Post Job Free

Resume

Sign in

Crane Operator Heavy Equipment

Location:
Mabolo II, Cavite, 4102, Philippines
Posted:
February 09, 2023

Contact this candidate

Resume:

ENRICO NAVORA GREGORIO

Address: Vizcarra Compound Molino III, Bacoor Cavite

Contact No.: 099*-***-****

Email Address: adu8wd@r.postjobfree.com

Position Desired: Crane Operator

OBJECTIVES:

In a hardworking and experienced individual with 10 years’ experience on heavy lift industries like oil and gas project/mining, power plant project, port construction project bridge detour, enable me to perform jobs with high standard of safety with excellent skill on operating crawler crane and mobile crane, assembly and disassembly and have worked, in various countries Panama City Central America, and Zambia Africa, Republic of Iran and Philippines.

PERSONAL DATA:

Age : 43 yrs. Old

Date of Birth : September 04, 1979

Place of Birth : Capoocan, Leyte

Gender : Male

Height : 5’9

Weight : 160 lbs.

Civil Status : Single

Citizenship : Filipino

Religion : Catholic

Language : Tagalog and English

Father’s Name : Ignacio Gregorio Occupation : Heavy Equipment

Mother’s Name : Elsa Gregorio Occupation : House Wife

EDUCATIONAL BACKGROUND:

PRIMARY LEVEL : LIGAS ELEMENTARY SCHOOL

1988- 1993

SECONDARY LEVEL : BACOOR NATIONAL HIGH SCHOOL

1993-1997

TERTIARY : IETI Las Piñas

COURSE Local Area Networking (Under Grad)

EMPLOYMENT RECORD:

Company : Mayon Machinery Rentrade Inc.

Address : 3rd Floor P&J Building Lot 32 Block 69 M. Roxas St. Corner Bayani Road AFPPOVAI

Phase 4, Fort Bonifacio, Taguig City

Project : Rental

Position : Crane Operator

Date : September 11, 2017 to January 18, 2023

Job Description/ Duties and Responsibilities:

-Assign in heavy lifting operation of 25 TON KATO, 50 TON KATO, 70 TON KATO and 280 Sumutomo. 160 KATO TADANO MANTIS, 120 TADANO, 130 KOBELCO, 80 TON, 50,55

Company : IPM Construction & Devt. Corp.

Address : No. 10 Brixton St. Kapitolyo, Pasig City

Project : Project Jumbo

Position : Crane Operator

Date : Jan 6 2017 to Aug 8 2017

Job Description/ Duties and Responsibilities:

-Hauling

-Unloading & Loading Materials

-Erection of Pipe Spool’s and Structural Materials.

-Estimate load capacity and study rigging plan for safe operation.

-Assign in heavy lifting operation of 65 sumotom and 55 kobelco crawler.

Company : First Quantum Materials Ltd.

Address : Donoso Colon Panama City

Project : Minera Panama

Position : Crane Operator

Date : July 25, 2015 to February 25, 2016

Job Description/ Duties and Responsibilities:

-Hauling

-Unloading & Loading Materials

-Erection of Pipe Spool’s and Structural Materials.

-Estimate load capacity and study rigging plan for safe operation.

-Assign in heavy lifting operation of 300 tons Manitowoc and grove 130 tons

-Terrex 75 tons

Company : First Quantum Materials Ltd.

Address : Kansanshi (Zambia Africa)

Project : Smelter Mining

Position : Crane Operator

Date : January 26, 2014 to April 1, 2015

Job Description/ Duties and Responsibilities:

-Hauling

-Unloading & Loading Materials

-Erection of Pipe Spool’s and Structural Materials.

-Estimate load capacity and study rigging plan for safe operation.

-Assign in 120 manitowoc grove 75 ton and 55 ton

-

Company : AG & P and GLNG BECHTEL (Phil.)

Address : AG & P Batangas

Project : GLNG Plant Project Module Yard

Position : Crane Operator

Date : June 14, 2013 to January 20, 2014

Job Description/ Duties and Responsibilities:

-Assign in heavy lifting operation of Linkbelt RT, Terrx RT, and Grove RT.

-Estimate load capacity and study rigging plan for safe operation.

-Assist lifting activity such as erection of pipe spools.

-Assign in 75 ton terrex and grove 55 ton.

Company : DSCT DAELIM – SAZEH Construction Team

Address : Tombak Ghadim, Bushehr Province Iran

Project : South Pars Gas Development, Phase 12 on shore

Position : Rigger

Date : February 6, 2012 to May 4, 2013

Job Description/ Duties and Responsibilities:

-Assign in 50-ton crane Tadano

-Assist lifting activity such as erection of pipe spools structural materials, installation/ refinery machinery.

-Estimate load capacity and study rigging plan for safe operation.

Company : HUTAMA- RSEA J.O. Inc.

Address : C5 Junction East Service Rd. Taguig, Metro Manila

Project : Metro Manila Skyway Project

Position : Rigger

Date : April 26, 1997 to March 02, 1999

Job Description/ Duties and Responsibilities:

-Assigned in heavy lifting operation as rigger of Tadano 50-ton Grove 150 ton

-During that time I was responsible in the crane checking oil and water of the battery.

I hereby certify that the above information is true and correct to the best of my knowledge and ability. Hoping and praying that upon knowing my background, this can prove that I am capable on certain job that will give to me. Thank you and GOD BLESS.

ENRICO N. GREGORIO

Applicant



Contact this candidate