Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Doha, Qatar
Salary:
10000
Posted:
February 07, 2023

Contact this candidate

Resume:

NAVEED MEHMOOD

ELECTRICAL ENGINEER

CURRENT RESIDENCE:

DOHA QATAR

DRIVING LICENSE

VISA STATUS:

TRANSFERABLE/NOC

adu6ym@r.postjobfree.com

NAVEEDMEHMOOD921

@GMAIL.COM

PAKISTAN

+923*********

QATAR

+974********

WORK EXPERIENCE

AN ELECTRICAL ENGINEER WITH MORE THAN 10 YEARS OF

EXPERIENCE IN POWER GENERATION AND BUILDING

ELECTRICAL UTILITIES INSTALLATION. MAJOR PERSPECTIVE OF VFD’S, SOFT STARTER OF MOTORS AND PFI’S ETC. DETERMINED KNOWLEDGE OF ELECTRICAL AND SAFETY CODES NEC, IEEE BS AND NFPA 70 AND NFPA 72. COMMITED TO CARRY OUT UTMOST DUTIES ADEQUATELT.MEET CHALENGES IN ALL ASPECTS.

AL-SARF CONTRACTING COMPANY-QATAR

PROJECT ELECTRICAL ENGINEER

FEBRUARY 2022 TILL PRESENT

CLIENT: ARIANE – REAL ESTATE – QATAR

CONSULTANY: CONSEIL ENGINEERING CONSULTANT

PROJECT: YASMEEN CITY LUSAIL – QATAR

PROJECT WORTH: 242 MILLION QAR

PROJECT LOAD CAPACITY: 9.075MW

THE PROJECT IS LOCATED IN LUSAIL CONTAINING 121

NOS’ OF 2 FLOOR EACH LUXURY VILLAS’.

RESPONSIBILITIES

PROJECT SCOPE IS TO MEASURE ALL MEP WORK.

DUTIES TO PERFORM THE SHOP DRAWINGS FROM IFC

DESIGN DRAWINGS.

LOAD CALCULATION ACCORDING TO SITE

REQUIREMENTS.

LOAD DISTRIBUTION AMMENDMENTS FOLLOWED THE

CHANGE IN ELECTRICAL APPLIANCES

2

LINKEDIN.COM/IN/NAVEED-

MEHMOOD-1B495093

OBJECTIVE

To obtain high Quality of learning

skills. Eager to utilize my training

and skills, while making a significant

contribution to the success of the

Company.

SKILLS

Develop Electrical Schematic

Prepare Operational Plans

Communication Skills

Coordination

Numerical Skills

Teamwork and Collaboration

Professional and Strong Work

Ethic

Leadership.

WIRING FOR DUCT AND WALL SPLIT AIR CONDITION

SYSTEM.

ELECTRICAL INSTALLATION OF ALL BUILDING

ACCORDING TO KAHRAMA STANDARDS. WORK

INSTALLATION OF MAIN SUPPLY SYSTEM FROM

KAHRAMA CUT-OUT. CIRCUIT DISTRIBUTION THROUGH

OUT THE BUILDING FOLLOWED THE DESIGN.

PLUMBING WORKS: INSTALLATION SYSTEM GUIDANCE

OF PVC DRAINAGE AND PPR WATER SUPPLY SYSTEM.

DISTRIBUTION OF PPR WATER SUPPLY SYSTEM

THROUGH THE BUILDING

MATERIAL ARRANGMENT ACCORDING TO

SPECIFICATION OF PROJECT.

MATERIAL AND SITE INSPECTION REQUEST APPROVAL

FROM CONSULTANT.

LEAD THE TEAM OF 30+ ELECTRICAL STAFF AND SUB-

CONTRACTORS.

HANDLING MORE THAN TWO SITES AT SAME TIME.

B.K BUILDERS PVT. LIMITED COMPANY

PROJECT ELECTRICAL ENGINEER

February 2017 till 24 December 2021

Client: Federal Government Employees Housing Foundation (EHFPRO) Consultant: Engineering Associates (EA)

Project: Federal Government Employees Housing Foundation Islamabad Project Worth: 15 billion PKR

Project Load Capacity: 15.65MW

The Project located in G-13/A sector Islamabad. The project consists of total 8 no’s of Residential Buildings and one commercial Building, each Residential Building is of 14 storeys with three basements. RESPONSIBILITIES:

Electrical Project duties, Management/consisting design Monitoring drawings & review, Coordination prepare electrical of all shop drawings and supervised electrical work as per the approved construction design drawings and specifications.

