Sheet*
Michael Sanchez
Hemet, CA. 92545
Email: sanchezmikea
My Operating Engineer career started in 1978 as a survey apprentice, I have completed Local 12 party chief school
State of California Apprenticeship: International Union of Operating Engineers, Local 12
Qualification: Certified Party Chief Land Surveyor
Year Obtained: 1982
Pasadena City College (Pasadena, California)
Qualification: Survey Technology
Year Obtained: 1984
New York University (New York, New York)
Major: Administrative Science
Year Obtained: 1972
SECURITY CLEARANCES;
-Department of Defense
-Federal Aviation Administration
-Department of Energy (Nuclear)
-Department of the Interior (Native American)
RECENT PROJECTS:
Cypress High School 2018
JK Kennedy High School 2018
Inglewood Stadium 2018
EMWD Mass Water Pipe Pumping Station 2017
San Diego International Airport 2017
Point Loma Naval Base Fuel Depot 2017
PAST PROJECTS:
Page 1
Sheet1
Eastside Reservoir Project (Hemet, California)
Project Information: http
Key Responsibilities: Positioning of East Dam, Saddle Dam, West Dam, P1 Tunnel, Upper and Lower Adit Tunnels
Date: 1997-2000
Metrolink Los Angeles to Palmdale
Project Information: http://articles.latimes.com/1994-02-15/local/me-23313_1_northridge-station
Fast track project with time constrained funding, requiring topographic ground survey for quick turn around on new
Key Responsibilities: Existing railroad ROW & RR location, Strip Ground topographic mapping with tunnel tights.
Date: 1993-1994
Century Freeway (Southern California)
Key Responsibilities: Positioning of 25 bridges, 150 drainage units, 9 kilometers of freeway roadway staking, 10 en
Date: 1989-1993
Santa Ana Freeway Widening (Southern California)
Key Responsibilities: On-site survey and construction supervision of 20 kilometers of major freeway improvements
Date: 1985-1987
The Los Angeles Convention Center (Los Angeles, California)
Date: 1989-1992
The Center in Escondido (Escondido, California)
Date: 1992-1993
The Costco Center (Temecula, California)
Date: 1992
The Wilshire Plaza (Los Angeles, California)
Date: 1984
The Los Angeles Ronald Reagan State Building (Los Angeles, California)
Date: 1986-1988
The Hughes Corporate Center (El Segundo, California)
Date: 1983
The Nickels Institute (Ortega Highway, California)
Date: 1990-1992
Page 2
Sheet1
Numerous mid to low rise steel and concrete structures.
Date: 1984 – Present
MAPPING:
State of California Transportation Authority
Underground and surface utility mapping for Route 62/74 (Southern California)
Date: 1991-1993
Riverside County Transportation Commission (Riverside, California)
Engineering of Right of Way, Route 74
Date: 1992-1993
Lake Avenue School (Hemet, California)
Date: 1992
Haddon Avenue School (Los Angeles, California)
Date: 1993
Over a thousand ALTA’s, Boundary with Topography and Architectural maps
Date: 1984 - Present
LAND DEVELOPMENT:
100 kilometers of mass transit rail (MetroLink) for the State of California: Recon, Topo, As-Built, Layout and Field
Date: 1995-1997
Grading of over 5,000 subdivision lots with drainage, utilities and monumenting.
Date: 1994 - Present
Hundreds of industrial and commercial projects with mass earthworks, field engineering, As-Building and Lot Certi
Date: 1994 - Present
25+ custom home surveys.
Date: 1994 - Present
EQUIPMENT EXPERIENCE
Survey GPS/Total Stations:
Leica (30 years)
Topcon (15 years)
Trimble (4 years)
Page 3
Sheet1
Navcom (4 years)
Computer Programs:
AutoCAD (20 years)
Carlson Survey CE (20 years)
Other:
GPS Certified
First Aid
Confined Space
EMPLOYERS AND THEIR CLIENTS:
State of California (Cal-Trans, EMWD)
Date: 1991-1993
County of Riverside, California
Date: 1992 - 1993
Betz and Associates (Agoura, California)
Date: 1999 - Present
Alta Consultants (San Diego, California)
Date: 1998 - 2000
Haro Engineering (La Mirada, California)
Date: 1997 - 2000
Asahi Surveying (Santa Fe Springs, California)
Date: 1995 - 1999
David Evans and Associates (San Bernardino)
Date: 1991 - 1994
Kiewit Pacific Construction (Hemet, California)
Date: 1998-1999
AWZ Construction (Hemet, California)
Date: 1997 - 1998
Page 4
Sheet1
Kijima Construction (Los Angeles)
Date: 1985 - 1987
PCL Construction (Escondido, CA)
Date: 1992 - 1993
Psomas and Associates (Santa Monica, California)
Date: 1984 - 1985
Mollenhauer Group (Los Angeles, California)
Date: 1982 - 1983
Sikand Engineering (Van Nuys, California)
Date: 1977 - 1982
Metro Engineering (Van Nuys, California)
Date: 1985 - 1996
Aguirre and Associates (Riverside, California)
Date: 2003 – 2005
Shimmick Construction
Date: 2012 - 2016
Malcolm Drilling
Date: 2011-2017
Page 5
Sheet1
Dam Foundations and Grouting, Monitoring Systems, Roadways, Quarry and Blasting.
d alignment, with field layout calculations from CAD drawings.
w rail for Metro Link trains (upgrade from freight) and new Metro stations.
Page 6