Post Job Free
Sign in

Project Manager Construction

Location:
Dallas, TX
Posted:
December 19, 2022

Contact this candidate

Resume:

*

VP Engineering at real estate fund

Name:

Lewis Uri

Taly

Tel: +44.737-***-****

+1-214-***-****

Position Sought: Project Manager

e-mail

***.****@*****.***

Certificates:

Open University

BA (Hons) Business Studies

Techniyon Civil Engineering Diploma

Nationality: UK Residence USA Residence E1 VISA.

Salary: Negotiate

Availability: Two months from contract singing

Contract type: Permanent/ Contract/ Freelance

Resides: UK: 70 WOODSTOCK AVE LONDON NW119RJ

USA: 1707 N. HALL ST. DALLAS TX 75204

Previous Companies: CLIENT-SIDE PROJECT MANAGER FOR:

Accord Healthcare, UK

Hitachi, UK

Research & Development Institute, Israel

Intel Cooperation, Middle East / USA / Ireland

Bright Food International, Israel

Nestle, Israel

Projects: New Build / Fit out Projects:

Pharma Projects – Cleanrooms, Laboratories

Power Stations

Fabrication Plant

Research & Development Building

Warehouses and Logistic Centre

Residential refurbishments

CDMC – Principle Designer and design coordination

Managing several projects at the same time in different sites and clients.

References: Available on request.

2

PROFILE

An experienced Construction Project Manager (Client-side) from planning to completion on a wide range of Pharma and Infrastructure projects. Part of my role is to organize and oversee construction procedures and ensure they are completed in a timely and efficient manner. I am a very well-versed Project Manager in all construction methodologies and procedures, and able to coordinate a team of professionals of different disciplines to achieve the best results.

QUALIFICATIONS & CERTIFICATES

BA (Hons) Business Studies Open University

Civil Engineering Diploma – Poly Technique the Technion Haifa Israel

Institution of Occupational Safety and Health- CSCS

Working under CDM Regulation.

Fully conversant in the NEC 3 contracts..

EXPERENCE SUMMARY

Client-side Project Manager

Manage tendering process and procurement

Appoint Consultants

Project Management from start to completion.

Collaborating with Engineers, Architects etc. to determine the specifications of the project

Contract negotiation

Obtain permits and licenses from all the relevant authorities

Ensure projects are delivered on time according to requirements and without exceeding budget

Deal with claims and disputes

Manage variations

Resource management

Hire contractors and staff

Evaluate progress and prepare detailed reports

Ensure adherence to all health and safety standards

Manage multiple sites

EMPLOYMENT HISTORY

July 2017 to Present DNTS INTEGRAL ENGINEERING, LONDON Client-Side Project Manager (consultancy services) Providing client Project management services to major blue-chip companies on a consultancy basis. Working directly for clients managing their projects, overseeing main Contractors, Consultants such as Architect, Designers and M&E specialists. Project/Programme Management, Cost Management and Contract Management from start to completion including Civil, Structural and Architectural (CSA) foundations, flooring, concrete works, still frames, claddings, walls roofs and ceilings and fit out

(finishing).

3

Clients & Projects

Company: VP engineering at real estate fund in Dallas Texas – Apr 2020 – present . Alto is a real estate fund management we are managing $600m retail and industrial assets across the US exciting and new build warehouses and logistic centers in DFW Houston TX. Responsibilities:

My role is to take a full responsibility for investments, acquisitions, planning, design and delivery of every project within the investment group as well as driving acquisition pipeline leading a lean team and report directly into the Chairman.

Responsibility for origination of the investment deals, due diligence, structuring and execution of transactions and will advise the owner on existing and new investments Form, build and maintain effective relationships and work closely with real estate professionals in Texas and DFW area.

Responsible for new deal origination and sourcing Manage the acquisition process including overseeing due diligence and valuation analysis on target acquisitions, ensuring that comprehensive appraisals are undertaken Prepare and present opportunities to the Owner for formal approval Assist with formulating, establishing and implementing asset or investment strategies, including the implementation of tax structuring and financing strategies Assist in building the business plan at both an asset and corporate level following successful acquisitions.

Day-to-day project management of the construction phase. This includes managing third party interfaces and working with the Contractor and Design Team to ensure the program is maintained and the contingency protected.

Day-to-day oversight and project management of the post planning and construction phases. This includes coordinating the design from stage 3b onwards, managing third party interfaces, supporting the procurement of the Main Contractor and build contract and project management of the delivery phase through to completion.

Supporting the pre-construction and construction phases of our pipeline projects to ensure that the design is outstanding and has embedded within it both construction and operational efficiencies that will ensure its viability.

Procurement of Main Contractors (JCT Design and Build), Surveys and Third Party Agreements within allocated budgets and programs of work.

Contributing to the development of product. The product development includes apartment and communal layouts, interiors and specifications, sustainability, technology and operational performance.

Identifying project risks and producing action plans to mitigate the project risks.

