CURRICULAM VITAE
SIVAKUMAR 741-***-****
adtbny@r.postjobfree.com
Navalpattu, Phase-2, Trichy
Ob j ectiv e
Intend to build a career with leading corporate of hi-tech environment with committed &dedicated people, which will help me to explore myself fully and realize my potential. E D U C A T IO N S K IL L S CERTIFICATIONS
B.E Electrical & Electronics
Engineering
ANNA UNIVERSITY
2013 – 2016
Diploma in Electrical &
Electronics Engg
Government Polytechnic College
2010 – 2013
AutoCAD
Revit MEP
Troubleshooting
Problem solving
Accuracy and attention to detail
AutoCAD Certification
Revit MEP Certification
Pro fes s io n al Ex p erien ce
2016-2021 5+Years experience of Operation & Maintenance & work experience in 33kV, 11kV, 6.6 kV & 415 V Transformers, HV/MV/LV Switchgears, Starter panels etc. and related systems.
Work experience in Costing & designing of LT panels
(PCC, MCC, APFC, AMF, SYNCHRONIZATION, RAISING MAINS,DBs)
Excellent knowledge in designing of switchgear panels, starter panels and schematic circuits.
Good knowledge of understand the customer requirements, Planning of Projects, Preparing BOM & BOQ Erection and Testing Of LT Panel
Both practical as well as theoretical knowledge in using Different Electrical and electronic Measuring and testing Instruments.
Executing engineering projects from inception to success and managing a site team of Engineers, supervisors and technicians.
Accuracy, responsibility and accountability – Excellent attention to details and well organized.
E L E C T R I C A L E N G I N E E R
SKILLS:-
Trouble shooting and Operation & Maintenance of following equipments
Transformer
Relay Testing
Motor starters
Switchgears (GIS,VCB,AIS,MCCB)
Isolator
Costing & Design
Selection of the material for Electrical purpose. CURRENT WORK EXPERIENCE:-
Plant : Nagarnar Iron & Steel Plant (NMDC), 3.0 MTPA at Jagdalpur, Chhattisgarh.
Organization : NMDC under POWER MECH PROJECTS LIMITED.
Designation : Operation & Maintenance Engineer.
Span : Oct 2020 To Present
ROLES AND RESPONSBLITES: -
Perform Maintenance of all Electrical equipments & switch gear panels upto 220KV.
Operation and Maintenance of Plant Power Distribution System, Substation Equipment.
Perform relay testing of all type of electromagnetic & numerical relays.
Preparing indents as per power plant requirement of every equipments.
SAP Database preparation for electrical equipments.
Spare materials purchasing for proprietary and non-proprietary, GEM, indent preparation.
Inspecting and auditing in-process and completed work, to ensure work meets sow and quality standards.
Trouble shooting electrical issues with expected timings. PREVIOUS WORK EXPERIENCE:-
Organization : PRECISION SYSTEM CONTROL, NEW DELHI
Designation : Costing & Design Engineer
Span : Jan-2019 TO Oct-2020
PRECISION SYSTEM CONTROL is LT panel manufacturer as per CPWD specifications. Our products are mostly using in Governmental agencies and are used widely in industrial and commercial solutions
Organization : KILBURN POWER GEAR LTD, Chennai.
Designation : Junior Engineer
Span : Oct 2016 –Jan 2019
KILBURN POWER GEAR LTD is dealing with needs of various sectors such as Collieries, Mines, Steels and Power plants. Our products are manufactured as per the designs of world leaders such as AEG,CGE. Our products are approved by Governmental agencies and are used widely in power and industrial solutions.
KEY PROJECTS HANDLED:-
PROJECT TITLE : 415V, 300 HP Auto transformer motor starter panel. WORK HANDLED : Planning, Designing, Testing, Erection and commissioning CLIENT : Pune Municipal Corporation .
PROJECT TITLE : 33 kV, 1600A Outdoor Isolating Panel WORK HANDLED : Designing, Wiring, Testing.
CLIENT : Indian Metals and Ferro Alloys Ltd.
PROJECT TITLE : Close Switch, Trip Switch &Tension Shaft Assembly WORK HANDLED : Assembly, Wiring, Testing.
CLIENT : ICF, Chennai
ROLES AND RESPONSBLITES: -
1. Design of the 33kV, 11kV and Low voltage panels as per the customer specifications and Single line diagrams using AUTO CAD.
2. Assembling of Starters from 10 HP – 3OO HP, VCB, VC, LBS, and ISOLATOR. 3. Supervision and assembling / fabrication work of the switchgear panels and execute the panel wiring as per the schematic circuits.
4. Technical support-Testing & commissioning of POWER CONTACTORs, VCBs, CT AND PT in the switchgear panels at site premises.
5. Testing of CT, PT, Circuit breakers, Switchgear and power transformer up to 33kv system. 6. After completing the panel wiring works, VISUAL TEST, HV TEST, Operation and interlock test, contact resistance and operation analyzer test to be performed. 7. Trouble shooting of control and power circuits. Assisting the Operation and maintenance team in carrying out breakdown maintenance / rectification works. DECLARATION:-
I hereby declare that all the information furnished above is true to the best of my knowledge and belief. Yours Sincerely,