Post Job Free

Resume

Sign in

Project Superintendent Assistant

Location:
Summerville, SC, 29486
Salary:
90k to 100k
Posted:
December 09, 2022

Contact this candidate

Resume:

RESUME

HENRY V. LOVE, JR

*** ***** **

Summerville, SC 29486

253-***-**** cell

adtym4@r.postjobfree.com

Computer Programs - MicrosoP Projects, Word, Excel, Pro-Log, EducaTon: BS, EducaTon, AGC Classes, OSHA 10 & 30, First Aid, CPR, Management Safety, Project Manager, Blue Print reading

Types of ConstrucTon

Structural Steel, Concrete (all wall & slab forms), Precast, Tilt-ups, PT Slabs, Wood Framing, Metal Framing, Panelized buildings, complete site development

Building Types

High Rise, Low Rise, Mix Use, Hotels, Casinos, Retail, Schools, Prison remodels, assisted living, Low income Housing, Boeing Hangers 737 & Military

WORK HISTORY

Accrete ConstrucTon, Puyallup, WA

10-1-19 - 5-1-20 Project Superintendent

Homeland Security TI

Approximately 21,000 sq P. Metal studs, office cubicles, holding pen, bulletproof panels for front of building and main lobby. CommunicaTon room surrounded by bulletproof panel Redhawk Group, Seafle, WA

11-15-11 – 10-20-20 Project Superintendent

6-19-19 - 10-20-20

Candlewood Suites, Sumner, WA (14.5 million)

132 unit hotel

4 story, wood framed

Slab on grade foundaTon

Complete site package

3-11-15 to 12-15-16

Hampton Inn, Seafle, WA (25 million)

5 levels of wood framing

3 levels of PT slabs

2 floors of underground parking

Stucco Exterior

Indoor swimming pool

ABC State award for $10 million/over New ConstrucTon 1-15-14 to 3-3-15

521 Apartments, Seafle, WA(7.5 MILLION)

33 residenTal units

4 commercial units

4 story of wood framing

Slab on grade

Also had one elevaTon of Tlt up walls (wood)

11-9-12 to 12-27-13

1711 Apartments, Seafle, WA (6.1 million)

29 residenTal units

4 commercial units

Slab on grade

4 stories wood framing

Design Tlt up walls due to property line

1-6-12 to 9-9-12

White Fish, MT (2.1 million)

Best Western, Casino remodel

Added area to increase from 50 slot machines to 175 slot machines 11-15-11 – 1-6-12

Hillcrest Apartments Remodel

Remodel of exisTng complex

5 buildings

Addi$onal Du$es

• Es$ma$ng

• Drawing Reviews

E KENT HALVORSON, Redmond, WA

4-1-07 to 9-18-09 Project Superintendent

RiverTde Suites, Seaside Oregon, (11.5 million)

5-story wood frame, Kitchens in all suites, indoor swimming pool, Avia Hotel, Napa California, Project Superintendent, (28 million) 5-story structural metal framing, PT Slab, 4 Star, marble & wood floor finishes Stucco & Stone finish, Kitchen Addi$onal Du$es

• EsTmaTng

• Drawing Reviews

RUSHFORTH ConstrucTon, Tacoma, WA

9-30-04 to 3-30-07 Project Superintendent

Assisted Living (low income housing) Bothell, Washington, HUD Project,(17.5 million) 7 acre site development, 132 units 3-story wood frame, full kitchen, medical faciliTes, framing crew consisted of a 65 man crew, framed in place, all wood backing for Handicap rails, mirrors, hanging cabinets, misc. Corridor rails & stairway rails, helped with lumber take off, walked all framing inspecTons with city inspector, scheduled all framing inspecTons, oversaw all finishes to final C of O Tribal Development Ocean Shores, WA, Ramada Hotel, restaurant & indoor water park & 2 5-story Condo’s, Hotel was panelized walls & TGI floor joist, reviewed panel drawings and scheduled panel delivery, repaired any mistakes with the panels on site. All aspects of framing was performed by Rushforth employees, oversaw all finishes to final inspecTon, (18 million)

