J. Scott has over ** years of experience with transportation civil engineering and utilities. He has 12 years of experience in airport program management, planning, design and construction management at DTW, MIL, STL, MDW, ORD, DEN and GYY airports. 2018-20 fiber optic network design included last mile AT&T, fiber to the home for 4000 homes in Pella, Iowa and smart grid power substation control fiber network across Iowa. He has subsurface underground utility experience with local, county and state roadways, highways, light rail extensions, airports, railroads, fiberoptic networks and power substations. Expect accuracy in ground control, and ability to weigh record documents, occupation evidence and boundary surveys with utility locations.

Mr. Phipps applies ASCE 38 to surface utility locates, fits occupations for right of way then applies ASCE 38 quality levels to plot best judged position from records using the right of way solution. Preliminary Engineering requires level C or better locates for preliminary cost estimate. Design requires specific scoping of level B and A for relocations. A grant decision tied to scope of utility relocations requires ties to project monuments, with ground truth resulting in utility relocation cost estimate. The land acquisition for Metro St. Louis light rail was tied to FTA approved utility relocations. Scott report status of 335 plats and legal descriptions to acquisition for 22 miles of track, 7 stations and maintenance yard. Mr. Phipps completed five ALTA/ACSM Land Title Surveys with boundary analysis in Jackson County Missouri in 2017 and continues a practice of transportation engineering led by surveying.

MS, Civil Engineering, University of Kansas, 1994

BS, Civil Engineering, University of Missouri, Construction Mgmt. 1983

Pre-engineering, Missouri State University 1981

Licensed Professional Engineer IL, IA and MO. Comity by NCEES record

Professional Land Surveyor, IL and MO

Certified Construction Manager, Construction Managers Association of America

Project Management Professional, Project Management Institute

Commercial Pilot, Airplane Single Engine Land-Instrument, FAA

Member of the American Society of Civil Engineers Chicago Chapter

American Surveying and Engineering, Naperville, IL 10-6-22 to 11-4-22

A.Cook County Forrest Preserve Salt Creek HQ, 10-6-22 to 10-20-22

under prime Studio GC

Constructability review of boundary survey, drainage, gasoline and propane dispensery, leaking underground storage tank clean up, Illinois Fire Marshall village jurisdiction, topographic survey Subsurface Utility Engineering. The project was in MWRD permit review of Phase 2.

B.Route 30 Township Road Bridges, Lee County, IL 10-15-22 to 11-4-22

Illinois DOT District 2 under Midwest Engineering

Constructability review of two township road three sided bridges for scour and erosion protection, new drain tiles in adjoining fields, flap gate controls and local ditch maintenance. HECRAS v8 model with HEC 18 scour depth calculations.

Sanchez and Associates, PC., Chicago, IL 9-6-21 to 8-22-22

A.Cottage Grove Corridor Spec #738719 Cat. 3, 10-6-21 to 12-1-21

under prime Peralte-Clark Engineers for CDOT

Manager of topographic survey and Subsurface Utility Engineering along the South Cottage Grove Corridor including 41st through 49th Streets. Performed topographic surveys to ASCE 38-02 quality level D (QL D) utility engineering and existing utility structures to QL C throughout the corridor including 43st through 49th Streets. The project is currently in Phase 2 design.

B.CTA Bus Bridge at Harlem at I-90 10-6-21 to 3/2/22

under prime HNTB for CTA

Manager of the topographic survey and Surface Utility Engineering for the future expansion at the CTA Harlem Station on I-90. Subsurface Utility Engineering consisted of topographic survey to QL D and right of way and identifying and locating existing utility structures within the Right of Way of I-90, Chicago Streets and CTA Harlem Station for Harlem Ave. station expansion currently ongoing.

C.Gallistel Academy Improvements 02/21/22 to 6-1-22 under prime Upland Design for CPS

Manager of topographic and boundary and surveying, and subsurface utility engineering QL C. Subsurface utility engineering was performed under ASCE 38-02 standards. Ongoing design of future improvements to the Chicago Public Schools (CPS).

D.Illinois Route 41 Corridor Right of Way Survey 3-1-22 to 3/15/22

Illinois DOT District 1 Right of Way and Surveys

Boundary and topographic surveying for Illinois Route 41 and Illinois Route 176 expansions around and through Lake Bluff, IL under IDOT District 1 contract 13948.

Veterans Sourcing Group for ComEd, Oakbrook, IL 12-8-20 to 12-28-20

Construction Manager

Fiber Hut Delivery for ComEd smart grid fiber optic substation controls data centers at seven substations in northern Illinois. Field Observations of contractor safety in delivery of Charles Industry fiber huts.

