Post Job Free

Resume

Sign in

Plant Operations Manager/Director

Location:
Dallas, TX
Salary:
100000 - 125000
Posted:
November 20, 2022

Contact this candidate

Resume:

Name - Happy Wilson Abali

Sex - Male

Permanent Home Address - 2502 Walnut Hill Cir., Unit #117

Arlington, TX 76006

Phone Number - 682-***-****

E-mail Address - adtmid@r.postjobfree.com

Institutions Attended

1.University of Southwestern Louisiana USA (Now University of Louisiana at Lafayette) 1982-1984

2.University of Southern Mississippi USA 1985-1986

3.Institute of Petroleum Studies, University of Port Harcourt 2014 – 2015

4.Institute of Petroleum Studies, University of Port Harcourt 2015 – 2018

Academic Qualifications

1.Bachelor of Science - 17th December 1984

2.Master of Science - 21st December 2016

3.Doctor of Philosophy - 22nd Jan 2019

Membership of Learned Professional Societies and License

1.Certified Environmental Professional of National Registry for Environmental Professional NREP-USA - 2022

2.International Statistical Engineering Association (USA) – 2021

Work Experience

1. Position: Lecturer II

Company: University of Port Harcourt, Nigeria

Date: January 2019 to August 2022

Reason for leaving

Incessant strike action/no work for over 6months.

Responsibilities

Facilities Management

Teaching Environmental Health & Safety to undergraduates

Teaching Air Pollution, EIA and Water Resources and Waste Management to Master’s class.

2.Position: Operations Manager (Fulltime)

Company: Wacco Tech Ltd, Port Harcourt, Nigeria

Date: Jan 2000 – August 2014

Reasons for leaving:

No ore to work with due to insecurity in the country especially at the quarries

Harsh economic/political policies that shut Wacco Tech.

Responsibilities:

Assembly of machines, mills, crushers and electromechanical parts.

Installation of all production equipment including plant integrity

Production operation planning (production and maintenance) and execution

Acquisition of new asset for optimization

Co-ordinating Barites, limestone and Bentonite quarries

budgeting, directing and supervision of all operations

Personnel training and mentoring.

Flowlines and pipelines laying. Several lengths (40’ -15 miles) and diameter sizes (4”- 24”).

Installations of several flare auto ignition systems, flare repairs and rebuilding, including bund wall and saver pits construction.

Major Achievement:

Installed a complete grinding journal mill and its accessories and ran the plant producing limestone, gypsum, barites, bentonite and kaolin

Employed all its staff, trained (including safety training) and mentored them. Made the 850MT/month capacity plant to turn out 1000MT/month within same hours of operation within two years.

Increased food production because I made the Shift target to be minimum shift output which increased overall production output.

3.Position: Plant Manager (Call off Contract)

Company: Ana Industries Ltd, Port Harcourt, Nigeria

Date: May 1997 – Dec 1999

Reason for leaving: To install Wacco plant with shares

Responsibilities:

Installation of all equipment for limestone, barite and bentonite processing including quarries co-ordination

Production operation planning (maintenance production) including integrity

Acquisition of new asset for optimization

Directing and supervision of operations

Personnel training and mentoring.

Major Achievement:

Installed a complete grinding mill and its accessories and ran the plant for 2yrs.

Employed all its staff, trained (including safety training) and mentored them.

4.Position: Plant Services Supervisor (Call Off Contract)

Company: Schlumberger Dowell Port Harcourt, Nigeria

Date: Nov 1995 – April 1997.

Reason for leaving:

Job took so much of my time. No time to spend with my new wife

Taking up the challenge of installing a complete plant for Ana Industries.

Responsibilities:

Installed Raymond Mill 54” grinding plant and operated/maintained the production of barite, bentonite and limestone including quarries co-ordination

Production operation planning (maintenance and production) including plant integrity

Acquisition of new assets for optimization

directing and supervision of operations

Personnel training and mentoring.

Major Achievement:

Rehabilitation of Mikropul dust collector

Rehabilitating Flash Dryer that was never used for production since the plant was installed.

Installed a jaw crusher and ore conveying systems for aggregate processing.

5.Position: Plant Engineer (Fulltime)

Company: M-I Drilling Fluids Co, Port Harcourt, Nigeria

Date: July 1987 – Oct 1995

Reason for leaving: more money

Responsibilities

Maintenance of both Raymond 54” 4 roller Mill, overhauled mill by replacing bull ring and rebuild journals three times in the year (for barite and limestone including quarries co-ordination).

Maintained Williams 4” 4 roller Mill for Bentonite and Kaolin and overhauled mill at least once in year by replacing bull ring and rebuilding journals

OBM (oil base mud) and other Minerals Plant Production construction and commissioning

Personnel training and mentoring

Major Achievement:

Participated in the dismantling of Warri plant and installed it in Port Harcourt to double Port Harcourt plant hourly production with an additional three staff, instead of two different plants with a high operation cost.

Participated in the construction of an Oil base mud (OBM) plant for a new line of product.

Yearly/routine mills overhaul

Skills

Continuous improvement techniques

Lean manufacturing

Plant operations planning (production/maintenance) & control

Training and mentoring

Team work playing

Inventory management

Facility management

QA/QC management

Occupational health, safety & environment

Conflict management & resolution

MS Office

Names and Addresses

1. Hyacinth Azumah 682-***-****

DFW Logistics

2.Bobby Abali 365-***-****

Facility Depart, McMaster University Hamilton, ON

3.Miss Comfort Garricks +234 803-***-****

Managing Director, Wacco Tech Nig Ltd

RESUME



Contact this candidate