Anthony M. Orji
Houston Texas 77036
Phone (cell): 832-***-****
CAREER ASPIRATIONS: To establish a professional and challenging engineering position requiring strong communication and interpersonal skill in the engineering field where advancement and compensation are based on personal performance and recognition.
HIGHLIGHTS: Highly energetic, hard working, self-motivated and decisive individual. Ability to set effective priorities and implement decision to achieve immediate and long term goals and meet operational deadlines. Function well in high pressure atmosphere, capable of handling a diversity of responsibilities simultaneously.
EXPERIENCE:
Defense Patrol & Investigation.
13090 Bellaire Blvd. Suite D
Houston TX. 77072. Sept. 2020
Patrol all the areas covering the Clint locations, make
Sure all doors are secured. Check everybody coming in and out
Of the company for proper identifications and excourt
Them to they proper location. Also make sure the employees are
Properly checked in and out before they leave.
Asst. Chief Engineer
Stockdale Management LLC
June 2015 to July 2021
Responsible for the maintenance and
Construction of two 8-story office
Buildings, consisting of 400,000sf on a
11 acre plot in Sugar Land Texas. Work
with high profile tenants and the
Comfort and all aspects of the office buildings
Complex. Perform preventive maintenance on all
Mechanical equipment. Oversee building upgrades
Consisting of waterproofing, tile
Replacement at entrances, replacement of emergence
Power transfer switches. Plan and budget all upgrades,
Relocation of maintenance shop, Lighting
Upgrades, BAS upgrades and all repaired and
Maintenance projects.
Jan. 2013
Tonpike Technology Ltd
Plot 19 ROAD 1 IMO Housing Estate
Owerri, Nigeria.
Procurement and installation of mini Boilers, installation and
Maintenance of small scale industries, portable water bottling
Company. Copper and stainless welding, building and engineering
Services.
April 2011 to Nov. 2012
Able Engineering Services
1625 K Street NW
Washington DC
Maintain one office building 210,000 sq ft. Respond to most building
Needs including temperature calls. Assist property manager with
Capital improvement projects. Perform preventive maintenance on all
Building equipments.
March 2009 to Feb. 2011
Kenwood Management Company
5272 River Road Suite 360
Bethesda MD 20816
Maintain two office/warehouse building, 375,000 Sq Ft and
175,000 Sq Ft. Respond to all building needs including temperature calls, Plumbing, Electrical and Air-Condition.
Also monitor a 450 Cleaver Brook Boiler and a 650 tons Carrier Chiller. Perform preventive maintenance on all equipment.
Inspect all work done by outside contractors. Assist property manager with capital improvement projects.
November 2002 to September 2008
ABM Engineering Services 145,000 sq. ft.
225 Reinekers Lane
Alexandria, VA 22314
Lead Engineer
Bohn 65 ton packaged units on each floor, variable air volume system with DDC control (Capron smart I & II)
Water cooled condensers utilizing a 650 ton cooling tower
A/C split system with water cooled condensers
700 South Washington, 65,000 sq. ft.
Alexandria, VA 22314
Rooftop units (Trane and McQuay) 60 tons each VAV system with DDC control (Environmental Technologies)
Heat pumps
Anthony M. Orji Page 2
1525 Wilson Boulevard 250,000 sq. ft.
Arlington, VA
Asst. Engineer Manager
60 tons package units on each floor, variable air volume with pneumatic control, two 25 hp air compressor.
Water cooled condensers utilizing 700 tons BAC cooling tower
VAV boxes with electric reheat
Heat pumps and associated pumps and controls
September 1999 to October 2002
Adhesive/Aerospace Lab 3M
St. Paul, Minnesota
Quality Control Engineer
Perform quality control test on Os2 material. Build prototypes and perform test in a control lab, test include mechanical, chemical and tensile strength test, stimulated atmosphere conditional test.
February 1986 to March 1999
Building Tech. Engineers 195,000 sq. ft.
FDIC Building 220,000 sq. ft.
Arlington, Virginia
Asst. Lead Engineer
Three 250 tons carrier centrifugal chillers
Two 300 hp cleaver brooks hot water boiler
800 tons BAC cooling tower
Fan coil units and air handlers
VAV boxes with DDC and Seaman controls
Heat exchanger
to 1 tons water source perimeter heat pumps, VFD pumps
EDUCATION:
University of the District of Columbia
A/C Refrigeration classes, HVAC I & II
Electric Motors A/C and DC pumps
Variable frequency drives, Industrial Electronics
DDC controls
Anthony M. Orji Page 3
LICENSES:
In School at N.A.P.E. to obtain 3rd class DC License
CFC Refrigerant Certification Universal
COURSES:
Preventive maintenance on building equipment, A/C refrigeration diagnostic industrial water treatment and industrial safety, fire safety on an industrial control lab, auto clave use and maintenance engineering leadership training, building automation
References available on request