge Engineer

Prepare proposals for IL DOT, IL Tollway, MoDOT, WisDOT and Municipality.

Insurance review for Bridge Damage (Slabtown road over US 30 near Lima, OH), The Hartford Insurance

Performed review of bridge inspection report, bridge repair plans and bid item prices.

Bridge Inspection for Bridge Damage (Pedestrian bridge between the library and student center), Rock Valley College,

Rockford, IL

Performed review of bridge inspection report, bridge repair plans and bid item prices.

Freelance Senior Bridge Engineer Chicago, IL (01/2017-Present)

Senior Bridge Engineer

K-Interchange STRU E Ramp Bridges, Oklahoma DOT

Performed final design of 1-span (79’, Radius 813’) and 3-span (158’-128’-109’, Radius 813’) curved steel plate girder bridges for STRU E Lane “L” (K-Interchange).

RK-19 Queens Suspended Bridge and Viaduct Bridge Design Build RFP (WSP is client)

Reviewed the design of sidewalk, stringer, new floor beam, bracket, splice between existing floor beam and new floor beam for Queen viaduct and Queen suspended spans (sidewalk widening).

Reviewed truss gusset plate repair plans

St. Joseph Missouri Bridges (Huntoon Culvert and 6th Street Viaduct bridge), City of St. Jose, Buchanan County, Mo

Preparing final design of Huntoon culvert, 2-cell, RCB (CIP (cast-in-place), reinforced concrete box culvert.

Reviewed final design of 6th Street bridge rehabilitation.

Reviewed final design of McArthur bridge (redecking and bridge widening).

I-44 Design-Build Project Proposal, Mo

Prepared bridge type study for primary bridge K0008 (180 ft, single span steel plate girder), bridge Loo55 (90 ft Valmont

Tub Girder), secondary bridge R0136 and R0137 (150 ft, single span steel plate girder or single span precast prestressed

concrete girder NU 53)

Old Chain of Rocks Truss Bridge rehabilitation, IDOT

Preparing rehabilitation details for gusset plate and batten plate replacement, cost estimates of bridge repairs.

Old Chain of Rocks Truss Bridge rehabilitation, IDOT

Preparing rehabilitation details for gusset plate and batten plate replacement, cost estimates of bridge repairs.

Bridge Repair for 4 Bridges in Johnson County, IDOT

Performed QC for 4 bridges, 3-span, continuous steel rolled beam bridges. Converting stub abutments to integral abutments, using stage construction to maintain traffic.

Slab Bridge over Little Cache Creek, Samron Midwest Contracting, Inc.

Performed QC for slab bridge drawing and design calculations.

I-55 Bridge Repairs, McLean County, IDOT

Performed QC for final design plans for 8 bridges (I55 SB & NB over Turkey Creek,

Grassy Road over I-57, Williamson County, IDOT, District 9

Performed QC for final design plans for 2-span (122.75’-127.5’, skew 13 degree), steel plate girder bridge supported on integral abutments.

167th ST over Veterans Memorial Trail, FAU Route 291, Will County, IL

Reviewed CANDE input (software for culvert analysis and design software) for two arch culvert.

Sewer Rehabilitation Project, City of Emhurst, IL

Reviewed CANDE input (software for culvert analysis and design software) for 60-in diameter concrete pipe using 1.5-in Geospray liner for pipe repair.

Chicago Dwm Sewer Rehabilitation Project, Chicago Water Department

Reviewed CANDE input (software for culvert analysis and design software) for 10-ft diameter concrete pipe using 2-in Geospray liner for pipe repair.

Mickey McCormick - Terminal Pier

Performed Preliminary Design 45 Ft Long Pedestrian Bridge Using Double T Beam.

National Precast, Vancouver, WA

Design precast stairs using ACI and AASHTO.

Belgiumtown 22.5 Road OVER Little Cedar River And North N-3 Lane OVER Little River

Michigan DOT Menominee County Road Commission

Performed preliminary design of 57’ span 3-sided box culvert with a prestressed top slab.

Van Wyck Expressway Contract 2 Design Build projrct, NYSDOT (Sub to HDR)

Performed QC for walkway of two railroad bridges (signel track and double-track bridges).

Performed QC for definitive design of CIP cantilever retaining wall on spread footing and shear keys under seismic loading and non-seismic loading.

I-12 & I-12 College Flyover Ramp Design Build Projrct, LA DOT

Performed independent design review for two-span (183.5ft-183.5ft) steel plate girder bridge, three-span (54’-53’-54’) rolled beam bridge supported by multi-column pier and stub abutments.

