DIPAK SHAH, P.E.

CONTACT INFORMATION

adt6m9@r.postjobfree.com

adt6m9@r.postjobfree.com

732-***-****

Sayreville, NJ 08872

Pass No. 810292

PROFILE & AREA OF EXPERTISE

• Management professional with extensive experience in diverse fields and accomplished academic background

• Proven leader with strong interpersonal and communication skills, Construction and Design engineering expertise, project management capabilities, quantitative and analytical skills

• High aptitude for Teamwork with various departments and Completion of Project within Schedule/milestone and within Budget.

• Areas of expertise include: Construction Management from Award to Close out (>20M Projects)

Communication and Stations (Elevators and Escalators) Dept.,

EDUCATION

B.S., Electronics Engineering(1984)

M.S., Communication(1990)

P.E.(Electrical-1994)

IEEE- Member

COMPUTER SKILLS:

Asite, FABU, 30 Hr. OSHA, NFPA 72; G O Training, AWO Training, Track Training. PMG 123 Hardware: WAN, Ethernet, Fiber Optic System, SONET, ATM, Hubs, Routers, Data and Voice communication, Help Point, VHF Radio System.

WORK EXPERIENCE

Admin. Engineer (Resident Engineer) (Jan. 2019 to Present)) Station, Elevator & Escalator, CPM

MTA- NEW YORK CITY TRANSIT, NEW YORK

• Currently administer the Close out Phase of Replacement of 3 Escalators at Main St. Station, Flushing line, Queens (E-30526, $16.9M) and Replacement of 4 Elevators at Borough hall and Franklin Ave. Station (E- 34030/31, $14.2 M).

• Administer the Construction Project (E-30512/E-30465, $36.8M)) Replacement of 8 Escalators at 125th St., Pelham Bay Park, Pelham Parkway and 181st Street stations in Bronx and Manhattan. Involve in Reviewing final design drawings and Specifications for the contract. Reviewed the CCM packages and involve in selection of CCM team for the project. Prepare Division 1 and Special Conditions for the contract. Supervise the CCM Teams including Project Manager, RE, and 7 Field Engineers. Involves in preparing Design Built, A+B Specification section 1D.

• Interact with Operation, Capital Planning & Budget, Estimating, Scheduling, Procurement, Payment and Design departments. Thoroughly understand Hold Point inspection of Elevator and Escalator for the contract. Attend field meeting with E & E, Stations, RTO, Group Station manager, ADA, Commissioning 2

dept. and EMD. Involve in approving Field storage space for construction. Involve in MPT with DOT Stipulation. Knowledge of PMP and PMG of NYCTA.

WORK EXPERIENCE (cont.)

Admin. Engineer (Resident Engineer) (April 2015 to Jan. 2019) System and Security, CPM

MTA- NEW YORK CITY TRANSIT, NEW YORK

• Manage and administer the construction contract W-32697- PACIS “B” Division Expansion, Furnishing and installing of PA/CIS equipment cabinets at 102 Stations (18.4M) from Award to close out including SC. Administer the integration of PACIS Cabinets with In-House forces (ICC, EMD and MTA-IT).

• Conduct monthly Job Progress Meetings, Coordinate and Schedules contract work during General Orders

(GO), Review and analyze Contractors schedules and coordinate with User and Maintenance Group during GO. Prepare Payment Packages, Updates PSR’s monthly. Manage five Field Engineers.

• Administer Engineering Services (General Orders, Flagging, Work Train, A&P, etc.) with Contractor and schedule work after coordinating with other groups.

• Prepare RFP for Additional Work Orders (AWO) and CCON, Estimates for AWO negotiations with Procurement.

• Prepare Minutes of Meeting for Job Progress Meetings. Prepare A & P request, Flagging request, Prepare G.O. Package and Piggyback G.O. Packages, Resolve field related Problems, Review Safe work Plan, Review PA/CIS Cabinet Equipment Delivery Plan with work Train and Crane, Prepare Work Train Request with Crane, Prepare Benning Augmentation Power Bulletin, Review MOP and Circuit Verification for Bulletin, Prepare weekly work Schedule. Review and perform FAT and PSAT for PA/CIS Cabinet.

• Assist PA/CIS Contract W-32696 and W-32787. Prepare PSR Updates monthly. Review DIR of Field Engineers, Review and negotiate AWO packages send by ICC. Administer, Integrate and coordinate with ICC, EMD and MTA-IT dept.

3

Electrical Engineer Level III (June 1992 to April 2015) Office of Station Design, CPM, Communication

MTA- NEW YORK CITY TRANSIT, NEW YORK

• Design and Manage Communication, Power and Lighting for various Station Rehabilitation Complex Projects (Bid > 10 M). Serve as the design team leader for Rehabilitation of multiple Stations projects of great technical difficulty. Supervise the three assistant Engineers.

• Design Public address system (PA/CIS), Telephone system, CCTV system (ADA and PID), Intercom system, and Fire Alarm system, Help Point for Stations Project. Prepare and review WORK EXPERIENCE (cont.)

Communication Design guidelines and Specification for Stations Project. Coordinate with various disciplines. Manage and Supervise the Capital Projects in Stations Dept. Coordinate and Review of consultant design Drawings and Specification.

• Coordinate, Review and approve Catalog Cuts, Shop Drawings, As-Built drawings, O & M Manuals, Communication Bulletins.

• Supervise the construction, Provide solution to field problems related to communication work, Involved in General Order during construction. Involve in negotiation of Change Order with Contractors. Perform Field Engineering work for VHF Radio System. Project Engineer (June 1989 to June 1992)

Department of Business Service, New York

• Design and review Power, Lighting and Communication System for Ports and Markets of New York City. Prepare contract drawing and Specification.

• Review consultant design drawings and Specification. Resident Engineer (August 1988 to June 1989)

Board of Education, New York

• Coordinate and conduct field surveys to prepare management reports for Asbestos.

• Apply engineering judgement to evaluate the condition for hazardous areas and recommends proper actions.

• Prepare cost estimates for removals of Asbestos. Test Technician (Jan. 1987 to August 1988)

ADT System, Clifton NJ

• Test and Troubleshoot microprocessor based security system which includes Smoke/Fire detection system, Burglar Alarm System and Intrusion alarm system.

• Prepare Test specification. Setting of test schedule and software revision of various projects using ATE. 4

Assistant Engineer (July 1984 to Nov. 1986)

GCEL System, Baroda

• Prepare design for Electrical and Communication system.

• Review Consultant drawing and Specification.

• Prepare cost estimates presented feasibility studies for proposed design modification. REFERENCE:

Furnished Upon Request



Contact this candidate