Preparing project reports and presenting them to donors and stakeholders Keeping track of sent proposals and updating the development team

Client: Accord Healthcare - May 2019 – Feb 2020

Project: New Build of 40,000 sq ft Cleanrooms and Labs - Newcastle Responsibilities:

Design coordination and reviews.

Erection management and inspection purchasing include permitting and commissioning and hand over.

Contract management and cost management and safety.

Develop business cases for projects, preparing proposals and gaining stakeholder support and approval.

Manage the project through the full project lifecycle.

Prepare budgets and provide regular cost reports.

Prepare schedules and effectively manage and communicate risks and conflicts.

Lead approved projects and continuous improvement initiatives aligned to customer site strategies.

Prepare timely project reports and communicate effectively with all stakeholders including reporting any project delays, providing mitigation plans to assure on-time execution.

Experience of managing projects across M&E, CAPEX or CSA disciplines. Client: Hitachi - July 2017 – Jan 2019

Project: Ferry Bridge Waste to Energy Power Station – Knottingley, UK 4

Responsibilities:

Managed contractors and programme management

Managing Health & Safety CDM Principle and design management.

Weekly job summaries, daily job progress reports and site maintenance

Scaffold inspections, hot work permits, RC Frames, electrical and mechanical, fit out and reinforced concrete.

Meeting with Engineers, Architects, Surveyors.

Client: Steel Parkings 2016-2017

Inspection over refurbishment of homes and houses across London works:

Design coordination and design management and problems solving.

Preparing weekly Inspection reports about the compliance with the design and the general standards.

Bills approvals.

2008 – Jan 2017 INTEGRAL ENGINEERING, ISREAL

Client-Side Project Management (Consultancy Services) Providing client Project management services to major blue-chip companies on a consultancy basis. Working directly for the client to manage their projects, overseeing main Contractors, Consultants such as Architect, Designers and M&E specialists. Project/Programme Management, Cost Management and Contract Management from start to completion.

Clients & Projects (multiple sites)

Client: Research & Development Institute, Israel – Oct 2015 to Jan 2017 Project: £50M - New Build of R&D Research Building - Israel Project was a 20,000 sqm new build, including cleanrooms infrastructure and facilities, laboratories, offices and labs for the pharma in the R&D sector. Responsibilities:

Managing contractors & promoting Health & Safety.

Weekly job summaries, deliveries, leasing with clients and suppliers

Daily job progress reports & site maintenance

Quality inspections M&E installations

Client: Intel Cooperation, Middle East / USA / Ireland – Aug 2008 to Dec 2016 Project: New Build of the new Fabrication Plant including offices, labs and cleanrooms running projects in different sites FAB 18 FAB 28 and R&D in Haifa directly with intel or indirectly for intel contractors like M+W.

Responsibilities:

To understand project scope requirements and lead-times

Issue clear surveys for each stage of the project supporting the tool install stage (DATUM’S) and base build.

Programme Management to identify any risk

Co-ordinate procurement of key packages

Manage all scope changes, variations and additional costs

Carry out regular site visits and surveys, reporting any issues

Agree logistics, distribution and delivery procedures. Client: Nestle Food Factories, Israel – Dec 2012 to Aug 2014 Project: New Build of Ice Cream Factory for Nestle, including production holes and refrigerating facilities. Responsibilities:

To understand project scope requirements and lead-times

Issue clear surveys for each stage of the project

Programme Management to identify any risk

Co-ordinate procurement of key packages

5

Manage all scope changes, variations and additional costs

Carry out regular site visits and surveys, reporting any issues

Agree logistics, distribution and delivery procedures Client: Bright Food International, Israel – April 2014 to Aug 2016 Project: £10M – New Build of Smoked Salmon Fish Factory, 6,000 sqm including water treatment system. Responsibilities:

To understand project scope requirements and lead-times

Running the daily activities on site in each stage of the project

Programme management to identify any risk

Coordinate procurement of key packages

Manage all scope changes, variations and additional costs

Carry out regular and daily site meetings and surveys, reporting any issues

Agree logistics, distribution and delivery procedures to site. Client: Orek Paper, Israel – July 2012 to Aug 2014 Project: New Build of 2 Logistic Centers and Warehouses, total of 8,000 sqm, including refrigerating storage

Responsibilities:

Design coordinating, tendering and proposals management inspection on site conduct meetings bills approval and commissioning and hand over.

Client: Hewlett-Packard, Israel – July 2012 to Aug 2014 Project: £10M - Erection of a new Ink Factory 5,0000 sq ft including all mechanical and piping facilities, offices cleanrooms and IT rooms.

Client: Texas Instruments, Philippines – April 2011 to Feb 2012 Project: New Build Factory at Clark Region - managing and inspection on the civil works on site Client: Sigma Bakeries, Limassol, Cyprus – June 2008 to Oct 2010 Project: New Build Food and beverages Factory in Limassol including 2,0000 sq ft Logistics Center and Warehouse.

REFERENCES

Two references provided.



Contact this candidate