Post Job Free
Sign in

Cad Technician Data

Location:
Obion, TN, 38240
Posted:
October 09, 2022

Contact this candidate

Resume:

* ** *

To Whom It May Concern:

Tim Stegall

731-***-****

*********@*****.***

Please accept my enclosed resume to be considered for employment. My previous experience will enable me to perform a wide variety of tasks for which you may have a need. Being consistent, punctual and a self-starter that has an attitude and disposition that works well alone or with others. Having considerable office and field experience within the oil & gas pipeline industry, I’m not too proud to ask questions about something I’m unsure of. Completely interested in producing quality work as accurately and quickly as possible, I’m detail oriented and analytical enough to produce useful drawings or complete other tasks for various needs within the planning, acquisition, environmental, civil, construction and as-built phases of a major project. Over the previous ten plus years, I have worked almost exclusively within the oil & gas pipeline industry. Working on projects from two to five miles long up to 700 plus miles. And, trunk line projects with as many as twenty five or more laterals branching from it. This done simultaneously with different project names and managers. Doing this, I’ve learned to multitask and prioritize. Although I’ve worked on many different major projects, each one seems to have a set of practices that differ to some degree one from the other. I adjust to whatever project I’m working on. And, being a team player that works towards the same goal appreciating others with safety, integrity, respect and professionalism that’s necessary for success. During every different project, there seems to be a requests for unique deliverables or to accomplish uncommon drawing requests or tasks. When this happens, I ask others within the group for an example or, I develop a way to complete the task with client review and approval. I’m honest and forthcoming about all that I do and will own all of my actions regardless. Completely loyal to my employer down to the brass tacks. This being said, please review the attached resume summary and let me know of any questions.

I Sincerely Thank You!

Tim Stegall

731-***-****

2 of 4

Work History:

Trico Surveying & Mapping Co., Inc. - Field Data Technician / CAD Technician Bloomington, IN - 4 years 7 months - (2007 ~ 2009 & 2011 ~ 2014) - Main Office, Client Offices & Field. Field Data Technician Responsibilities (2007~2009): Lucedale, MS - 1 year 1 month - (November 2007 ~ January 2009) - Field Data Technician S.E.S.H. (Southeast Supply Header 300 mile 36” & 42” pipeline project.

* Inventory & maintain survey supplies and field survey equipment.

* Kept up with daily sign-in sheets, time sheets, safety meetings & topics.

* Processed all new field survey data and employee paperwork & ongoing HR communications as needed.

* Ensured the latest project & staking files were maintained in field survey GPS equipment.

* Retrieved survey data from data collectors, processed, corrected and forwarded to survey engineering.

* Retrieved & checked field books for correctness against data, corrected & forwarded to survey engineering.

* Provided information & technical support to field surveyors as needed including maps, drawings etc.

* Provided coordinates to contractors for anomaly digs based on pig data, AGM locations & pipe data.

* Provided hydro test information for test sections to project engineers.

* Various other supportive survey project information as requested by client and others. Field CAD Technician Responsibilities (2011~2013): Pittsburgh, PA - 4 months - (March 2011 ~ July 2011) - CAD Technician for Williams Gas at GAI Consultants offices at The Waterfront - Worked with PE’s within GAI’s engineering group in support of road crossings and other drawing needs. Directly managed in GAI offices by PE & design engineers on site.

* Produced road, highway and environmental permit crossing drawings for multiple projects. Pittsburgh, PA - 9 months - (July 2011 ~ April 2012) - CAD Technician at Williams Gas office support. Supported Various Project Managers within the Williams Moon Twp offices.

* Produced road, highway and environmental permit crossing drawings for multiple projects.

* Maintained alignment sheet revisions in support of multiple projects.

* Produced special detailed drawings for client including site plans, tie-in details & HDD proposals etc. Superior, WI - 2 months - (April 2012 ~ June 2012) - CAD Technician at Enbridge Energy’s City Center. Prepared to control base file design for Trico’s segments and various other CAD Technician responsibilities for Phase I of Enbridge’s 6B Replacement Project. Directly managed by client in Enbridge Energy’s offices.

* Did line work within 6B Phase I base file as preliminary survey data arrived & update per design changes.

* Produced acquisition drawings for R.O.W. operations.

* Created and or revise existing environmental permit crossing drawings for roads, streams & wetlands.

* Maintained alignment sheet revisions as required.

* Created special site specific drawings for unique purposes as requested.

* Produced special drawings to track & document bat trees as data arrived. Howell, Michigan - 1 year - (July 2012 ~ July 2013) - Field CAD Technician supporting Phase I of Enbridge Energy’s Line 6B Replacement project. Directly managed by Enbridge’s Management Group.