Water Park - underground holding tank poured in place, Structural Steel Framing, Aluminum Siding Afached to the Hotel

Remodel of main office, Tacoma, Washington

Mix-use, Seafle, Washington, (5.1 million)

wood framed on top of pt slab 3 stories, performed with Rushforth employees, lumber take off, All RFI’s on framing, scheduled all inspecTons

Addi$onal Du$es

• EsTmaTng

• Drawing Reviews

• Site Review

• Schedule Review

GBC Concrete, Maple Valley, WA

3-15-04 to 8-31-04 General Superintendent

Concrete UTlitors, Fort Greely, Alaska, (6.5 million) 2400 FT of underground uTlity tunnels poured in place, Tilt-up with split panels with insulaTon in the middle, administraTon building

All concrete foundaTon and slabs for Hospital Fort Wainwright, Fairbanks, Alaska, (6.6 million) Remodel Two exisTng hangers, removed inside SOG’s and reworked underground piping AECON Buildings, Lynnwood, WA

5-15-95 to 3-12-04 Project Superintendent

Wal-Mart, Auburn, WA,

CMU exterior, structural columns & Joist, complete site Package, (3.2 million) Kaneeta Indian Casino, Warm Springs, OR,(5.5 million) Added to an exisTng Hotel, wood frame structure, addiTonal complete site package Camlu Assisted Living addiTon, Albany, OR,(3.2 million) Slab on grade, single story, 98 unit addiTon, did lumber take off, all RFI’s concerning framing, Quality control of framing, walked all inspecTons with city inspector, scheduled all inspecTons to C of O, oversaw all finishes to final C of O

LDS Church, Mill Creek, WA,(2.9 million)

Wood framed with premade studs for exterior walls, standard studs interior walls, lumber take off, walked & scheduled all inspecTons with city

Quinault DesTnaTon Resort & Casino, Ocean Shores, WA 46 million (building, paving, landscaping)(10 million) site uTliTes

Casino & convenTon area Structural steel, South wing 5 stories wood framing, North wing 5 stories metal framing, indoor swimming pool in south wing

Complete Spa Area, 1300 P sea wall, 300 acre complete site development/wet lands included Addi$onal Du$es

• EsTmaTng

• Drawing Review

• Project interview

PCL, Bellevue, WA

2-2-92 to 9-30-93

McNeil Island Prison Remodel/General Foreman/ Superintendent,(8.9 million) Four part remodel, all uTliTes reworked, retaining walls, new laundry (Tilt-up), moved guard towers, new liP staTon, repaved roads around prison

ELLIS DON Bellevue, WA

3-1-90 to 2-1-92 Project Superintendent

North shore JR High School, (27 million)

CMU Exterior walls with stucco coaTng, large radius Glue Lamb Beams all interior framing wood walls & backing, 7 Acre site, 5 building complex/with Football & baseball fields HOWARD S WRIGHT

2-28-78 to 2-28-90

Metro Bus Barn, Concrete Superintendent, EFCO wall forms & precast Deck panels,(22 million) Thousand Trail complex, Assistant Superintendent, (26 million) 4 Building complex Arch. Concrete All four buildings, gang form wall panels designed on site Boeing 486 hanger addiTon, Project Superintendent, structural steel trusses built on site 300P by 50P deep major truss, 100P Te in trusses,( 9.5 million) Terminal 406, Concrete Superintendent, Tilt-up 42P by 28P panels by 12” thick, (8.8 million) Oregon flower Market 240K Tlt-up Project Superintendent All panels Paralagrams,6.6 million

Management Group 3 years. LA area oversaw 3 projects. All sites mulT-story with Structural Elevated Slabs 18 million

Seafle Truss 42 Story Office Building, Superintendent oversaw all concrete in the tower, (66 million)



Contact this candidate