WSDOT I-405 projrct

Desinged miles long noise wall with CIP noise wall on spread footing, precast noise wall on moment slab and precast noise wall on drilled shaft, CIP noise wall on grade beam on retaining wall.

GADOT SR 400 Design-Build projrct Proposal

Desinged two, 2-span, steel plate girder bridges; one, 1-span steel plate girder bridge and one, 3-span, curved steel plate bridge with integral pier cap and straddle bent with post-tensioning .

IDOT I-74 Project

Provided disposition of IDOT comments on TSL of 4-span steel plate girder bridge.

Large Energy projrct

Reviewed an existing slab bridge.

Senior Bridge Engineer

Champaign project, Ramp E over I-57 and I-74, District 5, IDOT

. Reviewed final design of curved girder design (MDX) and pier design (RCPIER). Performed independent design check of cross frame forces.

Senior Civil Technical Manager

I-95/I-10 Operational Improvements Design-Build, FDOT District 2

Senior bridge engineer for this $117 million Design-Build project

Created the design calcs for pier 45 supporting two new beams and existing beams (bulb-tee beams)

Hammerhead with post tensioning, review post-tensioned cap design check with Adapt program.

Performed independent design check on two integral straddle bents with post-tensioning.

I-4 and Florida’s Turnpike Mainline Design-Build

Senior bridge engineer for this $85 million Design-Build project

Performed independent design check on three straddle bents with post-tensioning.

Chapel Road Bridge Rehabilitation Design-Build

Senior bridge engineer

Reviewed floor beam design, pedestrian fence design for this rigid frame bridge.

Senior Bridge Engineer

Tri-State, Preservation and Rehabilitation project, Mile post from 40.0 to 52.7, IL Tollway

Lead bridge engineer for this $25 million project

Created tech memo for bridge inspection including cost estimate. Working on prefinal plans for bridge repair.

Bridge Group Manager and Project manager

Elgin O’Hare Western Access tollway (IL 390) Roadway and bridge construction IL route 83 to York road milepost

25.9 to Milepost 27.0,, ISTHA (IL Tollway)

Lead bridge engineer for this $3.4 billion project

Reviewed E03 bridge final design and final bridge plans of Single span, 183 ft long steel plate bridge with skew of 42

degrees. Complex framing due to variable deck width.

TranSystems, Chicago, IL (07/12-12/16, reason for leaving is other opportunities)

Bridge Group Manager and Project manager

Circle Interchange Reconfiguration, Cook County, IDOT

Lead bridge engineer for this $600 million project (Joint venture with AECOM), performing coordination with

AECOM, geotechnical, hydraulic, ITS, roadway, electrical and architecture engineers.

Engineer of Record for Illinois’s first precast deck panel bridge with UHPC (Ultra-High

Performance Concrete) joints (Peoria Street bridge over I-290 and CTA), reviewed girder design and final bridge plans.

Reviewed preliminary design of SE Ramp bridge (8-span, curved steel plate girder with a radius of 210 ft).

Engineer of Record for Wall 40 that is 247-ft long, 25-ft tall MSE wall with moment slab at top. Aggregate Column Ground

Improvement and Lightweight Cellular Concrete Fill are used to reduce settlement.

Reviewed final design of Van Buren Street bridge (4-span, 75’-86’-171’-154’, steel plate girder)

Reviewed final design of Wall 39 (6 ft diameter, 22ft tall drilled shaft soldier pile wall)

Tri-State Tollway (I-294), Roadway Study, 95th Street to Cermak Road, ISTHA (IL Tollway) (Worked on proposal)

Lead bridge engineer for this $1.38 billion project (Joint venture with exp for Master Plan), performing coordination

with exp, geotechnical, hydraulic, roadway engineers.

Reviewed BCR (bridge condition report), WCR (wall condition report), load rating, LCCA and TSL for 12 mainline and

cross road bridges.

Reconstruction and Widening of I-90, ISTHA (IL Tollway)

As DCM (design corridor manager), responsible for reviewing BCR, preliminary, prefinal plans and PSE for 30 mainline

and cross road bridges.

Reviewed final design of 54” shallow depth ppc beams of 2-span (117’-143’) bridge (IL 72 over I-90) with integral abutments with MSE wall wrap around. Due to curved alignment and 37 degree skew, framing is complex for straight concrete beams that are kinked at pier. Staged construction made the bridge design be even more challenged.

