Profile: Competent senior designer, can be a structural design checker or production designer.Having eight years experienced in AutoCAD, 5 years experienced in Smart sketch and Auto sketch, one year experienced in Micro station and Tekla Structures, five years experienced in Smart plant 3D (S3D) and two years experienced in Everything 3D

(E3D). With work experienced in Modular and Non Modular type of projects having over eight years experienced in Steel Detailing Structure and seven years experienced in Design/Checking of steel and concrete in Petro-Chemical Industries. Senior Designer MPG MSPO1 BLOCK2 Project

Fluor Daniel INC. Philippines SHELL Moerdijk Project 09/2021 to Present Shell Netherland Chemie / Netherland Shell Moerdijk intends to use 3D modelling to obtain as-is (as-built) geographical information on the location of all pressure equipment, piping and civil structures in the plant for optimizing extensive maintenance campaigns in the coming years the 3D models will be based on existing laser scans and FLOC data, captured by Fugro.

Responsible in providing (FEED, Aveva E3D) 3D model of main foundation and main steel. Senior Designer MPG Vopak TP3000 Project

Fluor Daniel INC. Philippines Vopak TP300 Project

07/2021 to 09/2021 Rotterdam / Netherland

Responsible in providing (Smart plant S3D) 3D model of Steel on Piperack North and South inside the tank pit area including miscellaneous support for piping and provide STP and DGN file as part of deliverables, provide 3d model of drip pans on swivel stations and at Piperack West. Senior Designer MPG FHR Long View Project

Fluor Daniel INC. Philippines FHR Phase 3 Project

05/2021 to 07/2021 Long View / Texas

Responsible in providing (FEED, Smart plant S3D) 3D model, Replacing EX-105 extruder with larger one EX-106 that requires expansion of 50-10 building on processing area, New foundations for compressor, filter and heat exchanger on synthesis area, New conveying lines from synthesis area down to the new silos in processing area that will go through Eastman property. Senior Designer MPG SHIN-ETSU PVC B.V. Project

Fluor Daniel INC. Philippines HTDC AND LINE 7 Project 01/2021 to 04/2021 Botlek, Rotterdam / Netherland

Provide Civil and Structural Data and Criteria for the HTDC-Line 7 project-HTDC part, Shin-Etsu PVC B.V. Rotterdam, The Netherlands.

Responsible in providing (FEED, Smart plant S3D) 3D model of Brownfield and Greenfield of steel and foundation. Provide FEED 2d auto cad drawings of concrete and steel. Senior Designer MPG MSPO1 and MLO1 Project

Fluor Daniel INC. Philippines SHELL Moerdijk Project 10/2020 to 12/2020 Shell Nederland Chemie / Netherland Shell Moerdijk intends to use 3D modelling to obtain as-is (as-built) geographical information on the location of all pressure equipment, piping and civil structures in the plant for optimizing extensive maintenance campaigns in the coming years the 3D models will be based on existing laser scans and FLOC data, captured by Fugro.

Responsible in providing (FEED, Aveva E3D) 3D model of main foundation and main steel. Senior Designer MPG MOED-1 Project

Fluor Daniel INC. Philippines SHELL Moerdijk Project 06/2020 to 07/2020 Shell Nederland Chemie / Nederland Shell Moerdijk intends to use 3D modelling to obtain as-is (as-built) geographical information on the location of all pressure equipment, piping and civil structures in the plant for optimizing extensive maintenance campaigns in the coming years the 3D models will be based on existing laser scans and FLOC data, captured by Fugro.

Responsible in providing (FEED, Aveva E3D) 3D model of main foundation and main steel. Senior Designer BAROSSA Project

Fluor Daniel INC. Philippines MODEC, Singapore

02/2020 to 03/2020 ConocoPhillips / Australia

The ConocoPhillips Australia Barossa Pty Ltd to supply a Floating production Storage and Offloading

(FPSO) vessel for Barossa field, offshore Australia, The Barossa FPSO is intended to produce gas and condensate from subsea wells and after treatment, supply feed gas to the Darwin LNG Plant via gas export pipeline.

Responsible in providing (FEED, Aveva E3D) 3D model of top side processing equipment and hull. Structural Designer / Checker LNGC Project

Fluor Daniel INC. Philippines LNG Canada Project (LNGC) 08/2019 to 02/2020 Kitimat, British Columbia / Canada The LNGC Project includes the design, construction and operation of a natural gas liquefaction plant, utilities, and storage facilities, including port construction with marine off- loading facilities and shipping capability. The LNGC plant will consist of two identical liquefaction trains with a capacity to produces 6.5 million tonnes per annum (mtpa) of LNG.

Responsible in providing 3D model and preparation of 2D drawing for both steel and concrete. As well as checking and preparing electronic file (neutral file/.stp, MTO, .jgp file) prior to construction issuance. Structural Designer / Checker AGPP NL Project

Fluor Daniel INC. Philippines Amursky Gas Processing Plant (AGPP) 02/2018 to 08/2019 Syobodnenskiy, Amur Region District/ Russia The project scope includes both facilities and services. The Amursky Gas Processing Plant Construction Project, will process up to 42 blnSm3/yr (7blnSm3/yr for each of the 6 tarins) of natural gas. Once operation It will be the largest such plant in Russia and one of the biggest in the world. Provide early detailed engineering model and drawings in E3D base on client specification and requirements. Responsible in creating model for the design, drafting, specifications and technical support for structural components of the project.

