CURRICULUM VITAE
OF
RIVELE XITSUNDZUXO WELSH
*.PERSONAL DETAILS
SURNAME : RIVELE
FIRST NAMES : XITSUNDZUXO WELSH
DATE OF BIRTH : 1989-08-20
IDENTITY NUMBER : 890**********
ADDRESS : ** *******E ST
LOTUS GARDENS
PRETORIA
0025
LANGUAGES : XITSONGA
: ENGLISH
: SEPEDI
DRIVER’S LICENCE : CODE 10 WITH PrDP
TRANSPORT : OWN
CONTACT NUMBER : 079*******
ALTARNATIVE NUMBER : 078*******(FATHER)
EMAIL ADDRESS : adtvu4@r.postjobfree.com
NATIONALITY : SOUTH AFRICAN
2.EDUCATIONAL QUALIFICATIONS
HIGH SCHOOL ATTENDED : CHAMANDU HIGH SCHOOL
HIGHEST GRADE PASSED : GRADE 12
SUBJECTS PASSED : SEE ATTACHED
YEAR PASSED : 2010
NAME OF INSTITUTION : TSHWANE SOUTH FET COLLEGE
COURSE : ELECTRICAL ENGINEERING
LEVEL : NATIONAL N DIPLOMA& TRADE TEST (SEE ATTACHED)
YEAR COMPLETE : 2017
3.WORK EXPERIENCE
3.1.NAME OF COMPANY : BIDVEST FM
POSITION : TECHNICAL ASSISTANT
DURATION : 15 NOVEMBER 2021 TO DATE
3.2. NAME OF COM : PLUMBLINK
POSITION : GENERAL ASSISTANT
DURATION : 08/02/2019 TO 14/11/2021
3.3. NAME OF COMPANY : CITY OF TSHWANE
NAME OF DEPARTMENT : ELECTRICITY DIVISION
POSITION : ARTISAN IN TRAINING
DURATION : 01/11/2015 TO 01/11/2017
3.2 DUTIES
3.2.1. JOINING AND LAYING CABLES OF LV AND MV CABLES
HT cables size (70mm2, 150mm2 ) three core
Installation of LT cables (16mm2,25mm2, 35mm2)four core and three core
Installation of concentric cable (air deck 10mm2 and 16mm2)
Installation of termination and End joint cables
Inspection and maintenance of substation and mini substation
Inspection and maintenance of RM6 and ODS(outdoor substation)
3.2.2. REPAIR AND MAINTANANCE OF STREETLIGHT
Installation of streetlight
Replacement of bulbs and luminaires of head fitting
Installation of day-night switches (70W and 250W0)
3.2.3. NEW INSTALLATION AND MAINTANANCE OF METERS (SINGLE PHASE AND 3 PHASE METER AND MAXIMUM DEMAND))
Installation of ready board to consumers
Installation of pole boxes meters (3 ways, 6 ways,12 ways)
Installation of conventional and prepaid meters
Inspection of kiosk
Checking of loose connection
Checking illegal connections on the meter .e.g tampering
3.2.4. INSPECTIONS OF OVERHEAD LINES AND NETWORK (LV and MV)
Dressing of overhead line poles
Phase colours are correct
Stringing of overhead lines
Inspection of trees touching the overhead lines
3.2.5. ALL SWITCHING PROCEDURES MUST BE DONE IN A SEQUENCE NAMELY
Switching operation
Earthing
Safety testing
Link operation
Megger test 11KV cables
4.REFFERENCES
4.1 NAME : JAAN
POSITION : REGION MANGER
CONTACT : 064-*******
4.2 NAME : MONICA RAPETA
POSITION : MANAGER
CONTACT
4.3 NAME : MR S MPFOLO
POSITION : supervisor
CONTACT : 082-*******