Post Job Free
Sign in

Construction Inspector Safety Manager

Location:
Hempstead, NY
Posted:
January 02, 2023

Contact this candidate

Resume:

Mohammad H. Rashid

** ********* ***., *********, ** 11550

Ph: 1-929-***-**** ***********@***.*** US citizen

EDUCATION : Bachelor of Science in Electrical Engineering, 1982

Khulna University of Engg. & Technology, Bangladesh

COMPUTER SKILLS : System :- WINDOWS XP/Windows 2008

Software:- MS Office, MS Excel

Licenses/Training : 1) OSHA –30hr 2) Construction Site Fire Safety Manager

3) NYC DOB 32hr Supported Scaffold Erector & Dismantler

4) NYC Site Safety Manager 5) NYCTA Rules & Regulations course

5) PATH track safety trainning 6) Asbestos Awareness course

8) NYS class ‘E’driving license. 9)Training on SiteManager(NYSDOT)

WORK EXPERIECE

TriState Planning Engg & Lan 6/27/2022 – 11/26/2022

1 N Wesley Ct., Huntington, NY 11743

Sr. Inspector

NYSDOT Bruckner Blvd. Hunts Pt. project: Sidewalk, ramp, steel faced concrete curb, sub-base course, traffic signal pole pit, road base, epoxy coated bar reinforcement, concrete barrier. Supervising sidewalk, driveway, curb & gutter replacement, excavation, milling, paving, pot hole repair, asphalt work in various location of Long Island, NY. Ensuring the work area safety and the worker and material safety.

S.A. Engineering LLC,(retained by Tunnel & Bridges Authority, MTA)

271 US Highway 1, Suite 200, Edison, NJ 08817

Project: QMC-2101 of NYCTA

Position: Resident Engineer/ CM Inspector 21 April, 21 – 3/11/2022

Responsible for Construction Administration & Inspection services for Commissioning new, Modification and testing of Exhaust Fan, Damper, Actuators, rotary limit switches, damper door operation at the Queens Ventilation Building (QVB) and Manhattan Ventilation Building (MVB) of NYCTA for Queens Midtown Tunnel, the most important tunnel connecting Manhattan and Queens and which is by the UN Head Office building. Lead abatement, painting, electrical wiring with sub DB box, conduits installation for lighting & actuator connection (as contract docs). Ensured LOTO operations performed properly. The work area safety & worker safety was ensured strictly, monitored ‘Tool Box’ mtg., job description mtg. Sent daily progress report to the PM.

Aerotek/Langan Co. retained by ConEd 8/15/2018 – 12/19/2020

Position: CI (Construction Inspector)

1) Green Infrastructure Geotechnical Project: 10/29/2020-12/19/2020

It was a project under DDC. Determined soil permeability rates & depths to ground water level and bed rock. Installation of catch basins to restore rain water, in Flashing, NYC area.

2) Installation of Sanitation Sewer & Storm Sewer Line, Catch Basins: (DDC Project): Replaced the old sanitation and storm sewer line with higher sized pipe. Had to ensure the safety of the gas and electrical main and service lines crossing or running through the trench or across, taking measurements to pay the contractor.

3) Arthur-Sheridan Enhancement Project [Project cost $97 M) (10/26/18 – 01/22/20)

(NYSDOT Project) Inspecting & ensuring the ConEd property Electric, Gas and Steam lines are safe during the excavation & reconstruction work (paving and cc) of Sheridan Expwy including installation of new catch basins and storm water discharging drain pipes, ped-crossing light, intelligent signaling. Replacement of Low tension 12” gas main by 16” pipes.

Supervised the paving and resurfacing of the local roads in Bronx by NYCDOT, ensuring that the utility manholes & gas pits are not damaged, took measurement for payments.

4) (08/15/2018 – 10/25/2018)

a) Outdoor lighting Upgrade at Bruckner Service Station:

Supervised the excavation of pole pit, shoring, digging of trench for conduits, erection of light posts, pulling of conductors through conduits

b) Van Nest Service Station: Replacement of Oil Filled XF by Dry one:

Supervised the removal of old Transformer and conduits and installation of new conduits and troughs, construction of new concrete base for XF & HT switchgear as per the approved drawings. The safety measures were taken with proper PPE for work area safety. Monitored the Tool Box mtg, job description mtg.

C&M Quality Consultants LLC, NY 3/16/2018 - 8/14/2018

Position: Quality Engineer/Staff

Contract # P-36445:- Sandy Recovery Project; Clark st. Tube Rehabilitation in the Boroughs of Manhattan & Bklyn

Supervised numbers of work groups work throughout the working area. Watched whether the installation & various tests were taken properly as per the approved drawings and contract doc., continuity test, insulation test of cables, cad welding, cable pull & installation of conduits & moguls, hat brackets & cleats, troughs, boxes & fittings; cable splicing/joints, fiber optic test, motor discharge & hydrostatic tests, waterproofing work. Some tests were performed at the presence of a MTA personnel.

