Qualifications: B.A. - Bachelor of Art 1996 - Alexandria University Experience:

25 years of which 21.5 years in Kuwait

1.5 year in Qatar

2.0 years in Egypt

Skills:

Windows - Operating System

Microsoft Office Package including Advanced Excel 2010

Auto Cad Application

Internet Exploration,

CCS

Aconex

Time management.

Team building.

Valesco.

CCC/CCE.

FIDIC 2022

Credentials: Approved as Senior Quantity Surveyor by MPW and PART. Languages:

Arabic and English

Address: Cell: +965-********

Email: adt5fw@r.postjobfree.com

Skype hanyayoub

References: Available upon request

Hany Ishak CV - 7 April 2021 Page 2 of 6

Professional Experience:

1 – January 2012 to Date:

Company: PACE - Consulting Engineers

Project: RA/167 Jamal Abdul Nasser Street. Value KD 242 m.

Client: Ministry of Public Works.

Public Authority for Roads and Transportation - PART.

Position: Senior Quantity Surveyor.

Main Responsibilities

1- Prepare Monthly Payment Certificates and input the data into Ministry of Public Works electronic system:

Measure the quantities of work done from drawings and by site measurements.

Assign applicable Bill of Quantities item to work done based on Contract Documents.

Negotiate payment against work in progress

2- Participate in the preparation of monthly progress reports submitted to the Client, Ministry of Public Works:

Track Contractor’s performance from actual work done against planned for all disciplines.

Prepare logs for Material on site.

3- Maintain and update logs for Variation Orders and claims. 4- Take-off Quantities from drawings for the preparation of Variation Orders. 5- Establish and maintain quantity files on each Item of work done. 6- Assist Project Controls team on any required in-depth quantity studies. 7- Collaborate with other functions to enhance project success on an as needed basis as required by the Project Director or the Resident Engineer. 8- Interface with and provide on-going technical support to construction team regarding Quantity Surveying.

Hany Ishak CV - 7 April 2021 Page 3 of 6

2 – October 2010 to January 2012

Company: HOT Engineering & Construction Co. - Contracting

Project: 5th Ring Motorway and King Faisal Motorway - Value KD 6.8 m.

Client: Ministry of Public Works - MPW

Position: Senior Quantity Surveyor.

Main Responsibilities

Study the contract documents and evaluate their requirements.

Coordinate with the Design Engineer and the Planning Engineer and prepare all the required documents for submittals, material procurement, progress evaluation and cost control.

With the assistance of the Project Manager, evaluate the contract requirements for each stage and determine the required material, manpower and equipment necessary for the work execution.

Maintain records for the measured works as progressed at site and the procured material and items.

Prepare monthly payments to be submitted to the Client with documented quantities.

Prepare payments for subcontractors and suppliers.

Prepare decumentation for any changes or variations that may take place.

Monitor day-to-day quantities executed at site and check against material usage, and report to Engineering Manager on wastage and over usages.

Identify possible extra items, variations and report to Deputy Project Manager.

Prepare proposals / cost calculation for alterations and variation orders.

Prepare and maintain all documents for potential claims and request for extension of time.

Hany Ishak CV - 7 April 2021 Page 4 of 6

3 – March 2010 to October 2010

Company: Arab Contractors Kuwait.

Project: Kuwait Police College Project - Value KD 45.5 m.

Client: Ministry of Public Works - MPW

Position: Senior Quantity Surveyor.

Main Responsibilities:

1. Study the contract documents and evaluate their requirements. 2. Coordinate with the Design Engineer and the Planning Engineer and prepare all the required documents for submittals, material procurement, progress evaluation and cost control.

3. With the assistance of the Project Manager, evaluate the contract requirements for each stage and determine the required material, manpower and equipment necessary for the work execution.

4. Maintain records for the measured works as progressed at site and the procured material and items.

5. Prepare monthly payments to be submitted to the Client with documented quantities.

6. Prepare payments for subcontractors and suppliers. 7. Prepare decumentation for any changes or variations that may take place. 8. Monitor day-to-day quantities executed at site and check against material usage, and report to Engineering Manager on wastage and over usages. 9. Identify possible extra items, variations and report to Deputy Project Manager. 10. Prepare proposals / cost calculation for alterations and variation orders. 11. Prepare and maintain all documents for potential claims and request for extension of time.

Hany Ishak CV - 7 April 2021 Page 5 of 6

4 – December 2004 to March 2010

Company: Mushrif Trading & Contracting Company KSCC,

Projects:

o Project Name: Lusail Development Sewage Treatment Works Value: QR 200 m

Client: Qatari Diar Real Estate Investment Company Lusail. o Project Name: KOC-Hyundai (27542-2) Civil Works For Structures & Misc. Items

Value: KD 2.2 m.

Client: Kuwait Oil Company - KOC

o Project Name: KOC-Hyundai (27542-1) Constructions of Tank Foundations. Value: KD 2.9 m

Client: Kuwait Oil Company - KOC

o Project Name: RA/34 King Fahed Motorway Ahmadi Interchanges Modifcation. Value: KD 3.98 m

Client: Ministry of Public Works - MPW

Position: Senior Quantity Surveyor.

Main Responsibilities:

o Study the contract documents and evaluate their requirements. o Coordinate with the Design Engineer and the Planning Engineer and prepare all the required documents for submittals, material procurement, progress evaluation and cost control.

o With the assistance of the Project Manager, evaluate the contract requirements for each stage and determine the required material, manpower and equipment necessary for the work execution.

o Maintain records for the measured works as progressed at site and the procured material and items.

o Prepare monthly payments to be submitted to the Client with documented quantities.

o Prepare payments for subcontractors and suppliers. o Prepare decumentation for any changes or variations that may take place. o Monitor day-to-day quantities executed at site and check against material usage, and report to Engineering Manager on wastage and over usages. o Identify possible extra items, variations and report to Deputy Project Manager. o Prepare proposals / cost calculation for alterations and variation orders. o Prepare and maintain all documents for potential claims and request for extension of time.

Hany Ishak CV - 7 April 2021 Page 6 of 6

5 – December 2003 to November 2004

Company: Shaheen Alganim For Bridges and Roads – Contracting.

Project: Road Works in Mubark Al Kabeer Value K.D 3m

Client: Ministry of Public Works.MPW

Position: Quantity Surveyor.

Main Responsibilities:

1. Prepare material cost reports to Main office

2. Prepare payment to MPW and MEW

3. Prepare Payments for Sub-contractors

6 - September-1998 to November 2003

Company: House of Trade & Contracting Co. W.L.L

Projects:

o Project Name: Interlocking tile works Al Farwaniya Value: KD 2.0 m. Client: Ministry of Public Works, MPW

o Project Name: Replacement of Existing Asbestos cement pipes of fresh and brackish Water in Al-Surrah – Value: KD 827,000/-

Client: Ministry of Electricity and Water - MEW

o Project Name: Asphalts Dykes, Ditches and retention pits in Jahra Area Value KD 894,000/-

Client: Ministry of Public Works, MPW

Position: Quantity Surveyor.

Main Responsibilities:

1. Prepare material cost reports to Main office

2. Prepare payment to MPW and MEW

3. Prepare Payments for Sub-contractors

7 – June 1996 to August 1998

Company: The Egyptian Contracting Co. Al Abd.

Projects: Various.

Position: Supervisor, responsible for work quantities.

Main Responsibilities:

Measuring and calculating all work quantities from site on daily basis and report to the person in charge.

+ + + + + + +