E-mail: adt9m1@r.postjobfree.com
Tel: +263*********
Address:
Vuba Gold Mine, Box 63, Gwanda,263
Key skills
Production planning and scheduling
Project management
Costing and Budgeting
Communication
Managerial and Leadership
Microsoft office
Problem solving and analytical
Safe coordination and supervision of teams
Monitoring and evaluation of underground and plant performance
Education
MBA
University of Suffolk, UK (UNICAF)
June 2020 to date
BSc Honours Mining Engineering
University of Zimbabwe
2004
Awards
ZIE 1ST Prize final year project 2003
Licenses, Tickets and Training
Full Blasting Licence
NEC Hard Rock Certificate of Competency
First Aid
Red Ticket
Basic Surpac
SOP formulation
Hazard identification
Facilitating risk assessments
Accident investigations
Culture change
Leadership
ISO 45001 standards
Personal Details
Nationality: Zimbabwean
Languages: English
Passport: Zimbabwean
Drivers Licence: Class 4
Availability: Willing to relocate and travel
Health: Physically Fit
Summary
A dedicated, result driven and safety focused mining professional with over 15 years’ experience in the gold mining sector as Shift Boss, Mine Captain, Mine Technical Assistant, Projects Manager and Underground Manager who is actively pursuing a new and challenging career opportunity in the mining resources industry.
Career history
Underground Manager at Duration Gold
February 2022 to Date
Achieve monthly production and development rates of 5 shafts through effective subordinates’ guidance, planning and scheduling.
Key responsibilities
Managing, directing and control of the mining employees’ compliment of over 400 to achieve the organisational goals.
Grade control monitoring, dilution, and quality control of ores from diverse sources to ensure optimum grade is achieved.
Reviewing and ensuring recommended corrective actions relating to workplace accidents and incidents are responded to and completed on time.
Monitoring and ensuring the workplace inspections, planned task observations and safety audits are regularly conducted and completed to laid out standards.
Successfully optimizing underground mining teams to consistently achieve production and improve development rate.
Managing and directing the various underground projects, including shaft sinking to completion.
Improving mine efficiencies by implementing a change in the mine design layout, employee behaviour and culture.
Achievements
Successfully achieved tonnage calls of 5% above call in Q1 and grade being 1% above budget.
Improved tonnage productivity by 24% from Q2 to Q3 of 2022
Led and coordinated the reduction of accidents by 36% in Q1 compared to the same period in 2021.
Currently on 583 LTA free days
Projects and Planning Manager at Duration Gold
July 2015 to January 2022
Manage all critical projects of the mine such as shaft sinking and equipping, haulages drilling and equipping, shaft repairs and tailings storage construction.
Creation of monthly and annual mining plans.
Key responsibilities
Coordinate the planning, budgeting, scheduling, implementation, and monitoring KPIs of all mine projects until completion in liaison with project teams, Underground Manager, Mine Manager and other stakeholders.
Ensure the safety and health of project teams by enforcing company standard operating procedures.
Coordinate the creation of monthly and annual mining production and development schedules with Underground Manager, Technical Services Manager, SHE, Mine Captains, Surveyors, Geology, Engineering, Finance and Procurement.
Communicate to the executive and all mine supervisors through daily operations report on the projects, production, plant and development output information and statistics. Investigate deviations and ensure appropriate action is taken to attain targets.
Achievements
Successfully coordinated the timely procurement of materials for the new tailings storage facility in liaison with project team resulting in a 32% cost saving.
Led and coordinated the creation of 2021 to 2023 strategic mine plan for production and development.
Worked as part of a team that developed Standard Operating Procedures for mining teams and instilling a new safety culture that has resulted in 50% reduction in accidents in 2021.
Conducted trials on drill steels and bits resulting in 43% improvement in metre/steel or bit in 2019.
Mine Technical Assistant at Duration Gold
September 2013 – June 2015
Provide technical support and advice to mining operations so that mining performance is optimised while providing a framework for continuous improvement.
Key responsibilities
Production and development planning.
Forecasting and Budgeting.
Reviewing output against budget and ensuring appropriate corrective action is taken to achieve targets.
Achievements
Solving tonnage discrepancies between hoisted tonnes and trammed tonnes resulting in 3% deviation.
Created Excel sheets for tracking mining teams for efficiencies.
Mine Captain at Duration Gold
June 2009 – August 2013
Supervision of all production and development at Vubachikwe Main Mine with a complement of 200 workers.
Key responsibilities
Maintaining all workplaces safe and clean
Meeting daily production and development targets
Planning and organizing men, material for my section
Monthly planning of production and development areas.
Achievements
Part of team that achieved 3 million shifts without a lost time accident.
Part of the team that achieved the 3rd highest gold production for the mine since 1980 in 2013. 23% increase from previous year.
Interests
Reading mining magazines
Studying artisanal mining
References
Available upon request