Post Job Free

Resume

Sign in

Electrical Engineer Qc

Location:
Al Dafna, Qatar
Salary:
10000
Posted:
December 02, 2022

Contact this candidate

Resume:

CURRICULAM VITAE

RAJENDRA VENKATESH SERWEGAR

OBJECTIVE: To work with an organization that offers a long-term relationship with opportunities that utilized my set skills. Also want to acquire new skills for satisfying careers. I like to be a part of the team and to make my contributions that help to achieve the company’s objectives.

Profession: QA/QC Engineer- Electrical.

Professional Qualification: Diploma in Electrical Engineering. Computer Literacy: AutoCAD 2004, 2006 & 2007.

MS-Office (Word, Excel, Power point)

Other Achievement: LEAD AUDITOR ISO: 9001 - 2015 – (IRCA-UK). Present Address: Vector Electro-Mechanical Co. WLL Doha. Doha (Qatar)

Professional Experience: (+15 YEARS)

Present Worked History:

Working with Vector Electro-Mechanical Co. WLL Doha as a “QA/QC Engineer- Electrical for their ongoing - QATAR ARMED FORCES Dukhan Project, Doha, Qatar since Feb 2022 to till date. Duties and Responsibilities:

Preparing the Installation Inspection Request, Material Inspection Request and Testing and commissioning inspection request with attaching approved drawings & other Approved supporting documents.

Doing Internal Inspection before offering Inspection request & Material request to the Consultant & ensuring all electrical installation is done as per approved drawings

& other approved supporting documents before offering inspection to the consultant.

Monitoring the daily routine quality of site installation and advising to the construction team to take a Necessary Action.

To avoid any Non-Conformity/Observation Reports from the Consultant informing to the concerned site People through raising internal non-conformity report and conduct a quality of training weekly to site team make MEP Team to understand the value of the quality works.

Solving the site related QA/QC technical and documents issues with consultant/Main contractor.

Supervise, Monitor Installation of HV/LV Cables & Cable Testing such as (Continuity Test & Insulation Resistance Test), Cable tray, Lighting, Distribution control panel, all electrical equipment, Earthing, Lightning protection Grounding system, Fire alarm, public address, clock and SMATV Systems etc.

Issue the internal punch/Snag list to the construction team prior to consultant Snag/Punch inspection for the outstanding works and prepare the compliance statement for the client punch/snag list.

Responsible for all Electrical & ELV inspections related to installations, testing, Commissioning etc.

To conduct inspection of all ongoing activities for electrical installations.

To conduct inspections for all electrical material deliveries.

To attend all Electrical & ELV System inspection with consultant/QCDD/ Kahramaa representatives.

Daily follow-up with procurement team/supplier/manufacturer for the materials supporting documents/material approved submittals etc... For the inspections.

Prepare method statements and ITPs in coordination with QA/QC senior engineers and Project engineers.

Prepare daily QA/QC report regarding inspections, material, non-conformances etc.

Check the drawings and documents used at site for approvals and compliance with Project Requirements.

Prepare weekly surveillance reports, non-conformance reports and verification of corrective actions.

To Ensure that all works are carried out as per the approved method statements and drawings.

Coordinate with main contractor civil team and mechanical team for inspection related Activities.

Ensure that all equipment used are calibrated and with valid certificates.

Preparing of the final handing over documents such as Hand over documents, testing and commissioning reports etc.

Coordination with company representatives. Regarding planning & Design review.

Preparation and Coordination in the implementation of the QA/QC programs.

Attending site weekly Construction meeting/Progress meeting with management and highlighting quality related concerns.

Previous Worked History:

Working with Parsons International Limited as a “Inspector Electrical for their ongoing Doha SEEF Lusail Development Project, Doha, Qatar since July 2019 to November 2021. Duties and Responsibilities:

Assisting the Electrical Engineer/Construction manager/QA/QC Managers in performing the contractual duties on site.

