Post Job Free

Resume

Sign in

I&C Lead Engineer

Location:
Abu Dhabi, United Arab Emirates
Posted:
September 23, 2022

Contact this candidate

Resume:

Mohamed Abbas

Instrumentation & Control Systems / ICSS Superintendent

Functional Safety Eng. Safety Instrumented Systems (TÜV Rheinland, #12398/ 16, SIS)

Fields of Competence

ICSS / Control Systems Specialist / Expert (Engineering, commissioning, start up and maintenance)

Field instruments HART & Foundation Fieldbus Specialist, commissioning & troubleshooting.

Foundation Fieldbus instrumentation engineering & Commissioning

ICSS / Control Systems FAT, IFAT and SAT

SIS, ESD, EDP, FGS. UCP packages

Subsystems & Packages commissioning and integration

Control systems & Instrumentation Pre-commissioning, commissioning, startup maintenance, troubleshooting, Generating Procedures for different project phases (ICSS)

Wireless communication design (for control systems)

ICSS installation & inspection

Yokogawa DCS CS3000 / CENTUM-VP

Yokogawa SIS Prosafe - Siemens APACS+, Quadlog) & Prosafe-RS (ESD and F&G)

Yokogawa Stardom PLC

Yokogawa SCADA FastTools

Yokogawa Exa-Quantum SER (Sequence of event application)

Yokogawa Exa SMOC, Pilot, OPC

Yokogawa CAMS for HIS (Consolidated Alarm Management)

Yokogawa Multiple domain handling tech, Wide Area Communication equipment’s / WAC Routers

PRM Planet resource / asset management

Yokogawa Trainer / instructor for different Yokogawa Systems

Training on Triconex Safety systems / passed familiarization course

HIPPS AAdvance Rockwell Automation

ABB 800XA DCS & Safety Systems

Honeywell Safety MGR SC PLC / HVAC UCP

Schneider SIL-3 Modicon Quantum Safety PLC

VIJEO designer 6.2 – MAGELIS HMI

Recent Experience (Automation & Instrumentation Field)

ADNOC Onshore Projects: Qusahwira Field Development Phase-II Project & Bu-Hasa Integrated Field Development Project - Lead I&C commissioning Specialist Engineer ADNOC Onshore PMC (October 2021 – Current)

BAB Integrated Facilities Project UAE – ADNOC Onshore PMC –Senior I&C Commissioning Specialist Engineer (Nov. 2020 – October 2021)

YAMAL LNG TechnipFMC – Instrument Control Systems Superintendent – Department Manager (Feb.2018 – Sep 2020)

YAMAL LNG TechnipFMC - Integrated Control and Safety Systems Lead Commissioning engineer (2017 – Feb.2018)

Yokogawa YSK Russia Engineering & Maintenance Consultant: (2009 – Dec.2016)

Yokogawa Europe B.V - YEF: as Shell/Sakhalin-2 Sites Manager & technical Support Lead (2007 – 2009)

Yokogawa /Giza Systems: as Lead Systems/Instrument Engineer (2001 - 2007)

Qusahwira Field Development Phase-II Project UAE – ADNOC Onshore PMC

(October 2021 – Current)

As Lead I&C Commissioning Specialist Engineer Reporting to Commissioning MGR, Managing Instrumentation, Control systems, Carrying out SAT, instrumentation Loop check, functional test for DCS Logic, ESD & HIPPS, FGS, VESDA, FACP / Fire suppression, HIPPS, HVAC, Gas lift, Gas injection compressors UCP packages Commissioning and integration with Yokogawa ICSS system, WHCP SAT, Commissioning & functional check For Pads,BAU and new train at CDS, ICSS integration for new project with existing main control room at CDS

Bu-Hasa Integrated Field Development Project - UAE – ADNOC Onshore PMC

(November 2021 – Current)

As Lead I&C Commissioning Specialist Engineer Reporting to Commissioning MGR, Managing Instrumentation, Control systems, SAT, instrumentation Loop check, functional test for DCS Logic, ESD & HIPPS, FGS, VESDA, FACP / Fire suppression, HIPPS, HVAC, UCP packages Commissioning and integration with Schneider ICSS system

BAB Integrated Facilities Project UAE – ADNOC Onshore PMC

(Nov. 2020 – October 2021)

As Senior I&C Commissioning Specialist Engineer Reporting to Commissioning MGR, Managing Instrumentation, Control systems, Carrying out SAT, instrumentation Loop check, functional test for DCS Logic, ESD & HIPPS, FGS, VESDA, FACP / Fire suppression, HIPPS, HVAC, UCP packages Commissioning and integration with ABB ICSS system, WHCP SAT, Commissioning & functional check Off-pads, Well-Bays, RDSs and ICSS integration with main control room BCDS

YAMAL LNG Project / Technip-FMC - Russia (TOTAL – YAMGAS / Novatek)

(Feb. 2018 – Sep. 2020)

As Instrument Control Systems Superintendent (Department Head), Phase-1,2,3 of YAMAL LNG instrument Control Systems, FGS & OTS, Planning the commissioning schedule, activities, SAT, Functional testing, MOCs & software change requests, OTPs, Performance test, punch lists clearance and handover to CPY.

