Post Job Free

Resume

Sign in

Dental Technician Assistant

Location:
Riyadh, Saudi Arabia
Posted:
December 26, 2022

Contact this candidate

Resume:

MOHAMMED ABDUL KHALED

Al Hasa – Kingdom of Saudi Arabia.

+966-*********

adt9o4@r.postjobfree.com

https://www.linkedin.com/in/mohammed-abdul-khaled

Saudi Commission for Health Specialties License #06RT40976 PROFESSIONAL SUMMARY

Highly professional and skilled Dental Technician with 17+ years solid experience in manufacturing and repairing a wide variety of dental restorations including crowns, bridges, dentures and Orthodontic appliances.

Possess good hand-eye coordination, verbal and written communication skills, team-working, organizational, and time-management skills along with the working knowledge of CAD/CAM, dental equipment and instruments.

AREAS OF EXPERTISE

Acrylic Work : Temporary crowns, Full and Partial Dentures etc.

Orthodontic Work : Hawley’s Retainers, Clear Essex Retainers, Bleaching trays, Mouth Guards, Z-Springs, T-Springs, Anterior and Posterior bite blocks, Twin blocks, Quad Helix appliance, TPA, Arch Expansion Screws, Nance Palatal Arch, Ligature Wires, Space maintainers etc.

Porcelain Work : Ceramic buildup for crowns and bridges over metal and Zirconium frame works.

Dental Implant : Casting metal frame works for crowns and bridges.

CAD/CAM : Designing and producing Zirconium crowns, bridges, veneers, Inlays, Onlays and wax copings for PFM.

CAREER EXPERIENCE

Employer : Hayaty Clinics, Al-Hasa, Saudi Arabia.

Job Title : Dental Technician

Period : September 2020 – Present.

Fabrication of dental restorations using CAD/CAM such as Zirconium crowns and bridges, veneers,inlays,onlays and wax copings for PFM.

Preparing molds for pressing of e-max veneers,inlays,onlays and casting of metal frame works.

Collecting photos and impressions of patients for study models as well as following dentists' prescriptions.

Fabricating custom trays and wax bites for teeth setting.

Creating perfect final form of dentures such as carving denture base in wax, de-flasking denture, and re-articulating for post-process adjustments, including polishing as well as performing repairs for existing dentures.

Utilizing and maintaining cleanliness of dental laboratory materials, instruments or equipment such as impression materials, hand tools, lathes, furnaces, casting machines, waxes, metals, plunger for press, articulators, surveyors, etc.

Employer : Bella Medical Center, Al-Khafji, Saudi Arabia. Job Title : Dental Technician

Period : February 2015 – August 2020

Followed all the established procedures involved in the fabrication of Zirconium crowns and bridges using CAD/CAM, removable prosthesis as well as various complicated Orthodontic appliances used to correct or treat dental irregularities.

Supported the treatment needs of dentists by constructing routine full and partial dentures, and model work for fixed prosthesis to replace partial or total loss of natural teeth.

Poured the impressions as well as fabricated base plates, custom impression trays, and wax rims as per dentists' specifications.

Applied perfect waxing margin techniques as well as monitored casting progress regularly to check consistency of ceramic casting.

Completed and maintained forms, reports, logs, and various records to document work performed as well as worked with other technicians in evaluating, and re-designing processes to improve quality results.

Fabricated various Orthodontic appliances such as Hawley’s Retainers, Clear Essex Retainers, Bleaching trays, Mouth Guards, Z-Springs, T-Springs, Anterior and Posterior bite blocks, Quad Helix appliance, TPA, Arch Expansion Screws, Nance Palatal Arch, Ligature Wires, etc. Employer : Qalaeed Al-Durr Dental Center, Al-Hasa, Saudi Arabia. Job Title : Dental Technician

Period : October 2006 - January 2015

Fabricated dental restorations such as zirconium crowns and bridges using CAD/CAM, dental implants, and various orthodontic appliances, porcelain fused to metal, acrylic and thermo- plastic retainers.

Constructed partial and full dentures as well as repaired, relined, and re-based existing dentures as required.

Assisted in mounting articulated models on an articulator and recording bite relations as indicated as well as practiced using various hand tools and equipment such as presses, lathes, and high-heat furnaces.

Stayed up-to-date with the latest industry trends and advancements as well as followed and maintained all established dental policies and procedures, including compliance with quality standard protocol.

Employer : Metro Dental Laboratory, Hyderabad, Telangana, India. Job Title : Dental Technician

Period : April 2003 – September 2006

Assisted senior technicians in fabricating and repairing dental prosthesis and dental appliances such as crowns, bridges, partials, dentures, and implant restorations.

Melt metal or mix plaster, porcelain, or acrylic paste and pour materials into molds or over frameworks to form dental prosthesis or apparatus.

Build and shape wax teeth, using small hand instruments and information from observations or dentists’ specifications.

Prepare metal surfaces for bonding with porcelain to create artificial teeth, using small hand tools.

Apply porcelain paste or wax over prosthesis frameworks or setups, using brushes and spatulas.

Load newly constructed teeth into porcelain furnaces to bake the porcelain onto the metal framework.

Read prescriptions or specifications and examine models or impressions to determine the design of dental products to be constructed.

EDUCATION

Para Medical Course: Dental Technician (License# 18XXMCC07316/TSPMB) Institution: Megacity Vocational Junior College, India. Duration: June 2001 - March 2003.

Intermediate Education - MPC (Mathematics- Physics-Chemistry). Institution: Anwar-Ul –Uloom Junior College, India. Duration: June 1998 - September 2000

Secondary School Education.

Institution: New Sylvania High School, India.

Year of Passing: March 1998

SEMINARS AND TECHNICAL TRAINING CERTIFICATIONS

Opening and Closing Spaces with the Invisalign System- Biomechanics, by Center for Advanced Professional Practices (CAPP) – February 2021.

Principle of Clear Aligner Biomechanics, by Center for Advanced Professional Practices

(CAPP) - January 2021.

Workplace Hazardous Materials Information System (WHMIS 2015): AIX Safety, Canada – December 2020.

Full Scanning and Designing Protocol of Implant Cases, by Center for Advanced Professional Practices (CAPP) - December 2020.

Diagnostic and Therapeutic Considerations on Peri-Implant Diseases, by Center for Advanced Professional Practices (CAPP) - December 2020.

Dental Technician International Meeting, by Center for Advanced Professional Practices

(CAPP) - November 2020.

Precision Attachment and Laser Welding Technique, by BEGO-May 2008.

Realities in successful Implant Treatment, Jeddah International Dental Conference, Saudi Dental Society, Ministry of Health, Saudi Arabia-November 2008.

Dental Ceramic Buildup Technique, by CERAMCO 3 DENTSPLY-December 2008.



Contact this candidate