O’Hare Joint Use Rental Car and Parking facility and ATS Extension, Chicago Department of Aviation

Lead structural engineer for final design of ATS guideway bridge connecting Parking Lot E to Parking Lot F. 29-span, rolled beam/steel plate girder bridge.

Reviewed curved steel girder design for Coffey Rd over Manheim Rd Bridge (2-span, 167’-113’, radius is 700 ft).

M-231 over the Grand River, Grand Rapids, Michigan DOT

Review of final design of steel plate girder for South and North approach spans. Each approach bridge consists of 6-span (195’- 254’-193’, 190’-249’-190’), hybrid (50 and 70 ksi) steel plate girders.

County Line Road Bridge Replacement, McHenry County

PM for final design of 3-span, ppc deck beam bridge over Kishwaukee River. Reviewed deck beam, abutment and pier design and final bridge plans.

Rollins at IL 83, Lake County

Structural Review of final plans of Wisconsin Central RR over Rollins Road (thru plate girder RR bridge), Retaining walls: CIP wall on H-pile, CIP wall on spread footing, sheet pile wall with tied back system.

Busse Woods Bike and Pedestrian Bridge over IL Route 72, Elk Grove, IL

QAQC reviewer for final design of a pedestrian bridge for the Busse Woods Bikepath over IL Route 72 (Higgins Road).

The bridge will consist of three simple span prefabricated steel trusses on pile supported stub abutments with MSE walls,

and hammerhead concrete piers.

Ohio Street Bridge Replacement, Aurora, IL

Lead structural engineer for the reconstruction of the Ohio Street Bridge over Indian Creek and the BNSF Railroad in

Aurora. Ohio Street is a north-south major connector. Ohio Street Bridge crosses four tracks of the Burlington Northern

Railroad which accommodate freight and commuter trains. The bridge also crosses Indian Creek. Performed steel plate girder design (3-span, 82’-142’-117’, 30” deep web).

Gateway Design Build project in Detroit, Michigan

Addressed RFI for post-tensioned straddle bents

Gratiot over I-94 in Detroit, Michigan

Reviewed 2-D modeling of 2-span, ppc beam bridge with skew of 45 deg

I-96 at Cascade Road Bridge Replacement, Grand Rapids, Michigan

Reviewed final design of ppc beam, abut and median wall and plans. Providing Phase III support as PM. These dual

bridges are 2-span (98’-97’), 42” deep shallow ppc girders with integral abutments.

I-94 BL EB over I-69 bridge repair, Grand Rapids, Michigan

Reviewed temporary support design and abutment repair.

CN (Canadian National) Champaign Locomotive Platform project, Champaign, Illinois

EOR: direct fixation on slab on grade

Neches River Railroad Bridge, TxDOT

Reviewed 30% single track vertical lift bridge design plans (320 ft long truss, 132 ft normal lift)

Parsons, Chicago, IL (12/97-10/07-04/10, reason for leaving is other opportunities)

Principal Engineer

ACHE Road/Bridge Reconstruction and Rehabilitation Project, Indonesia

As a lead engineer to review 45m. 50m, 55m and 60m truss design and perform coordination during construction.

Al Safooh Transit System Design-Build Project, Dubai, UAE

Performed bridge type study (CIP PT Box Girder, Steel Truss, Tied Arch and External PT repair) for Marina bridge (3-span,

40m-126m-40m). Drafted concrete durability report for the project. Reviewed viaduct substructure design.

MO-Safe & Sound Bridge Improvement (800 bridges project), Missouri

As a team lead, responsible for project coordination, bridge study report, TS&L and pre-final plans of spread box girder

and voided slab bridges. Performed adjacent box beam study.

Rehabilitation of I-39 Bridges over Kishwaukee River, Winnebago County, Illinois

Performed transverse analysis of twin 5-span, post-tensioned segmental box girder bridges erected by balanced cantilever

method. Checked deviator design. Plan preparation for external PT retrofit.

Wakota River Bridges, Washington/Dakota County, Minnesota

Performed independent design review of substructure design including global substructure analysis. These twin bridges

are 5-span (Total length is 1889 ft and longest span length is 466 ft, post-tensioned continuous concrete segmental box girder

structures constructed by balanced cantilever method and founded on steel shell piles and post-tensioning spread footings.

