Post Job Free

Resume

Sign in

Architectural Designer Coordinator Manager

Location:
La Trinidad, Benguet, Philippines
Salary:
4,000 Dollar per Month
Posted:
January 30, 2023

Contact this candidate

Resume:

CHRISTOPHER M. GONZALGO

Architect UAP

E-mail Address: adu0n5@r.postjobfree.com

Cellphone No: +63 – 907-***-****

OBJECTIVE: To join an established Organization requiring an experienced architect with significant profit orientation and a solid record of achievement in its operation.

SUMMARY OF QUALIFICATION: Accomplished architect with government, business and technical training. Well experienced in designing habitable spaces – ergonomics, and competent in drawing presentation. I acquired skills in project management and project improvement, which demonstrate success in planning, development and implementation using time management and budgetary limit. I had the ability to work independently or on a group team. I use computer extensively in areas of designing, drafting and planning and project management.

FREELANCE ARCHITECT Jan., 2021 to Present

No. 114 San Antonio

Agoo, La Union, Philippines

Architect of the following structure:

Two-Storey Residence, Bo. Pongpong, Sto. Tomas, La Union (April, 2022)

House Renovation, Binmeckeg, Pangasinan (Jan., 2021); Two-Storey Residence, Sto. Tomas, La Union (May, 2021); House Renovation (Amacan Architecture), Bo. Pongpong, La union (July, 2021); One-Storey Residence, Agoo, La union (Nov., 2021); Two-Unit Residence, Agoo, La union (Nov., 2021).

PROFESSIONAL – FIELD EXPERIENCE:

SITE ARCHITECT

Of Community Touch Christian Fellowship Church

And Parsonage June, 2020 to Jan., 2021

Agoo La Union

Duties & Responsibilities:

Arrange and review BOQ’s, specifications, construction drawings or tender documents for architectural, civil and structural, plumbing sanitary and electrical works received from main architect or designer. If found discrepancies therein, informed and write recommendation of solution referred to the architect or designer.

Conduct project site visit, ocular inspection to ensure the quality of workmanship and progress of activity.

Monitor the development of work based on computerized project management system.

Perform periodic information or report on the development of organization to the owner of the establishment.

Develop policies and procedures to improved worker’s efficiency and effectiveness.

SENIOR ARCHITECT (Retail Facilities Planner)

KARISMA Project Management Inc. Oct., 2018 to July 31, 2019

5th flr, 808 Building Meralco Ave.,

Cor. Gen. Lim St., Brgy. San Antonio

1600 Pasig City, Philippines

Tel No. +63-253******

Report to Arch. Martin S. Giordan (Package Manager, Main Terminal Building)

Duty Statement: Office Function

The project is New Manila International Airport (NMIA), located at Bulacan, Bulacan.

Coordination of detailed design that comply with the overall design intent and project budget.

Research and advisory on specific project detail.

Work with the PMC Team in fulfilling PMC architectural design review objectives.

Assist the Package Manager by preparing the documentation needed for the construction tender, including preparation of the technical specification and drawings.

Working closely with the QA department to ensure the technical specifications and documentation formats are aligned across the package.

Review and comment on progress report submitted by Design Consultant(s) and Design Review Consultant to the Package Manager.

Monitor progress and report on status and forecast target dates as agreed with the Package Manager.

ARCHITECT / TECHNICAL REVIEWER Sept., 2011 to Oct., 2016

OMD MSD, Ministry of Defense PO Box 58952, Riyadh 11515

Kingdom of Saudi Arabia

Tel No. (966) – 01 – 014976500 Ext. 513

Report to Arch’t. Nisar Dastgir (Head of Unit – Tech’l. Review)

Duty Statement: Office Function

•Ensure through action, either directly or indirectly, that a superior quality of technical expertise and knowledge of engineering practice shall be delivered, observed and maintained to its utmost excellence.

•Perform full technical review of Architectural design drawings, shop drawings, as-built drawings and materials submitted for approval by the contractor for a wide variety of construction projects at all stages of execution and hand-over.

•Express technical review comments in plain English in order for the contractor to follow and avoid repeated errors.

•Visit construction sites, material factories, showrooms and laboratories to ensure quality as per design norms as when required.

•Attend meetings with contractors, suppliers, Engineering Section designers and the management.

•Perform studies, analysis, and/or investigation as required to render determination, basis for design or general guidance to other discipline and/or Management.

•As a technical reviewer, we give full, consideration to constructability, operability, maintainability and economy.

•Perform other related duties such as full design, coordination with other discipline, hold meetings, etc., and other related duties assigned.