Review the ITP, MST, Shop drawings etc. assigned by the Electrical Engineer, preparing comment sheet for the submittals, and provide the technical feedback to the Engineers.

Ensure at site performance of the work in strict accordance with the Project plans and specifications and as per local authority.

Daily verify the submittal, IRs, MIRs received through Aconex though email from the main contractor to respond immediately as per schedule.

Daily monitoring the contractors works at site & Communicating with the Main contractor QA/QC, Construction engineers & Managers regarding inspections, Progress, and quality of works to follow the Project specification, design, approved shop drawings, MST, ITP, QCS, QCDD, NFPA etc

Attending weekly quality & Progress site walk with Client/Main contractor and management.

Issue NCR, Observation report, to the main contractor if violated the Projects standards and project specifications Etc.

For closing NCR, Observation report etc. to verify at site for closure.

Attending Installation inspection, Material inspection and testing and commissioning inspection with main contractor and giving approvals & rejections based on the approved documents, Proper test reports and procedures, completed and in- complete installations, violating ITP, MST, QCS, Kahramma & Project quality procedures etc. and respond through Aconex for approvals & Rejections.

Issue the punch list/Snag list to the main contractors after completion of all testing and commissioning inspections and for closure of the snag/Punch list re-verify after rectification by the main contractor.

Be fair and firm in dealings with the Contractor. Consider alternatives and consequences carefully before making decisions.

Issue instructions to the Foreman in Charge of the work and do not argue with the Contractor or his representatives.

Inspect all electrical & ELV works and ensure that installation activities comply with contractual obligations and quality control standards.

Follow-up with the contractor and support in coordinating with the utility authority regarding connections whenever required.

Receive material inspection requests (MIR) from contractor, inspect electrical & ELV materials delivered at site and report on quantity and technical compliance and sign off requests.

Prepare/complete the necessary documentation prior to inspection of the Works and process accordingly following completion of the inspection.

Ensure that safety critical aspects of the project are identified and actively addressed.

Ensures that the project quality control procedures are used for the construction supervision works and monitors it for improvement.

Assist Electrical engineer & review the as built drawings, Hand overs documents, O & M to hand over the project successfully.

Previous Worked History:

• Working with Mitsubishi Heavy Industries. Doha (Qatar) as a “Quality Inspector Electrical (MEP, ENERGY, TVS & PSD Power, Electrical containment and ELV System Installation inspection and All Electrical & ELV System Material inspection) for their ongoing Doha metro project at Doha since April’ 2017 to July 2019. Duties and Responsibilities:

Preparing the Installation Inspection Request, Material Inspection Request and Testing and commissioning inspection request with attaching approved drawings & other Approved supporting documents.

Monitoring the daily routine quality of site installation and advising to the construction team to take a Necessary Action.

To avoid any Non-Conformity/Observation Reports from the Consultant informing to the concerned site People through raising internal non-conformity report and conduct a quality of training weekly to site team make MEP Team to understand the value of the quality works.

Solving the site related QA/QC technical and documents issues with consultant.

Monitor Installation of HV/LV Cables & Cable Testing such as (Continuity Test & Insulation Resistance Test), Cable tray, Lighting, Distribution control panel, all electrical equipment, Earthing, Lightning protection Grounding system, etc.

Issue the internal punch/Snag list to the construction team prior to consultant Snag/Punch inspection for the outstanding works and prepare the compliance statement for the client punch/snag list.

Responsible for all Electrical & ELV inspections related to installations, testing, Commissioning etc.

To conduct inspection of all ongoing activities for electrical installations.

To conduct inspections for all electrical material deliveries.

To attend all Electrical & ELV System inspection with consultant/QCDD/ Kahramaa representatives.

Daily follow-up with procurement team/supplier/manufacturer for the materials supporting documents/material approved submittals etc... For the inspections.

Prepare method statements and ITPs in coordination with QA/QC senior engineers and Project engineers.

Prepare daily QA/QC report regarding inspections, material, non-conformances etc.

