Robert Addison
CENTRAL PLANT ENGINEER - LONG BEACH CONVENTION CENTER
Winnetka, CA 91306
adu0ca@r.postjobfree.com
• To find an opportunity where my skills can be utilized and enhanced to provide excellent service. Work Experience
CENTRAL PLANT ENGINEER
LONG BEACH CONVENTION CENTER
2015 to Present
• Responsible for all water testing and treatment for 2 central plants
• Responsible for maintaining the central plant's chemical inventory.
• Responsible for the operation and preventative maintenance of chillers and boilers that supply heating and chill water to an offsite downtown business and all events
• Operate, repair and maintain water filters softeners, piping, pumps, valves etc.
• Overall responsibilities include the operation of boilers, chillers, water treatment, generators, electrical systems, and auxiliaries affiliated with the central plant.
• Responsible for the scheduling of all events that occur on a day to day basis regarding A/C and lighting.
• Responsible for operating within design capabilities and proper environmental conditions by maintaining an effective EMS system.
CHIEF ENGINEER
RESIDENCE INN BY MARIOTT
2014 to Present
• Manage all engineering/maintenance/renovation operations, including maintaining the building grounds and all HVAC units/boilers with particular attention towards safety, security and asset protection. Collected proposals for all projects and made a decision based on my investigation.
• Accountable for managing the budget, capital expenditure projects, preventive maintenance program and energy conservation. Maintained property according to Federal and State regulations
• Responsible for maintaining regulatory requirements. Leads the emergency response team for all facility issues.
• Responsible for training all staff on Safety including Lock-Out/Tag-Out System CHIEF ENGINEER
ABLE ENGINEERING
2005 to 2014
• Supervise the operation, performance and maintenance of all mechanical, electrical, and craft services, ensuring operation within design capabilities and proper environmental conditions by maintaining an effective EMS system. Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems. Supervise the maintenance crew and contract security.
• Administer an effective preventive maintenance system tailored to the facility. Maintained property according to Federal and State regulations
• Manage proposals to prepare yearly budgets ($1,000,000+) regarding all facility operations including utilities. Responsible for the day to day acquisition of materials and supplies ASST. CHIEF ENGINEER
TOLIN MECHANICAL
2004 to 2005
• Supervise the operation, performance and maintenance of all mechanical, electrical, and craft services, ensuring operation within design capabilities and proper environmental conditions by maintaining an effective EMS system. Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems. Supervise the maintenance crew and contract security.
• Administer an effective preventive maintenance system tailored to the facility. Maintained property according to Federal and State regulations
• Manage proposals to prepare yearly budgets ($1,000,000+) regarding all facility operations including utilities. Responsible for the day to day acquisition of materials and supplies CENTRAL PLANT ENGINEER
UNIVERSITY HOSPITAL
2003 to 2004
• Responsible for the preventive maintenance, operation, and maintenance of the central plant
• Responsible for service calls and repairs of lighting, beds, plumbing, electrical, etc.
• Operate, repair and maintain water filters softeners, piping, pumps, valves
• Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems.
CENTRAL PLANT ENGINEER
WHITE MEMORIAL HOSPITAL
1999 to 2003
• Responsible for the preventive maintenance, operation, and maintenance of the central plant
• Responsible for service calls and repairs of lighting, beds, plumbing, electrical, etc.
• Operate, repair and maintain water filters softeners, piping, pumps, valves
• Responsible for JCAHO compliance checklist and the removal/correction of any safety hazards
• Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems
Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems.
MACHINE OPERATOR
FAIRCHILD FASTENERS AEROSPACE
1995 to 1999
Responsible for manufacturing parts by the use of blueprints Responsible for inspecting all previous part sequences according to the blueprint CENTRAL PLANT ENGINEER
QUEEN OF ANGELS HOSPITAL
1993 to 1995
• Responsible for the preventive maintenance, operation, and maintenance of the central plant
• Responsible for service calls and repairs of lighting, beds, plumbing, electrical, etc.
• Operate, repair and maintain water filters softeners, piping, pumps, valves Overall responsibilities include the operation of boilers, chillers, water treatment, generators, and electrical systems
SAFETY AND SECURITY MANAGER
KAISER HOSPITAL/INTERCON
1987 to 1993
Responsible for daily security coverage and payroll for all officers. Conducted JCAHO prescreening inspection to include all electrical rooms for proper labeling and current infrared testing. Assured all safety and warning signs were posted: all MSDS sheets were locally displayed BOILER TECHNICIAN
BT
1983 to 1987
• Responsible for the operation and maintenance of steam plants 600 psi boilers and associated equipment
• Responsible for the water, lube oil, and fuel test and treatment
• Responsible for the transfer of water and fuel from storage tanks to service tanks while maintaining a zero list on the ship
• Responsible for OPPE compliance/certification checklist Education
Associate in HVAC
Los Angeles Trade Tech - Los Angeles, CA
September 2007 to May 2008
Skills
• Electrical
• HVAC
• Hand Tools
• Maintenance
• Plumbing
• Project Management
• Troubleshooting
• blueprints
Certifications and Licenses
Unlimited Steam Engineer
May 2019 to May 2020
Steam Plant and Chiller Operations