Ø EARTHING SYSTEM

3

Installation and testing of Mesh Earthing System, including 70mm2 Bare copper Conductor, using mold for Cad-weld Joint copper connectivity, earthing pit with grounding 3-meter Rod filled with Bentonite (BS-EN-ISO-10769) low-resistive with all earthing accessories according to BS7430 standards

Ø CABLE TESTING

Perform Hi-Pot test for cable to check the stress of the cable. Ensure the no current and set to 1000V to check the open circuit and cable as to connect one end to the ground and other to the tester. According to IEC 60950 there is 2x (Operating voltage). Perform meager and continuity test. Measure the safety procedure while perform test. Ø LIGHTING AND POWER SYSTEM

Installation and testing of lighting fixtures and power system in the building, ensure the work are carried out according to the Contract specification, approved method statement and the shop drawings. Monitor the progress of work and follow up with safety department to ensure the works are carried out in safe practicing method.

Ø LOW VOLTAGE DISTRIBUTION SYSTEM

Installation Boards accessories drawing. will manufacturer’s be with in Perform accordance and according selective recommendations. testing phase to Busbars, with meagering of load MDB, specification, calculation, Breakers, SMDB, and continuity ATS specification approved PFI Panel and test. and other All drawings distribution and installation required design and Ø TRANSFORMER

Installation 630KVA Base Continuity before voltages. manufacturer-transformer. would energizing. Pad Followed of be and mounted supplied windings 8ft testing x 9ft Check Safety and transformer of and schematic 3-Transformers, 10-phase insulation inch-precautions, thick. line typically or resistance to drawing Provisions design line with NEC and rating standard of test for standards line the cable would 400KVA to electrical Concrete entries. ground made and and 4

Ø DIESEL GENERATOR

Installation with and manufacturer’s Electromechanical neutral and earthing. manual testing to interlock Manage of follow 300kva the the and and standard bypass cable 250kva entries. switch. installation Diesel Ensure Follow Generator procedure. the up body the set Ø FIRE DETECTION SYSTEM

Installation System like Sounder and NFPA Smoke in Strobe the Codes. Detector, and building. and Connections testing Alarm Heat Erecting of Detector, Bell. Addressable are FACP Follow made Multi Panel to the Fire BMS sensor, with approved Detection Control all Manual their shop system components and Call drawing Alarm etc. Point, Ø ACCESS CONTROL SYSTEM

Installation and testing of Mandatory Access control (MAS) system. Control system to be installed are room auto-door lock, exit push button and parking barrier security control system, an installation of entrance auto-sliding door using motion sensor,12-volt DC output power supply to DRI or SRI power IN terminal. installation and wiring are according to wiring detailed drawing and manufacturer manual. includes shop/to Testing the execute approved Ø schematic/of EXTRA cable CCTV Installation implementation. layout LOW continuity design System, before VOLTAGE and coordination and testing execution. IP Drawings all SYSTEM and related of according Electrical Data and tasks Manufacturer System. to are Low approved done Current Ensure according approval. drawings system, the to Monitoring and controlling multi-sub-contractors. Daily submission of work progress report. Technical and progress meeting with consultant and client involved in material submission and approval. Ø SAFETY

All appropriate safety personal protective equipment shall be worn by workmen such as Helmet, cover all clothing, safety shoes, goggles and gloves whenever required.

Only approved scaffoldings and safety belts can be used on high level works

Fire extinguisher shall be positioned in the event where energized cables are present on work places.

5

AL-BAWANI CONSTRUCTION COMPANY-KSA

PROJECT ELECTRCIAL ENGINEER

DECEMBER 2015 TILL JANUARY 2017

Client: Al-Riyadh Development Authority (ADA)

Consultant: Zuhair Fayyaz Group

Project: Justice Palace Project – Riyadh Museum

THE PROJECT CONSIST OF LANDSCAPING AREA ELECTRICAL INSTALLATIONS.

