EXPERIENCE
MAR **** - CURRENT
SNR. PROJECT CONTROL
WEHAYA SDN BHD
2ND TO PETRONAS
PROJECT: PCML BOILER NEW BOILER INSTALLATION & ABF NEW BOILER
1. Develop and define project goals and objectives. 2. Recommend and implement modifications to improve effectiveness and attain project milestones.
3. Plan, coordinate and monitor activities of assigned projects to develop and implement procedures,
processes and systems.
4. Develop detailed task lists and work effort assessment. 5. Prepare short and long-term resource allocation plans based on input from all key players and team members. 6. Oversee schedules and risk management plans and provide serious deviations warnings hindering project results.
7. Identify changes in work scope in the project plan. 8. Ensure to take appropriate planning measures with all clients to reassess, renegotiate and amend scope of work responsibilities, proposals, contracts and budgets. 9. Ensure to convey required project data and information to project teams.
10. Prepare and present regular internal and external project reports for management.
11. Evaluate and analyze with team risks and issues compromising project results and develop plans to
mitigate them.
12. Lead development of baseline schedule and support Project Manager (PM) in Integrated Baseline Review 13. Gather actual data, update project schedule and develop reliable schedule forecast with support from project team
SEPT 2018 – FEB 2019
PLANNING MANAGER
GADANG ENGINEERING SDN BHD
PROJECT : WPC TRX PAKAGE C3 (GADANG HOLDING)
1. Presents development proposals to higher management 2. Sets schedule for project or development and flow of project incumbent requisite materials
3. Supervises other planning personnel, such as consultants and contractors
4. Prepares budget and oversees expenditures
5. Sets goals, policies, and procedures for project schedule MOHD HIZWAN SHARIF
SNR. PROJECT CONTROL
(+60) 12 – 485 5509
adu0js@r.postjobfree.com
EXECUTIVE SUMMARY
More than 11 years of total
experiences in project management
especially Project Planning &
Control. Well verse in project
planning tools i.e Primavera P6 &
Microsoft Project. Have a basic
knowledge in SAP. Enhance the
career from Sub-Contractor to
multinational Company specifically
in project management (PMT).
Strong belief in “ Strategy without
tactics is the slowest road to victory.
Tactic without strategy is the noise
before defeat - Sun Tzu”.
SKILLS & ABILITIES
MS Project, MS Office, Primavera
P6, AutoCAD & basic SAP
ADDRESS
58 JLN KEBUN NENAS 4T/KS8,
BANDAR PUTERA 2, 41200, KLANG,
Selangor,
2
Open
MOHD HIZWAN SHARIF
SNR. PROJECT CONTROL
(+60) 12 – 485 5509
adu0js@r.postjobfree.com
6. Communicates with other managers, supervisors, and colleagues throughout project
7. Performs Delay analysis for the project
MAR 2018 – AUG 2018
LEAD PLANNING ENGINEER
GLOBALRAIL SDN BHD
Establish the Construction & Installation Programme (CIP) for SY201 (Train Signaling & Automated Platform Gate package)
Monitoring progress & report submission within the specific time
AUG 2016- MAR 2018
CONSULTANT PLANNING MANAGER
PROJEK TEKNOLOGI 6D SDN BHD
Seconded to WPC MRT PAKAGE V204 & S204
Task have been performed
1. Establish the baseline for S204 pkg
2. Monitoring progress & report submission within the specific time
3. Delay analysis & mitigation
Seconded to WPC TRX PAKAGE 2 (Gadang Holding)
Task have been performed
1. Establish the baseline for Infra works
2. Monitoring progress & report submission within the specific time
3. Delay analysis & mitigation plan
4. Preparation of tender programme
AUG 2015 - AUG 2016
FPSO OPERATION & MAINTENANCE PLANNER
(INTEGRATED PLANNER) FOR HESS OPERATION
VICTORIA PRODUCTION SDN BHD (PERISAI EMAS JV) KUALA LUMPUR, MALAYSIA
Work Description :
Coordinate Preventive Maintenance (PM), Corrective Maintenance (CM), and Safety Critical Maintenance (SCE)
Monitor the KPI’s/ Performance of the PM,CM & SCE work progress
Plan and prioritize operations to ensure maximum performance and minimum delay
Determine manpower, equipment and vendor needed to cover FPSO production & maintenance
3
Open
MOHD HIZWAN SHARIF
SNR. PROJECT CONTROL
(+60) 12 – 485 5509
adu0js@r.postjobfree.com
Monitor jobs to ensure they will finish on time and within budget
Address issues when they arise aiming for minimum disruption
Obtain output information (number of finished products, percentage of defectives etc.)