YAMAL LNG Project / Technip-FMC - Russia (TOTAL – YAMGAS / Novatek)

(Aug. 2017 – Feb.2018)

As ICSS Lead Engineer, Managing and carrying out Functional Testing Activities, SATs MOCs & software change requests and OTS, Punch lists clearance. managing ICSS & FGS team (engineers, supervisors and technicians) for commissioning, start up and sequences functional testing of the ICSS & UCP Packages, FGS systems, Fire suppression systems, PAGA, preparation of commissioning / SAT dossiers for the different Project units / Packages, Hand on Functional testing and Verification of C&E / SLD of PSD, FGS, and ESD Systems, rechecking and verification of all instrumentation functionality within designated project area / package. Making sure the proper implementation and carrying out of different commissioning procedures of ICSS during commissioning phase 1 (Utility, Train-01 and loading / offsite).

YAMAL LNG Project / Technip-FMC - Russia (TOTAL – YAMGAS / Novatek)

(April. 2017 – Aug. 2017)

As Senior ICSS Engineer / Functional Test Expert, carrying out SAT, commissioning, start up and functional testing for ICSS, FGS & UCP Packages, FGS systems, Fire suppression systems, PAGA, preparation of ICSS commissioning dossiers, Verification / Functional Testing of C&E and shutdown logic Diagrams for PSD, ESD, and FGS Systems. Carrying out Functional analysis and OTP testing for different units within the project. MOCs & software change requests, Punch list clearance and Handover to client

Sakhalin II Projects (LNG-OPF-LUNA-PAB-BS2 Sites) - Russia- (SEIC / SHELL)

(Jan 2013 – Dec. 2016)

Engineering, implementation for new projects, technical support & Maintenance for different projects / Sites of Shell Sakhalin-2 Projects.

Preventive Maintenances / maintenance planning and Operations support,

MOC‘s (Management of Change), SCR’s (Software change request) Implementation.

Carrying out & planning for Annual shutdowns scope and activities.

Upgrade to new Centum VP Yokogawa, upgrading new Prosafe-Com Mulcoms, Multi Projects Domain IOS Upgrade to Centum VP, and WAC Routers upgrade Vnet to Vnet/IP. On job training for company Engineers in order to manage DCS, Safety systems and Foundation fieldbus maintenance.

Sakhalin II LNG - Russia- (SEIC / SHELL)

(June 2012 – Jan 2013)

AS ICSS Lead Commissioning Engineer., Yokogawa DCS (CS3000), Yokogawa SIS Prosafe Safety system FGS/ESD, carrying out all commissioning activities / Safety Matrix for ETP-Project -, Fieldbus instruments commissioning / problem solving, functional testing of DCS Logic and C&E / safety matrix for FGS/ESD Systems.

Sakhalin II North-GTT Russia- (SEIC / SHELL-Gas prom)

(October 2011 – June 2012)

AS ICSS Commissioning Lead, Yokogawa Stardom PLC RTU / ENMC; Yokogawa SIS Prosafe-RS Safety system, and Yokogawa Fast/tools SCADA Version 9.2, carrying out all commissioning / start up activities/ Functional testing for different logics, carrying out the functional testing and verifications of the C&E for FGS/ESD System; doing all required planning and generating the required Yokogawa redline / as built documents

Sakhalin II South-GTT Russia- (SEIC / SHELL-Gas prom)

(March 2011 – Dec 2011)

AS ICSS Commissioning Lead, Yokogawa Stardom PLC RTU / ENMC; Yokogawa SIS Prosafe-RS Safety system, and Yokogawa Fast/tools SCADA Version 9.2, carrying out commissioning / start up activities / Functional testing for different logics, carrying out the functional testing of the C&E for FGS/ESD System; doing all required planning and generating the required Yokogawa redline / as built documents

Sakhalin II Projects OPF - Russia- (SEIC / SHELL)

(Feb 2010 – March 2011)

AS ICSS & SCADA engineer, carrying out maintenance activities and implementation of new projects and software changes, support Foundation fieldbus instrumentation replacement and configuration