NewCom Technologies, Des Moines, IA 5-30-19 to 6-24-20

Outside Plant Data Network Project Manager

Project Manager relocating Verizon Zayo and Aureon fiber network in Des Moines region. Three companies telcom companies have point of presence equipment in 666 Walnut, Des Moines and fiber relocation was required under SUE Quality Level A. Five fiber optic cables were routed out of the Surety Hotel into duct in the street through parking garage and up the elevator shaft in 666 Walnut. Utility locates were per ASCE 38-02 QL B permitted by the City. Scott hired ground penetrating radar to locate parking garage wall steel reinforcement to set the core of garage walls through the work zone of a Walsh Constuction building rehab for 4 star Surity Hotel completed 4/1/2020. Scott surveyed to QL C then planned, designed and led construction of same Verizon Zayo and Aureon fibers around Grimes, Iowa County Line Road project completed 5/28/2020 verifying depths to QL C. As Engineer of Record for Pella Fiber to the House Contract he designed high speed internet to 4000 homes and businesses and recommended award to Excel Utilities of the first contract in Pella, Iowa 5/20. He served as MidAmerican Energy project engineer for Phase 3 substation fiber optic control network across Iowa. Permitting included under 400 miles and a USACE Omaha 408 levee crossing in Harrison County, IA completed 6/1/2020.

Meca Engineering, Lake Station, IN for Praxair Spring 2011

Project Manager

Subsurface Utility Engineering surveying, planning and design of protection from rail track loading of Praxair (now Linde) argon, oxygen and nitrogen pipeline in the CN Railroad Kirk Yard completed 4/11. Surveying boundary and topography with pipe locates to QL A resulting in design of protection for gas pipes crititcal to the region around US Steel in Gary, IN completed 4/2011.

CHC Consulting, Kansas City, MO 8/16 – 1/17

Outside Plant Data Network Design Engineer

Designed fiber optic cable and terminal systems for 36 AT&T commercial customers in MO, KS and AR in a program called advanced ethernet. Business Development of planning, design and construction services.

Anderson Survey, Lee’s Summit, MO 12/15 – 1/16

Professional Land Surveyor

Completed three 2011 ALTA boundary and topographic surveys with AutoCad Civil 3D. Kansas City Area Transportation Authority of a bus park and ride lot at 3rd and Grand in Old Town. High end retail and restaurant property owned by Taubman at 47th and Pennsylvania on the Country Club Plaza, Foreclosed vacant commercial property in Belton, MO. Spilt Jackson County and in Cass County rural lots requiring deed research, boundary fit, monuments, legal description and certificate of survey.

Environmental Works, Inc., Kansas City, MO 10/14 – 4/15

Project Manager

Evaluation of BNSF Railway Yard industrial wastewater pipe network and plant at the Argentine and Murray Rail Yards using the BNSF industrial wastewater integrity procedure. QL C moving map locates and moving map to dodge trains for safety. Vacuum truck water jet cleaning followed by videography and testing to confirm condition of 10,311 feet of pipe at Argentine Yard and fuel waste system at Murray Yard. Pipe condition rating, manhole surveys, and non-destructive testing were completed using iBak system with field geolocation, and condition tracked and reported using Kansas State Plane AutoCad Civil 3D drawings.

Transystems. Kansas City, MO 4/14 – 10/14

Construction Manager

Phase 3 construction management of BNSF 9000 ft. Siding, Urbana, North Dakota leading Reilly Construction daily safety meetings and contract progress meetings to completion 10/14. The improvement was designed by Transystems to construct 15’ offset track bed for two #20 switches with turnouts, signal sheds and facilities designed for extreme weather and fiber optic positive train control. Storm sewers maintained statutory wetlands defended with the local drainage district. Phase 3 construction management of the Third Mainline track in Pasco Yard, Pasco, Washington and additional yard track in Pasco Yard accommodated the coal respray building requiring 15’ offset track bed construction coordinating track with Amtrak passenger traffic and building construction. Track laying was delayed til 2015.

Larson Engineering, Naperville, IL 2/13 – 5/13

Sr. Civil Engineer

Business Development with public transportation clients for pavement management, surveying and aviation in the Chicagoland.

Landmark Group, Naperville, IL 8/12 – 11/12

Sr. Civil Engineer

100 Year levee certification of the Green Bay Levee and Drainage District with 22 square mile interior serving 50 rural farms intending to safely accommodate a new nitrogen fertilizer plant with 200 jobs. The major hydraulic study completed 11/12 and vetted through FEMA Region 7 requiring alternative analysis and four HECRAS models, topographic surveying and 2010 Lee County Flood Study.

Jay Dee Contractors, Chicago O’Hare Airport 2/12

Field Engineer

Submittals for mobilization to construct $34M Trunk Sewer E for future Runway 9C-27C with 14-foot diameter pipe jacking under live runway and taxiways deconflicted from utilities and fiber optic-controlled glide slope navigational aid.