Morgan Street Bridge Replacement, City of Rockford, Illinois

Performed TSL design of floor beam and PT deck (300’ steel tied arch bridge, laterally unbraced ribs, long. PT on deck)

Crosstown Project, Hennepin County, Minnesota

Performed independent pier design of 5-span, segmental box bridge.

US 20 Mississippi River Bridge, Dubuque County, Iowa

Performed final design of 4 steel plate girder bridges, including 645’ long haunched plate girder bridge.

Paseo Bridge over Missouri River, Missouri

Checked bridge rating analysis of US first self anchored suspension bridge.

I-40/Coors Interchange Reconstruction Design-Build Project, New Mexico

Designed integral pier cap for a 6-span, curved steel girder bridge. Checked pier design of a 9-span conc. bridge.

I-494 Design-Build Project, Minneapolis, Minnesota DOT

Performed preliminary and final design of 5 p/s concrete I-beam bridges using LRFD.

I-74 Bridges over Mississippi River at Bettendorf, Scott County, Iowa

Reviewed rehabilitation plans on this 3370’ long suspension bridge

Southeast Corridor Multi-Modal Project (T-REX), Denver, Colorado

Performed independent design on six concrete bridges and two steel bridges (highway and LRT bridges)

LRT over Lake St., and LRT over 28th St., Hiawatha Light Rail Transit, Minnesota DOT

Performed independent design on substructure of 2 post-tensioned concrete box girder LRT bridges.

9th St. over I-235, Polk County, Iowa

Proposed and designed Iowa’s first stabbed H-pile foundation to support integral abutments of 3-span steel plate girder

bridge.

I-74 over Rock River, Rock Island County, Illinois

Performed pier design of 7-span, steel plate girder bridge

University of Utah, 2002 Winter Olympic Games Project

Checked final design of cable-stayed pedestrian bridge.

S.H. 82, Snowmass Canyon, Colorado

Performed substructure design of two 6-span, cast-in-place, post-tensioned, 3-cell box girder bridges.

I-74, Peoria County, Illinois

Performed final design of two p.p.c. bulb T-beam, one p.p.c. I-beam and one steel wide flange beam bridges.

Lion’s Gate Bridge, Vancouver, British Columbia, Canada

Performed 3-D nonlinear analysis of 2778-ft long suspension bridge for both existing and proposed conditions.

Gannett Fleming, Inc., King of Prussia, PA (3/95-12/97, reason for leaving is wife got a new job in Chicago)

Senior Structural Engineer

U.S. 202 Improvement Project, Chester & Montgomery Counties, PA

As a lead engineer, responsible for structural design of two single-span horizontally curved steel plate girder bridges; one 480’ long steel truss railway bridge(Conrail/I-76); two 3-span steel plate girder bridges; three p/s concrete I-beam bridges(rehab).

US 202, Chesterbrook Interchange Improvements, Chester County, PA

Final design of a 2-span, continuous steel plate girder bridge, two culverts and one steel girder bridge rehab with heat

straightening repair.

PUBLICATIONS

1) “Redesign of Circle Interchange”, presented at 32nd Annual International Bridge Conference, Pittsburgh, June 2015.

2)“Illinois’s First Precast Deck Panel Bridge with UHPC Joint”, presented at 2014 National Accelerated Bridge Construction Conference, Miami, December 2014.

3)“A Review of ABC for Railroad Bridges”, Presented at 2013 PCI National Bridge Conference, Dallas, Texas, Sept. 2013.

4) “Oregon’s First Continuous Deck Bulb Tee Girder Bridge”, presented at 2012 PCI National Bridge Conference, Nashville, Tennessee, September 2012.

5) “Building Durable Concrete Structures in the Arabian Gulf”, presented at 3rd International fib Congress incorporating PCI Annual Convention & Bridge Conference, Washington, D.C., June 2010.

6) “End Forces on Cross frames in Horizontally Curved Steel I-Girder Bridges”, published in Practice Periodical on Structural Design and Construction, ASCE, February 2010.

7) “A Review of Shear Rating Procedures”, presented at 2008 PCI National Bridge Conference, Florida, October 2008.

8) “Deck Bulb Tee Girder bridges”, presented at 2007 PCI National Bridge Conference, Phoenix, Arizona, October 2007.

9)“Foundations for Integral Abutments”, Practice Periodical on Structural Design and Construction, ASCE, February 2007.

Software used: Larsa, MDX, Leap Bridge Steel, Leap Bridge Concrete, LPILE, SAP2000, GTSTRUDL, spcolumn, Winrecol, x-section.



Contact this candidate