Check the drawings and documents used at site for approvals and compliance with Project Requirements.

Prepare weekly surveillance reports, non-conformance reports and verification of corrective actions.

To Ensure that all works are carried out as per the approved method statements and drawings.

Coordinate with main contractor civil team and mechanical team for inspection related Activities.

Ensure that all equipment used are calibrated and with valid certificates.

Preparing of the final handing over documents such as Hand over documents, testing and commissioning reports etc.

Coordination with company representatives. Regarding planning & Design review.

Preparation and Coordination in the implementation of the QA/QC programs.

Attending site weekly Construction meeting/Progress meeting with management and highlighting quality related concerns.

Previous Worked History:

• Working with ETA Star Engineering and Contracting W.L.L. Doha (Qatar) as a “QA/QC Electrical Inspector/Material Inspector (Power, Electrical containment and ELV System Installation inspection and All Electrical & ELV System Material inspection) for their ongoing MSHEIREB DOHA DOWNTOWN project at Doha since February’ 2015 to April 2017.

Duties and Responsibilities:

Preparing the CRFI/MIR for the installation and materials with approved drawings & supporting documents.

Doing Internal Inspection before offering CRFI/MIR to the Consultant /main contractor & ensuring all electrical installation is done as per approved drawings & supporting Documents.

To avoid any Non-Conformity Report from the consultant, do Internal Quality site walk every day and advising the construction team if find any non-conformity installation at site.

Solving the site related technical/documents issues with consultant.

Tracking all Installation inspections and informing construction to raise highlight drawings for the completed installation to proceed with internal inspection as well consultant inspection.

Supervise and Monitor Installation of Cable, Cable tray, Lighting, Distribution control panel, all electrical equipment and Grounding & ELV system, etc.

Monitor quality activities of supervision contractor and construction Contractors.

Responsible for equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning.

Issue the punch list to construction team for the outstanding works.

Responsible for all Electrical & ELV inspections related to installations, testing, Commissioning etc.

To conduct inspection of all ongoing activities for electrical, ELV installations.

To conduct inspections for all electrical, ELV installation material deliveries

To attend all Electrical & ELV System inspection with client/contractor representatives.

Daily follow-up with procurement team/supplier/manufacturer for the materials supporting documents/material approved submittals etc... For the inspections.

To submit inspection requests in coordination with concerned site/project engineers.

Prepare method statements and ITPs in coordination with QA/QC senior engineers and Project engineers.

Prepare daily QA/QC report regarding inspections, material, non conformances etc.

Check the drawings and documents used at site for approvals and compliance with Project Requirements.

Prepare weekly surveillance reports, non-conformance reports and verification of corrective actions.

Ensure that all work is carried out as per the approved method statements and drawings.

Coordinate with main contractor civil team and our mechanical team for inspection related Activities.

Ensure that all equipment used is calibrated and with valid certificates.

Assist the QA/QC senior engineers in preparation of the final handing over documents such as HO&M documents, testing and commissioning reports etc.

Preparing of testing and commissioning method statements in coordination with Vendors, Senior QA/QC Engineers and project engineers.

Routine inspection for the Electrical work activities and Inspection of incoming Client materials.

Inspection installation of HV/LV Cables & Cable Testing such as (Continuity Test & Insulation Resistance Test).

Compiling of design standards.

Coordination with company main contractor/sub cons representatives.

Routine inspection for the Electrical work activities and Inspection of incoming Client materials.

To attend all electrical inspections with client/main contractor representatives.

Preparation and Coordination in the implementation of the QA/QC programs. Previous Worked History:

• Working with BECHTEL-ENKA-BEC Consortium. Muscat (Oman) as a “MEP QA/QC Electrical Inspector (Power, Electrical containment and ELV System Installation inspection) for their ongoing Airport MC3 project at Muscat since July’ 2012 to Feb 2015.