RESPONSIBLITIES

Ø DESIGN DRAWINGS

Responsible for the construction drawings review and make shop drawings. Design additional drawing and load panel schedule according to site requirements. Design and calculate the load, voltage drop and wire gauge, and prepare the additional drawings

Ø LIGHTING AND POWER SYSTEM

Installation of landscaping and Street lighting Poles system and controlled through photoelectrical cell and timer. A complete Panel design to manage the load of all lighting fixtures. All required devices installed inside control panel. MCCB for Main to control the short circuiting and RCCB to control the sudden earth fault, Magnetic Contactors for selection, Fuses are to safe the connections, Selector Switch are used to make it auto or manual control and timer are used to set the timer in the whole Control Panel.

Erection of covered area lighting and power system and landscaping area’s pole lights/street lights in the parking area. Prepare a foundation for pole and wiring distribution according to approved design drawings. Install outdoor GFCI socket outlet in specific areas.

Installation of façade lighting fixture on Riyadh Museum wall. These fixtures are RGB’S lights which was controlled by DMX through E-CUE software program. These fixtures are impro and linealuce lighting fixtures. Manage team to assist according to the Italy specialist engineer in order to proceed with the installation.

Ø DISTRIBUTION BOARD

6

Erection, distribution and testing of LV Complete distribution boards, Supply from already provisioned existing LV Main Switchgear room. Supply to be given to different zones with Automatic control lighting system through photocell, timer and contactor for landscaping area. Monitor the daily routine work and follow the safety precautions to fulfill the client and consultant requirements. Conduct meetings with consultant and client to maintain the stability of project work.

AL-BAWANI CONSTRUCTION COMPANY-KSA

PROJECT ELECTRCIAL ENGINEER

OCTOBER 2012 TILL DECEMBER 2015

Client: King Faisal Specialist Hospital and Research Centre Consultant: KFSH&RC

Project: Single Female Housing Complex-H (KFSH-H)

Project Worth: 90 Million SAR

The Project consist single tower consisting 10 floors with two basements. RESPONSIBILITIES

Ø ELECTRICAL MATERIALS

Manage and control electrical material responsibilities on site. Prepare material submittals for Low voltage switchgear, Transformers, earthing protection, power system, lighting system, FAS, IP telephone and data Access control system etc. Prepare material inspection Request (MIR) to the consultant for electrical utilities approval

Ø SHOP DRAWINGS

Ensure adequate monitoring prepare and review electrical design drawings and prepare shop drawings. Prepare short circuit and voltage drop calculation. Submission of drawings for approval.

Ø EARTHING SYSTEM

Installation of lightning and power earthing protection system, standard way steel earthing and power busbar earthing system installed. Earth pits installed separately for lightning and power system, followed the design 7

drawing where 3 meter of rod joint with 70mm2 bare copper conductor using cable lug. Followed the safety precautions and design layout. Ø TRANSFORMER

Installation of 630kva pad mounted dry type indoor transformer installed in specific electrical room, trenches are made for internal cabling from transformer room to LV switchgear room and followed. Ø MAIN DISTRIBUTION PANEL

Installation and testing of Low voltage switchgear with selective copper busbar and MCCB breakers. Cable glands are used for cables entries and used other accessories. Installation are followed according to the manufacturer manuals. Moreover, wall mounted DB’s are installed in electrical rooms as per design drawings.

Ø LV DISTRIBUTION UTILITIES

Installation tray, ladder of rack cable for tray, cable GI run Conduit, followed concealed in electrical pvc design conduit, drawing. trunking Ø LIGHTING AND POWER SYSTEM

Installation complete and power in utilities the and building, testing from approved taking of LV out lighting electrical the quantities fixture design and of drawing. lighting power fixtures system Ø ELV SYSTEM

Installation and testing of ELV system, IP based (WAN) telephone and Data system and IP based CCTV cameras inside and outside the building are installed. A DVR system is installed as per consultant/Client approvals. Testing and commissioning are performed by manufacturer’s team. Ø FAS SYSTEM

Installation System battery devices (Ionized are in backup. type)the connected and, building. manual 99 testing devices at call Installed this of point. Addressable connected system. Bell, FACP Heat sounder to Panel Fire detectors, the at etc. Detection single main smoke loop; corridor and detectors different Alarm with Ø ACCESS CONTROL SYSTEM

8

Installation and testing of Control system, where Card reader system at room auto-door lock and parking barrier security control system, an installation of entrance auto-sliding door using motion sensor, installation and wiring are according to manufacturer manual.

