Post Job Free

Resume

Sign in

Construction Manager Project

Location:
Kidderminster, Worcestershire, United Kingdom
Posted:
December 14, 2022

Contact this candidate

Resume:

Gary Holland 00-968-***-***-** adt177@r.postjobfree.com

GARY HOLLAND

B.Eng (Hons)

British Citizen

Location Muscat Oman

00-968-********

adt177@r.postjobfree.com

PROFILE Construction Manager Holding valid AQP card Proven working experience in construction management Mechanical and Civil. Advanced knowledge of construction management processes, means and methods Expert knowledge of building products, construction details and relevant rules, regulations and quality standards Understanding of all facets of the construction process Ability to plan and see the “big picture”

Competent in conflict and crisis management

Leadership and human resources management skills

Excellent analytical skills in planning and executing large scale multi step projects. Managed and led projects in challenging environments and built multinational teams in various market sectors covering Oil & Gas,Cross country Pipe lines, above and below ground, Commercial and Residential high-rises buidings, Airports, Hospitals, Water treatment facilities and Chemical plants, Power stations coal & combined cycle,oil fired, HVAC systems. FM200 systems E.P.C projects. Pharmaceutical plants, extensive experience with High Purity pipework. Extensive experience of pre-commissioning and commissioning of plant and equipment, Data Centre’s. CAREER HISTORY

SymTech Solar Oman. Dec 2020-Present

Current role Mechanical Installation Manager.

Duties including checking all as built drawings, over seeing all solar array instalations on site. Responsible for budgeting, organization,implementation and scheduling of the projects. Consolidated Construction Engineering Division Muscat Jan 2019-Nov2019. MEP Construction Manager - Shahad Labour Camp Projec cost $ 7 Million. Managed on site construction of 424 man labour camp in remote desert location. Led installation and construction crew of 150 men. Increased accomadation units construction by 60% by steamling sub contractors fabrication yard. Coordinated the build schedule and delivered the project on time with no lost time incidents. Responsible for budgeting, organization, implementation and scheduling of the project. Overseeing onsite and offsite construction to monitor compliance with building and safety regulations Coordinate and direct construction workers and subcontractors Meet contractual conditions of performance

Review the work progress on daily basis

Prepare internal and external reports pertaining to job status Plan ahead to prevent problems and resolve any emerging ones Analyse, manage and mitigate risks

Ensure quality construction standards and the use of proper construction techniques. Project scope this was a greenfield project, including all trench works for foundations,earthmoving,road construction, Electrical & Plumbing servises.

Drake & Scull Qatar http://www.drakescull.com. 2017 Feb 2018 Dec Senior MEP Construction Manager Project cost $ 36 Billion. Project Qatar Rail Depot, Building-14.

Gary Holland 00-968-***-***-** adt177@r.postjobfree.com

Data Control centre for Qatar Rail network.

Overseeing all MEP works associated with the building. CHW, HVAC Potable water AHU, FCU install.Transfered to QR main station in charge of all pressurised corridors installing the Dura steel ceiling. Carillion in MENA Qatar http://www.carillionmena.com/mena Janl 2016 –Feb 2017

MEP Construction Manager Project cost $ 5.5 Billion.

Project: Msheireb Downtown Doha - 2 x chilled water plant rooms and site o Oversaw pipe work and hook up to the district cooling main line o Coordinated all pressure testing flushing to final chemical addition o Full handover and client support

Achievements

Project completed 2 months ahead of schedule

Occidental Oman Inc Oman http://www.oxy.com/OurBusinesses/OilandGas/MiddleEast/Pages/Oman.aspx May2013 – Oct 2015

Lead Refurbishment Manager

Project: Safah field, Northern Oman - refurbishments

Implementing design changes to reduce Opex-Capex expenditure.

Responsible for all sub-contractors

o Work packages documentation and approved implementation- P&IDs, PFDs, PEFs, ISOs, mechanical equipment & vendor drawings – ensured constructability o SQs and TQs - PTW documentation and signatures

o Work instructions – liaised with superintendents and project engineers - scope covered: ß process pipework

ß holding tanks & all asset integrity - pipelines above & below ground ß road crossings - open trench excavations and laying <45 metre spools ß traffic management.

ß Installation of all pipe foundation supports.

ß Inspection, excavation, inspection of old lines using NDT methods XRay, UT, phased array, repair pipe lines with bolted clamps,composite wrap, replacment of pipe lines coating and back fill. Tatweer Petroleum Bahrain http://tatweerpetroleum.com/ June 2011 – March 2013

Lead Construction Manager Associated Gas

Projects:

o Multiple process pipeworks – notably 8.6 kilometres, 30” A.E.G line, 7 kilometres of 2 x 10” M.G.I. lines with foundation supports

o Linked gas line projects

Accountabilities same as with Occidental; additionally: o Transfer to E.P.C contract for liquid / gas, oil and water pipelines o Pigging and hydro-testing

o Supporting commissioning and close-out of outstanding PSSR punch lists Mercury Middle East Bahrain http://mmecorp.ae/ Jan 2010 – April 2011 Gary Holland 00-968-***-***-** adt177@r.postjobfree.com

Site Project Manager.

As Project Manager - project - construction and installation of 2 Valarus gas compression stations, role involved the construction of site pad and security fencing, and approach roads.

As Construction Manager – projects:

o New building for Arcapita Bank in Bahrain Project cost $ 1.9 Billion. o BCA project In Qatar HVAC installation Project cost $ 2.5 Billion.

As Project Manager:

o Oversaw installation of mechanical pipework, plant and equipment, district cooling, potable water, and drainage and plumbing installations

o Monitored and approved method statements, risk assessments o Controlled final installation of all MEP works and closing out inspection reports and NCRs. o

King Abdullah University of Science and Technology (KAUST) Saudi Arabia https://www.kaust.edu.sa/en June 2009 Jan 2010

Client Mechanical Consultant

Project: build for King Abdullah University of Science and Technology (KAUST) Project cost $ 23 Billion.

Managed cooling systems to main data centre & instalation of fire fighting systems. Pre-test and commissioning checks - district cooling, domestic water systems, infrastructure, and fire suppression systems

o Reporting to KAUST and the King’s representatives daily Mercury Middle East Bahrain http://mmecorp.ae/ Feb 2007 – May 2009 Construction Manager

Project: installation of the district cooling systems for the World Trade Centre Bahrain Project cost $ 150 Billion. o Testing and commissioning

Project: Al Salam Beach - construction of a new island offshore o Roads, pavements, base course layers, asphalt, kerbing trech works for electrical, drainage and plumbing services.

o Managed all Mercury labour

Project: new conference centre, 7 hotel and 6 royal villas o AMEP and infrastructure

o Monitored materials approval list

o Controlled all budgets / costs and deliverables

PREVIOUS ROLES 1973 – 2008

Site Manager Q A Pipework

Site Supervisor

Sirius Marine Services Ltd https://www.siriusmarine.co.uk/

Crown House Technologies http://www.crownhouse.com/

Pickfords, http://www.pickfords.co.uk/

Hilton Hotels & Resorts http://www3.hilton.com/en/index.html

Rampton Secure Hospital https://www.nottinghamshirehealthcare.nhs.uk/

Wickersley School and Sports College https://www.wickersley.net/ Gary Holland 00-968-***-***-** adt177@r.postjobfree.com

Welding Supervisor – Siemens UK http://www.siemens.co.uk/en/ Coded Welder Dunn International, GEC Turbines, Lynwood Engineering EDUCATION

University of Hertfordshire.

Bachelor of Mechanical Eng with second class honours (first division).



Contact this candidate