Sakhalin II BS-2 Project – Russia- (SEIC / SHELL/KOGAS-Teck- EASTROY)

(May 2009 – Feb 2010)

AS Safety / FGS Senior Safety Engineer, on Yokogawa SIS Pro-Safe Safety system for the two booster RR compressors, carrying out the commissioning activities and interfacing with Telecom & PAGA, functional test for all safety systems and shutdown sequences as per the FDS and C&E, carrying out all required modifications and generating the latest red-line & as built documents

Sakhalin II OPF Project - Russia- (SEIC / SHELL)

(Feb 2007 – May 2009)

As Yokogawa ICSS Commissioning Lead and technical support for all Sakhalin-2 sites, Yokogawa DCS (CS3000), Yokogawa SIS Pro-Safe Safety system, SCADA Fasttools, carrying out all commissioning / start up activities, supporting the Fieldbus instruments commissioning / troubleshooting, functional testing the C&E for FGS/ESD Systems; ModPacks required planning and implementation, generating the latest redline / as built documents, carrying out the scheduled shutdown activities since 2009 till 2016

GUPCO Rehabilitation Project BADRI Platform (British Petroleum, ENPPI) (March 2006 – Feb 2007)

As Lead engineer; From the bidding Phase, the main supplier for ENMC /UPS/Prefab Building, Yokogawa DCS (CS3000), Yokogawa Prosafe-Rs SIS, field instruments replacement, FGS systems, Fire suppression systems, PAGA & Telecom systems, carrying out Startup & Commissioning, Generating all Functional Design Specifications & complete design, complete engineering phase and FAT. Revising SIS (Pro-Safe RS) FDS & Documentation before submission to the client, handed over the SIS System to carry out the I-FAT, SAT and commissioning / start up

Yokogawa CS3000 & Prosafe RS training for client engineers.

KHALDA Petroleum co. (APATCHE-USA)

(Jan 2006 – July 2006)

As Lead engineer, designing the communication between WHCP RTU'S via spread spectrum (communication with average distance 14 KM.), Generating all Functional Design Specifications & complete design, complete engineering phase, FAT, SAT and start up

RASHPETCO–OPF Simian sienna Project (British Gas / ENPPI)

(April 2005 – Aug 2005)

AS Senior ICSS / Instrument Engineer, Yokogawa DCS (CS3000), Yokogawa Prosafe SIS, carrying out Startup & Commissioning, Yokogawa Analyzer House Installation and interfacing with DCS carrying out FAT Punch List Clearance, HVAC Installation & SAT Test

IICP (International Industrial Chemical Park)

(Jan 2005 – Dec. 2005)

As Lead system & instrument engineer, Yokogawa DCS, (CS3000), Foundation Fieldbus segments design, Functional Design Specifications (FDS) & system design, complete engineering phase, FAT and SAT, carrying out field instruments commissioning and site startup & operations support

AFCO Fiber Company

(June 2004 – Feb 2005)

AS ICSS Engineer, Yokogawa DCS (CS3000), support for both control & field instrument sides, instructor and trainer (On job) of Fieldbus instrumentation; preparing the required materials / documents of the training of Foundation Fieldbus on site

SEGAS LNG Project (MW-KELLOGG)

(Sep. 2002 - May 2004)

AS Instrument commissioning Engineer (pre-commissioning / commissioning), Yokogawa DCS (CS3000), Yokogawa Prosafe SIS, Yokogawa SCADA FastTools for ENMC/ELICS Startup & Areas / unit commissioning for both sides control Systems & HART Instrumentation, including scheduled / Annual shutdown activity between 2005/2006, supervisor of the site instruments calibration during construction phase

Nasr Canal Control Systems

(2001 – Sep. 2002)

SCADA & instrument Maintenance Engineer, carrying out maintenance activities for filed instruments and Control systems on rotation base and back to office

Education Background

BSc communication; Electronics & Communication & control engineering (Faculty of Engineering C.U)

Yokogawa DCS & SIS Training courses

Yokogawa Instrumentation course

TÜV FSE SIS IEC61508 / IEC61511 Functional Safety Eng. Safety Instrumented System (TÜV Rheinland, ID #12398/ 16)

E-mail & Cellular

adspee@r.postjobfree.com

Cell: +971*********,

Roaming: +201*********, +791********

Personal information & Nationality / Residency:

Date of Birth: 25th September 1978, Married, 2 children.

Nationality: Russian Federation / Egypt

Residency: UAE

LinkedIn profile: https://www.linkedin.com/in/mohamed-abbas-97615b5b/



Contact this candidate