Responsible to deal with the sub-contractors to speed up the work progress. Conduct Progress meeting with consultant and client involved in site execution, material submission and approval. Testing and commissioning, project close out. As-built drawings, operations and maintenance manual and close out documents. A.Q BUILDERS PVT LIMITED COMPANY

JUNIOR ELECTRICAL ENGINEER

NOVEMBER 2011 TILL SEPTEMBER 2012

Client: Mardan Development Authority-MDA

Consultant: Mardan Development Authority-MDA

Project: Rescue 1122 Safety Building

The Project is located in Rustom Tehsil. The Project consist of three tier building.

RESPONSIBILITIES:

design project Coordinate drawings completion and with at site specified senior activities electrical time. in terms engineer to progress to follow and fulfill up with the Ø SHOP DRAWINGS

Responsible for the preparation of shop drawings with certified auto-cad operator in order to get consultant approval to proceed the electrical site activities. Ensure the drawings are properly amended according to proper design working manner.

Ø EARTHING SYSTEM

Follow up with the earthing drawings and materials to ensure that the site activity is according to proper earthing layout plan. Manage to install the earthing lightning and power system. The methodology is to use the 3- meter rod to re-bar with 50mm bare copper conductor in separately install earthing pits. As to follow approved design layout. 9

Ø LIGHTING AND POWER SYSTEM DISTRIBUTION

Installation exposed lighting the site activities. and GI conduit power of concealed system. in order pvc Follow to conduit, run the a safety required cable steps tray, cables in cable order and ladder to wires proceed and for Responsible Erection components zones. manual actions safety Ø codes. Installed call are FIRE of point. performed for are FACP ALARM components the to Perform be Installation Panel SYSTEM linked according cable with are with smoke of continuity 24-to Conventional main approved volt detectors, FACP battery test design using panel Fire heat backup. multimeter. Alarm in drawings detectors to different System. All and and the All Manage project close-all required out and as-testing built drawings and commissioning to hand-over documentations, the project. EDUCATION

DEGREE TITLE:

BACHELOR IN ELECTRICAL ENGINEERING

DURATION OF DEGREE:

NOVEMBER 2007 – OCTOBER 2011

INSTITUTE:

Hitec University Taxila Cantt-Pakistan

REGISTRATIONS:

Pakistan Engineering Council. PEC#33454

Saudi Engineering Council. SEC#110380

10

COVER LETTER

Respected Company

With Great Willingness, I am ready to serve for the Position of Project Electrical Engineer. I firmly believe that my education, skill set, intensive training and intensive experience make me suitable for my related field.

I am certified in Electrical Project Engineer and hold a degree in Electrical Engineer from Hitec University Taxila Cantt Pakistan. As an individual who is interested in continuous Professional development, I have dedicated more than 10 years of experience in Construction Companies with in the electrical platform. This has resulted in Professional Competency in all Operational and technical aspect of electrical system implementation.

Employed with Construction industry, as an electrical Improver/supervisor, I have demonstrated strong problem-solving skills and the ability to work in high-pressure and challenging working environments. My responsibilities varied through design amendments, site execution, installation and Supervision of testing and Commissioning of highly sophisticated electrical system. In addition, I was also relied upon to manage vendors.

Ensuring that all activities complied with quality standards and examining installation of numerous electrical equipment. I have been able to successfully identify engineered resolution to recurring electrical issues. Furthermore, I have gained an extensive exposure of leading team and training members such that their competencies are in line with the needs of the Organization. I have functional knowledge of all electrical legislation, code and standards of Practice and have gained expertise in use of industry specific tools and applications. I would welcome the opportunity to meet you and I am sure after appraisal of my resume you will see I am an individual with excellent potential in an organization. I look forward to hearing from you in due course. Sincerely, Naveed Mehmood

Electrical Engineer

Contact: +974********



Contact this candidate