Designer / Checker GCGV Asset Holding,LLC

Fluor Daniel INC. Philippines Gulf Coast Growth Ventures (GCGV) 08/2017 to 12/2017 Gregory, Texas/ USA

FEED Package meeting Company’s technical and execution requirements and providing the technical basis for Contractor’s Engineering, Procurement and Construction (EPC) proposal. Verifying, developing s safety culture and program, modular execution strategy, selecting module yards, selecting critical equipment / material vendors and updating and optimizing the plant design for Contractors modularization approach.

Provide early detailed engineering model and drawings in S3D base on client specification and requirements.

Structural Designer / Checker Marathon Petroleum Corporation Fluor Daniel INC. Philippines Tier 3 Ultra Low Sulfur Gasoline (USLG) 07/2017 to 08/2017 Galveston, Texas/ USA

Following design approach outline the engineering design services, procurement service and engineering support services for construction by Fluor Structural Engineering Group for the Blanchard Refining Company LLC GBR/TRD Tier 3 USLG Project in Galveston Bay Refinery, Texas City, USA. Responsible in creating model for the design, drafting, specifications and technical support for structural components of the project. This includes pipe racks, equipment structures, equipment foundations

(include foundation for compressor, tanks, heat exchangers, pumps, vertical and horizontal vessels, furnaces etc.), retaining walls, underground sumps and miscellaneous concrete and steel supports. Structural Designer / Checker Ziegler

Fluor Daniel INC. Philippines Sasol Lake Charles Cracker Project 09/2016 to 07/2017 Lake Charles, Louisiana/ USA

Fluor, in a joint venture with Technip, is managing the provision of engineering, procurement and construction management for a 1500kTA ethane cracker and five derivatives units (LDPE, LLDPE, EO/MEG, Guerbert, Ziegler, ETO).

Responsible in checking concrete and steel detailed drawings together with model, assuring that we follow project specifications and standards.

Structural Designer / Checker Encana Corporation

Fluor Daniel INC. Philippines Cutback Ridge Program 10/2015 to 09/2016 Dawson Creek, British Columbia/ Canada Fluor Canada has been selected to provide EPCM engineering services for three gas compression and refrigeration projects in the Cutback Ridge area of northeast British Columbia. Responsible in providing 3D model and preparation of 2D drawing for both steel and concrete. As well as checking and preparing electronic file (neutral file/.stp, MTO, .jgp file) prior to construction issuance. Back-up Supervisor / Checker Dow Chemical Comapany Fluor Daniel INC. Philippines Ethylene Cracker (LHC-9) 04/2014 to 10/2015 Freeport, Texas/ USA

Fluor is performing EPC for new 1500kTA (2000kTA) light hydrocarbon ethylene cracker (LHC-9) production Facility using Technip-licensed technology to convert feedstocks into ethylene and propylene, C4 compounds, pyrolysis gasoline, fuel oil and off-gas stream. Responsible in providing 3D model and preparation of 2D drawing for both steel and concrete. As well as checking and preparing electronic file (neutral file/.stp, MTO, .jgp file) prior to construction issuance. Structural Designer Sadara Chemical Company

Fluor Daniel INC. Philippines Sadara (ICF/Waste Treatment) 01/2012 to 04/2014 Al Jubail, Saudi Arabia

Fluor, as a key EPCM contractor to Sadara, delivered the utilities and off sites facilities for the $20 Billion Grassroots Sadara petrochemical complex in Jubail, Saudi Arabia. Responsible in providing 3D model of interconnecting pipe racks and miscellaneous steel and checking of fabrication drawings.

(PEB) Pre-engineer Building Detailer / Checker Rigid Global Building NGdumlao Enterprises Various Buildings (Industrial, School, Church, Warehouse) 07/2003 to 12/2011 18933 Aldine Westfield Rd, Houston TX. USA NG Dumlao as the extension office of Rigid Global Building here in Philippines doing design, estimate detailing and providing drawing prior to fabrication and construction from Low complex to High complex type of buildings.

Responsible in producing drawings, as well as checking for fabrication and construction (shop details, erection drawings and bill of materials).

Projects Involved:

• FOX CONSULTING MANAGEMENT CONSTRUCTION-HOUSTON TEXAS

• WIER ENTERPRISES – HOUSTON TEEXAS

• FAIRCHILD INCORPORATED – ARIZONA

• HOMELAND BUILDINGS SYSTEMS, LTD. –TEXAS

• HAUSMANN CONSTRUCTION – ST. LINCOLN NEBRASKA

• CHARLES FINDLY METAL BUILDING SALES INC.- HARTWELL MAINA ROAD GEORGIA

• DAYSPRING RESOURCES – HOUSTON TEXAS

Education:

Bachelor Of Science in Civil Engineering, Technological Institute Of the Philippine, Quezon City, Philippines

TRAININGS AND SEMINARS:

Bridge Construction (TIP audio visual room September, 1998) Construction Management (TIP audio visual room February, 1999) Earthquake and Soil Engineering (TIP audio visual room March, 1999) Computer Application in Engineering (TIP audio visual room September, 1999) Tekla Structures (Vibrant Technology Solutions December 2009 ) SP3D Next Generation Platform Training (Fluor Daniel Philippines January 2012 ) Design Checkers Training (Fluor Daniel Philippines August 2012 ) Plant Design System Training (Fluor Daniel Philippines October 2012 ) Everything 3d (E3D) Training (Fluor Daniel Philippines January 2018 ) Everything 3d (E3D) Training Facilitator (Fluor Daniel Philippines July 2019 )