Duties and Responsibilities:

Preparing and obtaining approval for Project Quality Documents such as Project Quality Plan, Quality Control Procedures, Inspection Test Plans (I.T.P.), in accordance with Project / Client Specifications, reviewing all quality related activities & preparing all Quality related reports on site, Preparing the Sub Contractor appraisal report for the Month, preparing Material receiving report, coordinating with execution team for Project quality system, Issue the NCR for any nonconformance, review third laboratory Inspection, ensuring all the inspection reports is correct.

Review IFC drawings, technical specifications and inspect electrical systems and Components to high specifications. Supervise installation test (FAT and SAT) of power Distribution panels, motor control center panels, ELV equipment.

Performing direct activities to ensure that construction, installation, and operational Testing conforms to functional specifications, codes, standards and customer Requirements. Preparation for commissioning and turnover process. Previous Worked History:

• Worked with M/s Shamel International Industries Trading & Contracting L.L.C. Muscat

(Oman) as a “MEP Site Supervisor (Electrical & Plumbing) for their ongoing CBFS project at Bousher since Jan’ 2009 to June 2012.

Duties and Responsibilities:

Construction activities related to Installation of containment which includes PVC conduits, GI Conduits, Trays & Trunkings. As per IEC standards and approved drawings.

Cable pulling, Dressing, Wiring & Termination activities as per Cable & DB schedule.

DB, MCC Panels, MSB panels, & Bus ducts installation, Testing & commissioning.

Installation of Earthling strips &n electrode in co-ordination with earthling layout drawings.

Installation of Plumbing work (Cold water installation with copper and hpvc pipes, Drainage And Soil installation with upvc pipes etc.

Supervision of Sanitary ware and fittings and accessories.

Supervision of Fire Fighting system with Fire Hose Reel and Dry Riser system etc.

Preparation of progressive report, BOQ’s, Bills etc.

Detail design and supervision of interior works, Planning Resources, material and lab our Management.

Preparation of Man- hours & respective billings for labor payments.

Site supervision and follow up of construction activities by strictly adhering to all safety and Quality standards.

Previous Worked History:

• Worked as a Electrical Site Engineer with Sree Uma Shankar Electrical Pvt.Ltd. Bangalore Karnataka from September 2006 to Dec 2009.

Duties and Responsibilities:

Construction activities related to Installation of containment which includes PVC conduits, GI Conduits, Trays & Trunkings. As per IEC standards and approved drawings.

Cable pulling, Dressing, Wiring & Termination activities as per Cable & DB schedule.

DB, MCC Panels, MSB panels, & Bus ducts installation, Testing & commissioning.

Installation of Earthling strips &n electrode in co-ordination with earthling layout drawings Preparing the shop drawings, Co-ordinates ceiling layout etc. with site co-ordination and Submitting the same for the consultant approval.

Estimating the quantities of material required for the project and preparing the MR for the Same and daily follow-up with the suppliers for timely delivery of the material at the site.

Preparing the DB Schedule, MAS Schedule and Variation and submitting the same for Consultant approval.

Preparing the daily activity schedule based on the schedule given by the Main contractor And executes the work accordingly.

Preparing the monthly invoice and certifying it with main contractor Project Engineer.

Preparing the Inspection request and Test certificates and interact with the consultant for The inspection (Ceiling and Screeding work).

Academic Qualification : SSLC, PUC

Personal Details:

Date of birth : 22th Feb’ 1987

Gender : Male

Marital status : Married

Nationality : Indian

Language Known : English, Hindi, Arabic, Malayalam, Tamil, kannada & Tulu.

Email ID : adttus@r.postjobfree.com

Contact No. : +974********

Permanent Address S/O Venkatesh

Post/Village: - Uppoor Heribettu

Distt: Taluk: - Udupi

Mob: 91-872*******

Passport Details:

Passport No: R8300501

Date of expiry: 24/01/2028

I hereby declare that all information given above are true to the best of my knowledge And belief.

Date: 16/11/2022

Place: Doha (Qatar). Rajendra V.S



Contact this candidate