RESUME
HENRY V. LOVE, JR
Summerville, SC 29486
253-***-**** cell
adtym4@r.postjobfree.com
Computer Programs - MicrosoP Projects, Word, Excel, Pro-Log, EducaTon: BS, EducaTon, AGC Classes, OSHA 10 & 30, First Aid, CPR, Management Safety, Project Manager, Blue Print reading
Types of ConstrucTon
Structural Steel, Concrete (all wall & slab forms), Precast, Tilt-ups, PT Slabs, Wood Framing, Metal Framing, Panelized buildings, complete site development
Building Types
High Rise, Low Rise, Mix Use, Hotels, Casinos, Retail, Schools, Prison remodels, assisted living, Low income Housing, Boeing Hangers 737 & Military
WORK HISTORY
Accrete ConstrucTon, Puyallup, WA
10-1-19 - 5-1-20 Project Superintendent
Homeland Security TI
Approximately 21,000 sq P. Metal studs, office cubicles, holding pen, bulletproof panels for front of building and main lobby. CommunicaTon room surrounded by bulletproof panel Redhawk Group, Seafle, WA
11-15-11 – 10-20-20 Project Superintendent
6-19-19 - 10-20-20
Candlewood Suites, Sumner, WA (14.5 million)
132 unit hotel
4 story, wood framed
Slab on grade foundaTon
Complete site package
3-11-15 to 12-15-16
Hampton Inn, Seafle, WA (25 million)
5 levels of wood framing
3 levels of PT slabs
2 floors of underground parking
Stucco Exterior
Indoor swimming pool
ABC State award for $10 million/over New ConstrucTon 1-15-14 to 3-3-15
521 Apartments, Seafle, WA(7.5 MILLION)
33 residenTal units
4 commercial units
4 story of wood framing
Slab on grade
Also had one elevaTon of Tlt up walls (wood)
11-9-12 to 12-27-13
1711 Apartments, Seafle, WA (6.1 million)
29 residenTal units
4 commercial units
Slab on grade
4 stories wood framing
Design Tlt up walls due to property line
1-6-12 to 9-9-12
White Fish, MT (2.1 million)
Best Western, Casino remodel
Added area to increase from 50 slot machines to 175 slot machines 11-15-11 – 1-6-12
Hillcrest Apartments Remodel
Remodel of exisTng complex
5 buildings
Addi$onal Du$es
• Es$ma$ng
• Drawing Reviews
E KENT HALVORSON, Redmond, WA
4-1-07 to 9-18-09 Project Superintendent
RiverTde Suites, Seaside Oregon, (11.5 million)
5-story wood frame, Kitchens in all suites, indoor swimming pool, Avia Hotel, Napa California, Project Superintendent, (28 million) 5-story structural metal framing, PT Slab, 4 Star, marble & wood floor finishes Stucco & Stone finish, Kitchen Addi$onal Du$es
• EsTmaTng
• Drawing Reviews
RUSHFORTH ConstrucTon, Tacoma, WA
9-30-04 to 3-30-07 Project Superintendent
Assisted Living (low income housing) Bothell, Washington, HUD Project,(17.5 million) 7 acre site development, 132 units 3-story wood frame, full kitchen, medical faciliTes, framing crew consisted of a 65 man crew, framed in place, all wood backing for Handicap rails, mirrors, hanging cabinets, misc. Corridor rails & stairway rails, helped with lumber take off, walked all framing inspecTons with city inspector, scheduled all framing inspecTons, oversaw all finishes to final C of O Tribal Development Ocean Shores, WA, Ramada Hotel, restaurant & indoor water park & 2 5-story Condo’s, Hotel was panelized walls & TGI floor joist, reviewed panel drawings and scheduled panel delivery, repaired any mistakes with the panels on site. All aspects of framing was performed by Rushforth employees, oversaw all finishes to final inspecTon, (18 million)
Water Park - underground holding tank poured in place, Structural Steel Framing, Aluminum Siding Afached to the Hotel
Remodel of main office, Tacoma, Washington
Mix-use, Seafle, Washington, (5.1 million)
wood framed on top of pt slab 3 stories, performed with Rushforth employees, lumber take off, All RFI’s on framing, scheduled all inspecTons
Addi$onal Du$es
• EsTmaTng
• Drawing Reviews
• Site Review
• Schedule Review
GBC Concrete, Maple Valley, WA
3-15-04 to 8-31-04 General Superintendent
Concrete UTlitors, Fort Greely, Alaska, (6.5 million) 2400 FT of underground uTlity tunnels poured in place, Tilt-up with split panels with insulaTon in the middle, administraTon building
All concrete foundaTon and slabs for Hospital Fort Wainwright, Fairbanks, Alaska, (6.6 million) Remodel Two exisTng hangers, removed inside SOG’s and reworked underground piping AECON Buildings, Lynnwood, WA
5-15-95 to 3-12-04 Project Superintendent
Wal-Mart, Auburn, WA,
CMU exterior, structural columns & Joist, complete site Package, (3.2 million) Kaneeta Indian Casino, Warm Springs, OR,(5.5 million) Added to an exisTng Hotel, wood frame structure, addiTonal complete site package Camlu Assisted Living addiTon, Albany, OR,(3.2 million) Slab on grade, single story, 98 unit addiTon, did lumber take off, all RFI’s concerning framing, Quality control of framing, walked all inspecTons with city inspector, scheduled all inspecTons to C of O, oversaw all finishes to final C of O
LDS Church, Mill Creek, WA,(2.9 million)
Wood framed with premade studs for exterior walls, standard studs interior walls, lumber take off, walked & scheduled all inspecTons with city
Quinault DesTnaTon Resort & Casino, Ocean Shores, WA 46 million (building, paving, landscaping)(10 million) site uTliTes
Casino & convenTon area Structural steel, South wing 5 stories wood framing, North wing 5 stories metal framing, indoor swimming pool in south wing
Complete Spa Area, 1300 P sea wall, 300 acre complete site development/wet lands included Addi$onal Du$es
• EsTmaTng
• Drawing Review
• Project interview
PCL, Bellevue, WA
2-2-92 to 9-30-93
McNeil Island Prison Remodel/General Foreman/ Superintendent,(8.9 million) Four part remodel, all uTliTes reworked, retaining walls, new laundry (Tilt-up), moved guard towers, new liP staTon, repaved roads around prison
ELLIS DON Bellevue, WA
3-1-90 to 2-1-92 Project Superintendent
North shore JR High School, (27 million)
CMU Exterior walls with stucco coaTng, large radius Glue Lamb Beams all interior framing wood walls & backing, 7 Acre site, 5 building complex/with Football & baseball fields HOWARD S WRIGHT
2-28-78 to 2-28-90
Metro Bus Barn, Concrete Superintendent, EFCO wall forms & precast Deck panels,(22 million) Thousand Trail complex, Assistant Superintendent, (26 million) 4 Building complex Arch. Concrete All four buildings, gang form wall panels designed on site Boeing 486 hanger addiTon, Project Superintendent, structural steel trusses built on site 300P by 50P deep major truss, 100P Te in trusses,( 9.5 million) Terminal 406, Concrete Superintendent, Tilt-up 42P by 28P panels by 12” thick, (8.8 million) Oregon flower Market 240K Tlt-up Project Superintendent All panels Paralagrams,6.6 million
Management Group 3 years. LA area oversaw 3 projects. All sites mulT-story with Structural Elevated Slabs 18 million
Seafle Truss 42 Story Office Building, Superintendent oversaw all concrete in the tower, (66 million)