Prepare and submit status and performance reports
Collaborate with quality control, warehouse and
Management
Decommissioning FPSO Perisai Kamelia
APR 2014 - APR 2015
PROJECT PLANNING ENGINEER
AWORLDTEC SDN. BHD. KUALA LUMPUR, MALAYSIA
Seconded to Petronas Carigali Sdn Bhd
Work Description :
Responsible for planning and scheduling various project workloads.
Gathers and analyzes information to prepare status reports.
Ensures that assignment and scheduling of work follows company policy.
Evaluates current procedures and recommends changes to improve the efficiency of planning and scheduling of projects
Prepare Weekly & Monthly report containing progress S- Curve and Manpower & Manhours S-Curve and other
information required by Project Control Manager
Involved in tendering activities (ITB preparation, bid evaluation, techno-commercial meetings)
Project involvle
EPCC Pipeline replacement for Sabah Field (SBO)
Topside Modification; Mol Pump Installation (PMO)
EPCC CISkid Installation (PMO)
Topside Modification For Sko Pipeline Rejuvenation Project Pl 381/210 (TKP-A & WLDP-C)
Topside Modification For Sko Pipeline Rejuvenation Project Pl 385/210 (MCOT & WLDP-A)
4
Open
MOHD HIZWAN SHARIF
SNR. PROJECT CONTROL
(+60) 12 – 485 5509
adu0js@r.postjobfree.com
APR 2013 - APR 2014
PROJECT CONTROL ENGINEER
CEKAP TECHNICAL SDN BHD KUALA LUMPUR, MALAYSIA
Seconded to Exxonmobil Malaysia
Work Description :
Planning & scheduling project activities
Develop progress measurement
Monitor, measure, and report project progress
Perform scheduling control and cost control
Develop estimates, budgeting and budget phasing.
Develop manpower planning and periodic manpower
analysis
Produce and present project control report: project progress & forecasts, schedule analysis, cost reports inclusive cost analysis and forecasts, utilising SPI, CPI, earned value etc.
Advise the Project Manager on decisions that affecting schedule and cost.
Project involvle
Guntong Brownfield rejuvenation
Structural & piping Rejuvenation at Guntong Field
Guntong D Debottlenag Rejuvenation project
DEC 2011 - APR 2013
PLANNING & PROJECT CONTROL ENGINEER
MMC OIL & GAS ENGINEERING SDN BHD KUALA LUMPUR,
MALAYSIA
JUN 2011 - DEC 2011
PROJECT / PROCUREMENT MANAGER
PKNMOG SDN BHD MELAKA, MALAYSIA
AUG 2010 - JUN 2011
PLANNER & SCHEDULLER
SANKYU (M) SDN BHD JOHOR, MALAYSIA
DEC 2009 - AUG 2010
PLANNER & PROJECT ENGINEER
SCIENCE TECH SOLUTION SDN BHD MELAKA, MALAYSIA
MAY 2007 - DEC 2009
PROJECT ENGINEER.
KEJURUTERAAN LETRIK SERI SDN BHD. SELANGOR, MALAYSIA 5
Open
MOHD HIZWAN SHARIF
SNR. PROJECT CONTROL
(+60) 12 – 485 5509
adu0js@r.postjobfree.com
EDUCATION
Open University Malaysia
Master Business Administration (MBA) Malaysia
Universiti Malaysia Perlis (UniMAP)
Bachelor's Degree in Engineering (Electrical/Electronic) Malaysia REFERENCES
AHMAD HARIS LEE
PROJECT MANAGER PETRONAS
AZRIE SYED
DIRECTOR AT PROJEK TEKNOLOGI 6D SDN BHD
HAIRANI HASSAN
OPERATION MANAGER VICTORIA PRODUCTION
PERISAI KAMELIA FPSO