MEL OWENS
LawrenceVille Ga.*****
Ccll 404-***-****
Email Melwns @ Yahoo.com
EXPERIENCE
I P VIOSION in Fl. 09/18/2021 Access Controll = Installing Verkada Panels, Electrical door Locks, Door Strikes, Card Reader, Contacts with Fuses, Emergency push to exit, Motion to release, Mag.Locks with 24 vote Power Supply, Verkada Cameras( in door and out door) running cat 6 cable, Operating Boom Lift 80’.
Outsource Staffing in Atl Ga. 07/01/2021 to 09/17/201.= Install cat 6 cable, fiber connectors, building Patch Panel Cages, Installing Palels, at Switch Lab in Cobb County. Amazon at ware house, install cat 6, installed 90” TV, install Direct TV Satellite Dish retain signal install with RJ59 cable to support dish. Operating Boom Lift to install Satellite Dish.
Robert Half temp in atl.Ga. Contract work 11/05/2019 to 03/31/2020: Adtack, In a apartment complex, install Cable cat 5,cat 6, I.D.F. cabnets,Cameras, APS, Speakers, Coax cable RG 11 and RG 6 termination. Dressing Trunk. Access Control Doors.
Site Pro in Texas 01/18/2019 to 07/13/19 Data room Build Out Contract workt. Install V.C.M., Ladder racks, Cable Basket Trays. Install Fiber,Stand Off Brackets, Severs,Patch Pannels,Switchs.
South Eastern Networking Soiution in Braselton Ga. 05/15/18 to 12/30/18. Contract work -Field Service. Install and repair N.C.R. P.O.S. Devices in Popeye’s, Burger King, and Crystal’s Restaurents in the Atlanta area.
Motis/ Material In Motion in Atl. Ga. 01/18/2018 to 05/01/2018 Contract work =Rack and Stack Cableing in a Net Work Environment. Testing and repairing Data Racks using LENOX commands. Using certain commands to navigate system test and test specific units, uploading images on CPU’S and repairing Optics.
Attenus Technology in Atl. Ga. 09/18/17 to 12/31/2017 Contract work, Field Service Technician. Using Lab top tuning up switches,Performing cut overs,,running cat 5&6 cable, termination 45&11 connectors. Mounting TVS in commercial invermonts. Repairing cash registers, building patch bays, dressing in cables. Replacing Security Cameras, repair Aps.
Clearview networks in Atl. Ga. 6/5/17 to 8/10/17 Contract work – Install Dish networks. Hopper 1,2,3, Joey 1,2, Super Joerys. International dishs. Head In
DW Satilites in Houston Tx. 6/16 – 8/16 Contract work - Install Direct TV in homes, Wireless install Pole mounts 2 K receivers with reverse L.M.B.
MCA COMMUNICATIONS 07/11/2014 to 06/05/2016 in Houston Tx.
Lead Tech, Fiber Splicing, Installing patch bays,Trouble shooting Network Cable system repairing error. Buuilding closet,dressing cable. Installing Servers running config. Voice and data installation MDF,IDF installation. Build cages install server running config. Cat 6 & Fiber termination Repair and service. 50 pair termination. 110, 66.AV Sound Speakers & Projectors.Reading Prints completeing Surveys.
Digital Satillite in Houston Tx. 07/13 to 01/14 - Satitllite installation DirecTV. Install 18", 18/20' swmline.Cabling. Pole mount.
.
Select Source in Atl. Ga. 2 –10 to 3– 10 Contract work - Installing and dressing network cable.110 blocks punch down.
Installing wall jacks in local schools.
ADECCO in Atl.Ga. 07 - 09 to 11- 09] Contract work - Supporting H-P Data center satellite blv. Installing server”s making connection between server’s and switch’s installing hard drive ‘s making cable’s dressing patch bay’s trouble shooting Network, rack and stake.
Information Tech Resources Inc. (11-07 to 2-08) Contract work.
Assign to Atlanta Pubic Schools.Tech support, mappoing
drives downloading applacations creating power users to logon to the domain. Repairing desktop and laptops.
(2-06 to 3-07) A.T.S. Assign to Pam Ame Sat. Lab tech installing satellite divice”s building cable and connectors, installing cableing in racks. Plus dressing.
(11-05 to 12-05 Communication Cabling Cat 6 & Cat 5 install 1-10 block punch down, cable dressing.
(5-05 to 10-05) Georgia Cable responsible for installing CAT 6 and CAT 5 fiber optic cable, terminate and test connections.
(2-05 to 5-05) A.T.S. Assign to Data Path satellite communication integration lab. Built cables
From scratch S.M.A. N- Type f- connector’s install Invertors, A.C.U. (Antenna Control Unit), P.D.U. (Power Distribution Unit) Spectrum Analyzer’s
Power indicators’s and wire all units according to stigmatic. Kept up with inventory to keep Production going.
4-00 to 3-02 Arris Interactive
Testing the PACKET PORT. Making Cat -5 & hard line connections, cross and straight- though
patch cables. Building multi input output patch bays, installing backboards coaxial & Cat -5 cable.
Building multi level patch bay networks for voice / data audio & visual.
9-99 - 11-99 Southern Communication
install Nortel Norstar 0132 troubleshooting from the De marc. Voice / mail.
Inter - Tel Accent & Access. ISDN, add move & change Norstar. Trouble-shoot and repair
Executone ACD. Installing T-1 cards setting config to communicate with service provider.
3-99 - 9-99 Williams Communication
500 Chastain Center Boulevard, Suite 505
Move, add, and change. Trouble-shoot Norstar ICS and Voicemail. Trunk and station cards. Install
T-I,,DID E&M Cards and configured. Config station for ports, install cross connects. Reset
Password and greeting for voicemail set relocation changing DN's, some Meridian I option 11,21.
07-96 to 09-96 IBM Repaired personal computers and serversAS1400.320 Value Point, Laptops. Loaded information from servers installing OS12.
EDUCATION
TEXAS SOUTHERN UNIVERSITY
Maior: SCHOOL OF ELECTRONIC TECHNOLOGY
MICRO LEARNING CENTER A+, WILLIAMS COMM NORTEL NORSTAR CERTIFIED
REFERENCES.Available upon reques
Will Thornton IP VISION cell 520-***-****
Glen Adtack supervisor cell 843-***-****
Mattthew Site Pro cell 913-***-****
Clearview networks Mr. niyi 770-***-****
Jose Stelly MCA (832) -906 -9382
Lizabeth H Lockard A.T.S. (770) -595-3514