İbrahimov Huseyn
Education
Languages
Computer skills
AutoCad, Eplan good
MS Word good
MS Excel good
MS Outlook good
Work experiences
Company-Voltaj MMC (May2021-…)
Position: Electrical Engineer (Installation, Design&Control Engineer) Responsibility:
Method of Statements, Material approval forms, Bill of Quantities, Operation team tranings
Automation System (Siemens TIA Portal, S7-1200)
MV System (6-10-35KV Transformers& MV Cubicles)
Emergency Generator, Ups System
Busbar System
LV System
ELV system
Cable tray installation
Panel mounting&Testing
2009-2013- Engineering Communication Systems
Azerbaijan University of Architecture and Construction Date of birth
23.07.1991
Phone
Mob.: +994-**-***-**-**
******************@*****.***
Address
Baku city Binəqədi district
C.Cabbarli street 50
References
Samir Nəbiyev
Chief Electrical Engineer- Pasha
Technology. Tel:-+994*********
Interests
To be engaged in
wrestling
• To play football
• Investigate and learn
technical information
Citizenship
Azerbaijan
Marital status
Married
reading writing speaking understandin
g
Azerbaijan excellent excellent excellent excellent Turhish excellent excellent excellent excellent
English excellent excellent good good
Nihat
Manager – Nitel Technology
Tel:- +905*********
Lighting and Emergency Lighting System
Data&Telephone and TV System
Signal Reference Grid system
Lightining Protection System
Grounding System
Control of installation of devices&take overing- Transformers(6-10- 35KV), generators, UPS, panels etc.
Correcting Electrical design drawings
Make a Coordination drawings
Company-Avandsis Group (October 2020-May 2021)
Position: Electrical Engineer (Design Engineer)
Responsibility:
Collection of preliminary data for design;
Participation in the design of the terms of reference
Development and approval of project documents according to the customer's terms of reference;
Design of equipment for and Automation systems CCTV, Security, Electrical, HVAC and preparation of drawings;
Management of projects and relevant documents related to projects;
Compliance with the requirements of the rules, standards and other technical and normative documents in force during the implementation of projects;
In case of an application, to be on a business trip to the facilities located in the districts to eliminate the problems.
Company- Nitel Technology (January 2020-September 2020) Project: Data Center (Goychay)
Position: Electrical Engineer (QA&QC)
Responsibility:
Method of Statements, Material approval forms, Bill of Quantities, Operation team tranings
Automation System (BMS, PMS)
MV System (Transformers& MV Cubicles)
Emergency Generator, Ups System
Solar System
Busbar System
Rack Cabinet&PDU System
LV System
ELV system
Cable tray installation
Panel mounting&Testing
Mechanical equipment System (Crac, Dumper, Air Conditioning)
Air Sampling System
Gas Suppression System
Fire Alarm& Voice Evucation System
Lighting and Emergency Lighting System
Data&Telephone and TV System
Access Control & CCTV System
Signal Reference Grid system
Lightining Protection System
Grounding System
Control of installation of devices&take overing- Transformers, generators, UPS, panels etc.
Correcting Electrical design drawings
Make a Coordination drawings
Company- Pasha Construction (September 2019-January 2020) Project: Knight Bridge
Position: Electrical
Responsibility:
MV System (Transformers& MV Cubicles)
Automation System (BMS, PMS)
Emergency Generator, Ups System
LV System
Panel mounting&Testing
Cable insulation testing
Fire Alarm& Voice Evucation System
Lighting and Emergency Lighting System
Data&Telephone and TV System
Mechanical equipment System ( VRV, Dumper, Air Conditioning)
Lightining Protection System
Grounding System
Control of installation of devices&take overing- Transformers, generators, UPS, panels etc.
Company-Azen MMC (May 2017- September 2019)
Project: Pirshagı Boarding School
Position: Electrical (Installation)
Responsibility:
Emergency Generator
LV System
Panel mounting&Testing
Fire Alarm& Voice Evucation System
Lighting and Emergency Lighting System
Data&Telephone and TV System
Grounding System
Control of installation of devices&take overing - Transformer, generator, panel etc.
Company-Prometal MMC (Augost 2016- June 2017)
Project: Roof Manufacturing Plant
Position: Electrical
Responsibility:
Transformer
Emergency Generator
LV System
ELV System
Panel mounting&Testing
Lighting and Emergency Lighting System
Cable insulation testing
Induction Motors connection& Testing
NTC&PTC Systems
Grounding System
Control of installation of devices - Transformer, generator, panel etc.