THEIVELLI MOHAMED KABIR
Electrical Superintendent,Electrical Engineer,
Electrical Inspector, Electrical QC Engineer,
Commissioning Engineer
CAREER OBJECTIVES
To be engage in reputable work that will
provide good opportunities, for integration
of skills and to occupy a challenging
position, wherein I can execute my
knowledge and to apply all the things I’ve
learned and experienced.
CONTACT
PHONE:
EMAIL:*************@*****.***
AREAS OF EXPERIENCE
Experience in Electrical Site Engineer,
Electrical Inspector, Quality Control
(QC), Commissioning Engineer
(Electrical)
Experienced in LV, ELV Installation
Supervision and Inspection of Electrical
works.
Experienced Sub-contractor
monitoring, Manpower program,
Material arrangements work progress,
Design engineering, MEP Coordination,
As build updates, Snagging closeout
Start Up of all Electrical, HVAC System,
Testing and Commissioning of
Electrical, System and getting approval
from the Consultant.
Preparation reports and other
technical documents.
Knowledgeable in MS- Office, Internet
explorer, Auto CAD.
Self-Motivation
Communication skills
EDUCATIONAL QUALIFICATION
BACHELOR OF TECHNOLOGY (B.TECH) IN ELECTRICAL
ENGINEERING UNIVERSITY OF JAMIA (2000-2003)
APPROVED FROM HIGHER EDUCATION ABU DHABI
PERSONAL INFORMATION
Date of Birth: May 21, 1969
Nationality: Indian
Personality: Energetic person with strong work ethics, flexible, friendly and honest.
Language: English (Good), Arabic (Basic)
WORK EXPERIENCE
Alemco Engineering Contracting
Electrical Superintendent
24/6/2021 to 25/4/2022
Project Handled:
One Zabeel Tower – Dubai
Duties and Responsibilities:
Generally responsible for implementations and monitoring of all electrical related work at site
Interprets construction drawing and studies the contract documents and applicable standards or specifications prior to execution of any jobs,
Coordinates with clients/ Consultant’s representative for any site instructions and inspection of works,
Assign targets for accomplishments and ensure targets are met on daily basis on all electrical group at site,
Submits the daily reports, inspection request, estimates and all applicable monitoring reports on regular basis or as required,
Ensures that all works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards,
Ensures that all site works are done according to all applicable standards,
Performs other related duties as maybe required by the Asst. Construction Manager.
Laing O Rourke Middle East Holding Dubai
Electrical Engineer
April 2007 - Nov 2020 (13 Years 8 Month)
Project handled:
UAE
ELECTRICALTECHNOLOGY NATIONAL TECHNICAL
CERTIFICATE INSTITUTE OF TECHNICAL EDUCATION
SINGAPORE 1996-1998
DIPLOMA IN ELECTRICAL ENGINEERING 1987-1989
REFERENCES
Furnish upon request.
EXPO 2020 Al Wasl Rove Hotel Project.
Deira City Center Aloft Hotel Project
Khazna Data Center Abu Dhabi, Dubai Pod 4, 5, 6
Atlantis Water Park
Motion Gate (Dubai Parks)
Emirates Golf Club (EGC)
Jumaira residential Project
Al Mansour villa (Al khawannej)
Al Raha beech development Al Bandar, Al Zeina (Residential Project)
Job Description and Responsibilities:
Electrical Engineer
Detail review of the IFC drawings for any design pitfalls and providing alternative solutions, ensuring strict compliance to uptime and operator standards for operation.
Coordination with other services managing sub-contractor for various disciplines such as MV/LV and ELV.
Coordinating with Sub-contractors for day to site activities and progress
Responsible for shop drawings, approval material submission and approvals.
Responsible for execution and supervision of all electrical installation.
Ensuring the availability of the type of quantities of the materials required in site to confirm to the specification, ensuring commodity received complies with quality standards.
Preparation of risk assessment method statement and visual task sheets for particular tasks as per site HSE Polices.
Responsible for handling the test and commissioning of all electrical equipment’s and cables with 3rd party special commissioning team.
Responsible for Managing logout tag out LOTO Procedure for entire electrical testing and commissioning activities.
Providing adequate training for the operatives including daily activity briefing and safety instructions.
Responsible for Managing permit system PTW for all day activities including installation and test and commissioning.
Coordinating the test and commissioning activities with each equipment and vendor and commissioning manager.
In-charge for internal / final inspection for MV, LV, ELV and Special System submitted by sub-contractor.
Coordinating with commissioning manager and facilitate site for demonstration of the requirements and redundancies of critical loads uptime certification.
Coordinate to the subcontractor, site Engineers, and Consultant for some necessary issue.
Conduct surveillance inspection and Material Inspection Request (MIR) to be implemented as per ITP, Company specification and international standard.
Review and verification of Authorization to Proceed (ATP) and Padlock Release Form (PRF) submitted by sub-contractor prior to submit to clients for approval for all Electrical System.
Create tracker for all installation of Electrical System and make some necessary report submitted to MEP Leader..
Assist Room Completion.
As build drawing, Load schedule updates.
Conduct visual inspection of Distribution Board (DB) such as Final Distribution Board (FDB) and Sub Main Distribution Board (SMDB)
Ensure that all the components installed inside the Distribution Board are matching the Load Schedule and the Panel Board Diagram.
Conduct Loop Impedance Residual Current Device (RCD) trip tests for the Incomer and Outgoing circuits to ensure the installed protective devices are working properly.
Lead pre-commissioning team to verify the electrical installation prior to submission to consultant inspections.
Attend inspection with the consultant for work inspection and submission for work inspection and Commissioning Inspection Request KURIHARA KOGYO SINGAPORE Branch
September 1, 1990 – April 30, 1995
Project handled:
Kranji, Seletar water reclamation plant (MOE)
Schering plough Pharmaceuticals bulk plant
United microtranics wafer plant Sumitomo chemical system
Smith K line beecham Amoxyln plant
Singapore Gas plant
Job Description and Responsibilities:
QC Electrical Inspector
Executes the specific inspection on materials equipment and construction/installation activities on site.
Perform visual inspection, dimensional test, check rating and material for connection.
Perform punch-listing operations.
Update as built drawings.
Performs test of continuity, insulation resistance.
Check installation of instruments.
Performs functional instruments.
Performs test communication functionalities.
Verify special processes and relevant workers qualifications.
Witness the test, controls and inspections carried out.
Check conformity with the Quality Control Plan, obtain the relevant documentation.
Check procedures and equipment to be used in tests.
Manage documents certifying tests, controls and inspections.
Ensure the correct implementation of the approved inspection Test Plan.
Scheduling and coordinating work to tight deadlines.
Creating and carrying out test procedures.
Investigating problems and diagnosing and repairing faults.
Troubleshooting.
Liaising with installation/project engineers.
Supervising engineering and technical staff.
Writing reports and documentation.
Provide technical support.
Ensuring safe work conditions.
Panta Lesco Malta Eastern Europe
September 1 2005 – August 30, 2006
Project handled:
Mater dei hospital project.
Radisson hotel
Job Description and Responsibilities:
QC Inspector
Executes the specific inspection on materials equipment and construction.
Issues the relevant quality records and, when necessary writes and sends to QC Supervisor non-conformances reports.
Checks cable laying and cable identification.
Performs all relevant loop checks.
Update as built drawings.
Perform punch-listing operations.
Check power transformers, switchboards, accumulator battery, sockets outlet and lighting systems.
Perform visual inspection, dimensional tests, checks rating and materials for connection.
Performs tests of continuity, insulation resistance.
Calibrates safety valves.
Checks installation of instruments.