Aerotek (retained by WSP, former PB for MTA) 10/20/2017 - 3/9/2018

Position: EIC Project: MTA Emergency Signal Power Upgrade Project (Phase-2)

Ensured the work quality to be as per desired standard of MTA, NYC. Work include Track ckts. testing (Ground test, inspect negative return, Ballast leakage test, Shunt sensitivity test/adjust. power supply voltage), signals, stop machines, relay, track switch machines testing. Replacement of pins, A & C bonds cables in NYCTA rail tracks. Proper PPE & safety ensured during the work

M. Bhuiyan Construction Co. Inc.,1149 E 34th St, Brooklyn, NY11210 6/5/’17–10/19/’17

Position: Construction Supervisor

Supervised the on going civil & related electrical work in different sites of the company in NYC

Hilt Construction, Inc. 120 Old Complan Rd, Hillsborough, NJ 08844

Project: YORK College & SCA Projects- PS61, 71, 45 10/15/2016 - 11/10/16;

Position: Site Supervisor, 12/26/2016 - 05/07/17

Scope: Waterproofing of the roof; Terracotta work, flood control wall, waterproofing & repair of outer & inner walls. Replacement of old electrical wiring, conduits, main & sub DB boxes.

Keeping update with the PO of the project. Timely arrange the required materials.

Intercontinental Construction Contracting Inc. 11/15/2016 – 12/23/2016

180 Lexington Ave., Passaic, NJ

Position: Site Safety Engineer/Officer, Project: US Military Academy, West Point, NY

1) Students Mess: electrical Sub Station with HT & LT protection and electrical distribution

work. Project cost $7 Million

2) Demolishing the concrete stairs & installation of steel stairs of Officers Qtr. to hospital

Project cost: $1.2 Million

.

AZH Construction & Consulting, NY 7/6/2015 – 10/12/2016

(A) MTA/NYCTA (Contractor: Shazi Construction), Position: Site Engineer

1) Replacement of Paint Spray Booth of MTA Bus Depot at Queens Village, NY.

2) Ensured the safety precaution taken for the lead abatement work of the paint spray booth, ensured that the worker wear safety dress, musk with HEPA filter during the demolition work

3) Removal & installation of electrical power supply (main & sub DB), sprinkler system and compressed air supply system & gas supply.

4) Replacement of the HVAC unit and related duct from the ceiling and roof top. Ensured house keeping, air pollution control, dust removal and the precaution for removal of old insulation.

(B) York College (Contractor: Hilt Construction, Inc) Position: Site Supervisor

Water proofing, stop leakage throughout the college building, Asbestos removal, ensuring the site safety and fire safety during the work.

Dhaka Power Distribution Co. Ltd., Bangladesh 2012 – 1/1/2015

Position: Superintending Engineer (Management Position), Opn. & Maint.

Supervised the work of executive engineers of DPDC wireless system maintenance and repair work & operation of SCADA system. Monitored load distribution of the metropolitan Dhaka City during the peak hours. Managed preparing and sending daily interruption reports to the higher authority of the ministry.

Monitored the 132kv line and sub-station operation, repair & maintenance work and 132kv & 33 kv underground cable laying & splicing, Auto Re-closer, Capacitor bank installatio. Ensured the DC supply system for the substation control panel. Executed monthly shift duty roster for Central Control Room for Officers, operators and technical staff. Lots of official inquiry was headed by me.

[Position: Assistant Engr. >> Executive Engineer (EIC/RE), 13 March, 1983 - 1996 Operation Div. - Development Division-1 Oct., 2005 - 2012

Communicate with the consultant about the project documents and drawings. Run the project as per the scheduled time frame. Supervised the construction of new 132kv, 33kv, 11kv, 0.4kv over head & underground electrical line, commissioning of 132/33/11kv oil filled XF & GIS sub-station, critical 5.2 miles long 132 kv U/G double ckt. Transmission line through densely populated metropolitan city. The projects were completed within the time schedule. Processing the contractors running bill as per the completed work.

New York State Department to Transportation, NY 6/24/2004-10/21/2005

Position: TCI-III, Region 11 (EIC – Eizak)

Inspected the Distance Massage Display Board maintenance work; cleaning the storm sewer lines, manholes and bridges; resurfacing, milling, paving highways (JFK Expy, Staten Island. Expy), pod holes repair, striping pavement with reflectorized thermoplastic, taking ‘core ‘ for test, preparing report with the detailed measurement, list of materials used and keeping record of work in the form of hard copy. Ensure the safety of the work site and the worker. Also ensured the work is done within the scheduled time frame.

Integrated Engineering, NJ 09/21/2001-12/10/2003

(retained by Persons Brinkerhof Farradyne for NYNJ)

Position: Field Inspector (electrical)

Project-1: Toll Plazas of New Jersey Turnpike & Garden State Parkway

Project-2 : Exit Plazas in Airport Parking Lots of Port Authority of NYNJ,

Performed field inspection of electrical & civil works related to the installation of EZ pass plus equipment, installation of Loop (control cable), conduit, Fiber Optic Control cable, LEC box as per the NEC code, adjustment, tuning & regression test programs of AVI antenna & VES camera, ensured that the work done accordance with the specs and approved drawings, based on good engineering practice, reliability, safety & approved codes & are strictly in accordance with the time-schedule, participated in Job progress meetings. Reported instantly when any emergency circumstances aroused. Reported daily IDR (inspectors Daily Progress Report) to supervisor through e-mail.

Affiliation: Life Fellow, Institutions of Engineers, Bangladesh

Member, AABEA (American Asso. of Bangladeshi Engrs. & Architects), Tri-State Chapter

Leadership:

ex Secretary General, Association of Engineers, Bangladesh

elected Vice President (President was the Principal), Central Students Union, Khulna University of Engg. & Technology, Bangladesh 1980

ex General Secretary, West End High School Alumni Association, Dhaka, Bangladessh

Joined the guerilla force during the freedom fight of Bangladesh in 1971

School Captain, West End High School, Azimpur, Dhaka. 1970



Contact this candidate