FREELANCE ARCHITECT Jan., 2010 to Sept., 2011

No. 035 Ofilada St., Consolacion,

Agoo, La Union, Philippines

Architect of the following structure:

Mini-Mart with Coffee Shop, Agoo, La Union (May, 2011), Two Storey Residence, Rosario, La Union (March, 2010), Two Storey Residence – Duplex Type, St. James Subd’n. Consolacion, Rosario, La Union (September, 2010)

ARCHITECT / PROJECT (DESIGN) COORDINATOR Dec., 2008 to Dec., 2009

Obayashi Corporation (Dubai Branch) PO Box 182845, Dubai, UAE

Tel No. +971-*-*******

Fax No. +971-*-*******

Report to Arch’t. Kunihito Araki (Coordinator Manager, Red Line)

Duty Statement: Office Function

•Review Floor Plans, Wall Elevation, and Reflected Ceiling Plans for Shop Drawing development on Burj Dubai Station and Al Garhoud Station – Red Line.

•Conduct Site Inspection if necessary to answer issues regarding Shop Drawing development and As – Bult Drawing progress.

•Prepare Shop Drawings on Floor Plans, Wall Elevation, Reflected Ceiling Plans on Burj Dubai Station and Al Garhoud Station – Red Line.

•Prepare As – Built Drawing on Coordinated Floor Plans, Wall Elevation, Reflected Ceiling Plans of Burj Dubai Station and Al Garhoud Station – Red line.

FREELANCE ARCHITECT Jan., 2007 to Dec., 2008

No. 035 Ofilada St., Consolacion,

Agoo, La Union, Philippines

Architect of the following structure:

Two Storey Residence, Sison, Pangasinan (January, 2008), Two Storey Residence, Sto. Tomas, La Union (March, 2007), Two Storey Residence, Sto. Tomas, La Union (July, 2007)

PROJECT ARCHITECT Dec., 2004 to Jan., 2007

Rohdha Al A’amar Contracting Establishment PO Box 255487, Riyadh, 11353

Kingdom of Saudi Arabia

Tel No. (966) – 01 – 4483456

Report to Mr. Muhammad Din Joyia (Entrepreneur)

Duty Statement: Office Function

•Arrange and review BOQ’s, specifications, construction drawings or tender documents for architectural and/or civil and structural works received from main contractor. If found discrepancies therein, informed and write recommendation of solution referred to the contractor.

•Organized an estimate and pricing for the architectural and/or structural components to be used for fabrication.

•Prepare quotation based on tender documents received from the main contractor.

•Design, draft or set up shop drawings and as-built plan of various architectural and/or civil and structural works if necessary.

•Conduct periodic project site visit, ocular inspection to ensure the quality of workmanship and progress of activity.

•Monitor the development of work based on computerized project management system.

•Perform periodic information or report on the development of organization to the owner of the establishment.

•Develop policies and procedures to improved worker’s efficiency and effectiveness.

FREELANCE ARCHITECT Sept., 2002 to Dec., 2004

No. 35 Ofilada St., Consolacion

Agoo, La Union, Philippines

Architect of the following structure:

Chapel, 150 Seating Capacity, San Nicholas, La Union (August, 2003), Preparatory & Intermediate School, 512 Students, Caba, Aringay, La Union (Nov., 2003), One – Storey Residence, Ubagan, Sto. Tomas, La Union (Dec., 2003), Private Mortuary, 8,535 square meter, Sto. Tomas, La Union (Dec., 2003), One-Storey Residence, Sta. Rita East, Agoo La Union (Jan.,2004), Two-Storey Residence, San Carlos, Pangasinan (Feb., 004), Public Rest Room, Aplaya, San Nicholas, La Union (March, 2004), Room Renovation, Agoo La Union (June, 2004)

ARCHITECT – MTO (Material Take-Off)/SPECIFICATION WRITER Nov., 1997 to Aug., 2002

Ministry of Defense and Aviation (MODA) PO Box 8633, Riyadh, 11492

General Directorate for Military Works (GDMW) Kingdom of Saudi Arabia

Tel No. (966) – 01 – 478900 Ext. 4306

Report to Arch’t. Mizra Kamran Pasha (Dep’t. Head, Nov., 1997 to April, 2002)

Eng’r. Salvador Garcia (Dep’t. Head, April, 2002 to Aug., 2002)

Duty Statement: Office Function

•Developed design criteria in a given budget for government and military facilities to be followed by the architectural designer.

•Re-check architectural design drawings with reference to national building code (NBC), Saudi Arabian Standard (SASO), etc. Write recommendation of solution addressed to the designer if found any discrepancies between architectural drawing design and standard codes.

•Study architectural design drawings and arranged a proposal on material substitution addressed to the architectural designer to suit project construction budget.