* Controlled design changes within 6B Phase I base file as needed.

* Produced or revised acquisition drawings for R.O.W. operations as required.

* Created and or revise existing environmental permit crossing drawings for roads, streams & wetlands.

* Maintained alignment sheet revisions as required.

* Created special site specific drawings for unique purposes as requested.

* Built HDD’s using tracking data from drill contractors, produced required csv’s for as-built. 3 of 4

Work History Continued:

Technical Design Services of Minnesota, Inc. - CAD Technician Duluth, MN - 1 year 6 months - (September 2014 ~ March 2016) - On boarded with Enbridge Energy’s Major Projects Design Group in support of the Line 3 Replacement Project design. Holland Engineering, Inc. - CAD Technician

Stockbridge, MI - 7 weeks - (March 2016 ~ May 2016) - Field CAD Technician (Contract). Holland, MI - 2 years - (May 2016 ~ April 2019) - CAD Technician (Office). VS Engineering - CAD Technician

Fort Wayne, IN 2 years - (April 2020 ~ Present) - CAD Technician

* Worked on a gravity drainage system for the township of Yoder, IN for the first several months. Completed construction drawing plan & profiles of project for stamp and release.

* Basic CAD drawings, labels, layouts for new projects etc.

* Various other project and production work as directed.

* Civil 3D training throughout my time there.

Education:

Dyersburg State Community College - General Education Diploma. Tennessee Technology Center 2 years - Mechanical Drafting, CAD. Other Training:

Strippit Idex Company – CNC Programming.

Arvin Industries Inc. – ATQPS (Arvin Total Quality Production System). Enbridge Safety Superior, WI.

Enbridge AOC Howell, MI (Advanced Operations Course). Work Locations & References (2007 thru 2022):

Technical Design Services of Minnesota, Inc. - CAD Technician Duluth, MN - 1 year 6 months - (September 2014 ~ March 2016) - On boarded with Enbridge Energy’s Major Projects Design Group in support of the Line 3 Replacement Project design. Kevin Hedlund "Manager CAD / Survey Team Lead" - 218-***-**** Holland Engineering, Inc. - CAD Technician

Stockbridge, MI 7 weeks - (March 2016 ~ May 2016) - Field CAD Technician (Contract). Holland, MI 2 years - (May 2016 ~ April 2019) – CAD Technician (Office). John Rankin “Survey Coordinator” - 616-***-****

VS Engineering

Fort Wayne, IN - 2 years – (April 2020 ~ May 2022) – CAD Technician Mark Herald “Regional Project Manager” - 260-***-**** 4 of 4

Work Locations & References (2007 thru 2022) Continued: Trico Surveying & Mapping Co., Inc.

Bloomington, IN - 4 years 7 months - (2007 ~ 2009 & 2011 ~ 2014) - Main Office, Client Offices & Field. Lucedale, MS - 1 year 1 month - (November 2007 ~ January 2009) - Field Data Technician Jeff Wilcox “Field Survey Coordinator for Trico onsite” - (2007~2009) - 731-***-**** Pittsburgh, PA - 4 months - (March 2011 ~ July 2011) - CAD Technician for Williams Gas in GAI Consultants offices at the Waterfront.

Shawn Rector “Office & Field CAD Manager” - 812-***-**** Pittsburgh, PA - 9 months - (July 2011 ~ April 2012) - CAD Technician at Williams Gas office. Shawn Rector “Office & Field CAD Manager” - 812-***-**** Superior, WI - 2 months - (April 2012 ~ June 2012) - CAD Technician at Enbridge Energy’s City Center. Shawn Rector “Office & Field CAD Manager” - 812-***-**** Howell, Michigan - 1 year - (July 2012 ~ July 2013) - Field CAD Technician for Phase I of Enbridge Energy’s Line 6B Replacement project. Directly managed by Enbridge Energy’s Management Group. Tony Remer “Field Survey Coordinator for Trico onsite” - 970-***-**** Superior, WI - 1 month - (June 2013 ~ July 2013) - CAD Technician at Enbridge Energy’s City Center. Shawn Rector “Office & Field CAD Manager” - 812-***-**** Westville, Indiana - 1 year 2 months - (July 2013 ~ September 2014) - Field CAD Technician for Phase II of Enbridge Energy’s Line 6B Replacement project. Directly managed by Enbridge Energy’s Management Group. Tony Remer “Field Survey Coordinator for Trico onsite” (2012 ~ 2014) - 970-***-**** Shawn Rector “Office & Field CAD Manager” - (2007 ~ Present) - 812-***-**** Joe Palacios "Company VP & Field Operations Manager" - 812-***-**** Professional Reference:

Jason Parker “Data Technician” - 812-***-****



Contact this candidate