Hill International, Gary, Indiana 1/08 – 4/09

Airport Runway Extension Program Manager

Program Manager for the 1900-foot Runway extension program. Relocated Citgo 60,000-barrel fuel tank, the INDOT Cline Ave. outer road, a truck maintenance business and Yellow Freight transfer yard. Purchase of banked wetlands. Planning for EPA super fund cleanup. Relocation of consortium owned cellular tower with fiber optic backbone in rail right of way. Construction management of $16M NIPSCO underground transmission ducts and 345kV/135kV substation. Supervision of one inspector and airport project staff. Fiduciary to the Board using Primavera Contract Manager and MS Project controls.

AECOM, Denver International Airport, Denver, CO 4/06 – 7/07

On-Site Pavement Assessment Project Manager

Project Management for Geospatial airfield pavement evaluation and management system (GAPEMS) under a $2.3M FAA grant to survey and predict remaining pavement life and forecast grant funded pavement capital improvement program.

Completed coring, petrography, smoothness, and survey pavement condition.

ArcMap GIS and ArcView/ArcPad tablets collected geolocated distress photos distresses on over six million square yards of concrete pavement. MS Project master schedule completion was one month early allowing collecting of historic pavement data and testing. Reviewed design of $46M 2007 Capital Pavement repair plans.

Delta Engineering, Chicago, IL under prime Burns and McDonnell 2004 – 2005

Airfield Civil Engineer

Airfield Civil Engineer design of hot tap 90” water main around Runway 9L-27R at O’Hare. Primavera P3 schedule, Prolog project monitoring and reporting and Micro station/Geopak drawings coordinated with the City of Chicago Department of Water Management standards to miss FAA fiber optic ducts connecting glide slope and localizer navigational aids.

AECOM, Chicago, IL for IDOT Aeronautics and FAA HQ 2003 – 2004

New Air Carrier Airport Planner

South Suburban Airport (now Bolt Field) airport planner delivering MS Project resource loaded inaugural air carrier airport schedule and feasibility study including $500M cost estimate and work breakdown structure showing projects necessary to complete construction of one 9000’ runway, five gate inaugural airport with balanced earthwork. Design was by Microstation Inroads completed 3/04 and Geopak to balanced earthwork over a 2200-acre site with reconfigured roadway network, all redundant utilities, cargo facility, general aviation fixed base, FAA tower and navigational aids.

AECOM, Chicago, IL 2001 – 2003

Midway Airport Terminal Quality Assurance Manager

Quality Assurance Manager for Airport Terminal Reconstruction Program.

Prepared non-conformance reports and monitored prime building shell and apron contractor quality control completed 7/03. 10 phase building with fixed airline gate deadlines requiring finished building with secure doors and all reliable life safety, power, cellular and communication closets with interior distributive antenna tenant communication systems. Performed independent quality assurance testing 24/7 under continuous air carrier operation as part of Kenny Rust Midway Joint Venture. Six direct report inspectors.

Jacobs, Detroit Metro Airport, St. Louis Lambert Airport 1998 – 2001

Runway Program Management

Project coordinator Phase 1 Lambert St. Louis Airport North Roads package of highway, county road and local road relocation on the north side of runway 11-29 opened 4/06. The road design team Scott led in selecting at Burns and McDonnell designed roads around the runway leading to the six lane Lindbergh Boulevard highway tunnel under the new runway and reconnecting the roadway grid before 9/11/01. Utility relocation point of contact for the program each utility was phase relocated including FAA fiber optic and power for radar and navigational aids. Negotiated $1.3M design professional service contract to coordinate roadways with utility relocation, land acquisition, 11M cy earthwork, ingress, construction staging, FAA navigation aids with goal of no service interruptions. Also, Project coordinator Phase 2 design of the west side of Detroit Metro Airport to accommodate a new $72M 10000’ landing runway 4L-22R. My service was completed 12/01 after I acquired and cleared industrial land, Wayne Road, airfield fence, earthwork, 60” diameter pressure storm drainage, pavement lighting, signage and surface restoration. Negotiated relocation of Detroit Edison power, water and gas systems and sequenced construction to coincide with opening of one mile long Detroit Metro McNamara Delta Terminal. Established reimbursable agreements with FAA for navigational aids, ASR-9 radar and redundant reliable fiber optic/power.

Jeffrey ‘Scott’ Phipps

Professional Engineer

Professional Land Surveyor

Project Manager

Illinois PE Lic. 062-050582

Exp. 11/30/2023

Since 1996

Illinois PLS Lic. 035-003650

Exp. 11/30/2024

Since 2005

Comity PE by NCEES record 17-420-68, original MO

Original PLS MO

Certified Construction Manager No. A1496

CMAA

Expires: 7/31/2024

Project Management Professional 1040882

PMI

Education

Professional Registrations

Professional Experience



Contact this candidate