•Prepare Tender Documents – specifications and BOQ’s(Bill Of Quantities) for the projects with a capital budget of million Saudi Riyals per year. This Government projects includes Auditoriums, Bomb Shelters, Gymnasiums and Sports Facilities, Housing Accommodations, Hospitals and Clinics, Intermediate and Secondary Schools, Mosques, Military Mess Halls, Office Buildings, Parking Sheds and Royal Guest Houses.

PROJECT ARCHITECT May, 1993 to Dec., 1996

Correa Zenitaka Inc. 11th Flr., Royal Match Bldg., Ayala Ave.,

Makati, Philippines

Tel No. 8865432

Report to Mr. Manuel Bugayong (Estimation Dep’t. Head, May, 1993 to May, 1994)

Arch’t. Hirofumi Kunitani (Engineering Dep’t. Head, May, 1994 to Dec., 1996)

Duty Statement: Office Function

•Re-check tender documents – architectural, civil design drawings and specifications, and write report and recommendation if found discrepancies therein.

•Conduct detailed project estimation based on architectural and civil design drawings.

•Prepare computerized project activity schedule and monthly progress report (Using Microsoft Fast Track Project software).

•Developed and implement computerized project management system – project monitoring merging with project ledgers that produce better management information system (MIS).

•Certify plans and specification of As-Built Drawings.

Project Architect of the following Structures:

Laguna Auto Parts Manufacturing Corporation Building, Sta. Rosa, Laguna (April, 1996), Techno-Iris Building Renovation, Cabuyao, Laguna (Nov., 1995), National Panasonic Air-Con Manufacturing Plant Bldg., Sta. Rosa, Laguna (March, 1995), INA – RP Research Laboratory Bldg., Sta. Rosa, Laguna (Sep’t., 1994), Export – Import Bank of Japan Office Renovation, Makati City (April, 1994), Correa Zenitaka Inc. Office Renovation, Makati City (Feb., 1994), Tokumi Electronic Assembly Factory Bldg., Business Park, Cavite City (June, 1993)

ARCHITECTURAL DRAFTSMAN March, 1993 to May, 1993

Correa Zenitaka Inc. 11th Flr., Royal Match Bldg., Ayala Ave.,

Makati, Philippines

Tel No. 8865432

Report to Mr. Gerald Salmon (Drafting Dep’t. Leader)

Duty Statement: Office Function

•Draft Shop Drawings of Structures in Japanese Standard to be implemented in Japan.

•Due to my abundant experience in building construction, I was endorsed to Engineering Department, Project Implementation Section of Correa Zenitaka.

ARCHITECTURAL DRAFTSMAN/DESIGNER Feb., 1988 to March, 1992

Arch’t. Pablo S. Pestano and Associates No. 129A Craig St. Sampaloc, Manila,

Philippines, Tel No. 7312854

Report to Arch’t . Pablo S. Pestano (Principal Architect)

Duty Statement: Office Function

•Developed design criteria for the proposed project.

•Make presentation drawings – interior, exterior perspective and miniature scaled model.

•Conduct periodic ocular inspection in project site and prepare report for submission to the principal architect for evaluation.

Project Involvement:

Asia Industries Building Complex (Administration Bldg., Warehouse and Shop Bldg., at Domestic Road, Paranaque), Barrio Chapel (Canlubang, Laguna), Barrio Chapel (Pulilan, Bulacan), One Storey Residence (Valenzuela, Bulacan), RC Development Corp. Bldg. – Five level (Makati, City), Twin Swimming Pool (San Joseph Norte, Cabanatuan), Two Storey Residence (Pulilan, Bulacan), Two Storey Residence (Bell-Air, Makati City).

PERSONAL DATA:

Address No. 114 t. Aspiras road, San Antonio, Agoo, La Union, Philippines

Date of Birth December 25, 1970 / Sorsogon City

Nationality Filipino

Sex Male / Blood Type B Height / Weight 163 cm / 57 Kg

Civil Status Married

Spouse Name Felicidad M. Gonzalgo

Education Bachelor of Secondary Education

Major in Physical Education and

Major in Filipino Language

Education BS Architecture

Pamantasan ng Lungsod ng Maynila

Intramuros, Manila

June, 1987 to May, 1993

Secondary School

Mapua Institute of Technology

Doroteo St., Manila, Philippines

June, 1983 to May, 1987

Primary School

Antonio Luna Elementary School

Lico St., Tondo, Manila, Philippines

June, 1977 to May, 1983

Organization UAP (United Architects of the Philippines)

PRC License No: 011967 / ARCHITECT

(Philippine Regulatory Commission)

***END OF RESUME***



Contact this candidate