Post Job Free
Sign in

Electrical Engineer Office Project

Location:
Dubai, United Arab Emirates
Posted:
September 20, 2022

Contact this candidate

Resume:

*

Magdy Ramadan Abd El Razek

Nationality : Egyptian

Marital Status : Married

Visa Status : Transferable Visa

Phone Number : 050 – 6439493

Languages : Arabic Mother Tongue & English Fluent

Education : Faculty of Engineering & Technology Helwan University – Egypt Engineering specialization : B.E (Electrical Engineering) – 1986. E – mail address : ***********@*****.***

Additional Information

1. Computer literate with competence in Microsoft Applications and AutoCAD. 2. Computer literate competence in electrical programs like lighting lux calculation, cable size calculation and voltage drop calculation.

3. Good command of written and spoken English.

4. Holding valid UAE driving license.

5. Holding approval from works department (DMA – ADM). 6. Holding approval from ministry of works as Electrical Engineer for Kalpa Hospital in al Fujairah. 7. Holding approval from General Authority of Health Services for the Emirates of Abu Dhabi as Electrical Supervision Engineer for new clinic in Al Ain. 8. Holding approval from Abu Dhabi Judiciary Department as senior Electrical Engineer for Detainees and courthouse building in Abu Dhabi.

9. Holding approval from Abu Dhabi General Services Company (MUSANADA) as MEP Manager for future schools – phase 4 in Abu Dhabi and Al Ain. 10. Holding approval from Abu Dhabi General Services Company (MUSANADA) as Senior Electrical Engineer for Rehabilitation centre in Shakhboot City – Abu Dhabi. 11. Holding approval from Abu Dhabi General Services Company (MUSANADA) as Senior Electrical Engineer for future schools – phase 6 in Al Ain and Abu Dhabi. 12. Holding approval from Abu Dhabi General Services Company (MUSANADA) as Senior Electrical Engineer for the following two projects in Abu Dhabi: a. Federal Supreme Court (FSC).

b. Public prosecutor office (PPO).

c. Fatima Bint Moubarak Sport Academy (FBMSA).

13. Holding approval from Abu Dhabi General Services Company (MUSANADA) as Senior Electrical Engineer for Majlis, Mosque and confidential building in Abu Dhabi. 2

Freelance design works for some of consultant offices in Abu Dhabi A. Momen Architects and Consulting Engineers

1. Al Qubasy Villa.

2. Al rahba stable.

3. Clean rooms.

4. Cure medical center.

5. IDC project.

6. Marble factory.

7. Villa Ahmed Hassan Al Zaabi.

8. Horse training.

9. VILLA Abu Shibs.

10. Four villas extension (Pink Villas Project).

11. Shabra in Mussafah.

12. Sub – station in Al Reem island.

13. Utilities Building.

14. Saif Hamad, Ahmed Al Shafey & Mohamed Muslem Villas. 15. Labour Camp in Musaffah.

16. House accommodation in Al Reem Island.

B. Integrated Engineering Consulting Office

1. Ahmed Al Zaabi.

2. Villa Ali Al Zaabi.

3. Landscape & 13 small buildings in Fatimah Bint Mubark Sports Academy – Phase 2 C. Rootage Engineering Consulting Office

1. AL Ain Sport Hall.

2. Archdome.

3. Clinic center.

4. Al Fujairah sport hall.

5. RAK sport hall.

6. New complex 3 – Al Dhafra.

7. New Residential in Zarko.

8. Swihan Camp.

D. Arab Experts Consulting Engineers (AREX)

1. Al Aweer Bus-Station maintenance.

2. 322 Villas in Western Region.

3. Mosque for 322 Villas in western Region.

4. Villa Engineer Abu Bakar – owner of the office. 5. New design for police station model (A) in western Region. 3

WORK EXPERIENCES:

• From 01/04/2022 up to date:

Main Leo A Daly office – Abu Dhabi

Follow up the office projects and design review for the projects under design:

90% inspection for Mediclinic – Airport Road.

Cath Lab project in Health point hospital.

Mediclinic 12 years – Al Noor Hospital for renewal floors from 2nd floor up to 12th floor.

New York University.

SP clinic in sea palace.

• From 15/03/2020 up to 31/03/2022:

Project: Majlis, Mosque and confidential building

Location: UAE - Abu Dhabi

Client: Musanada

Consultant: Leo A Daly Engineering Consultant

Project Cost: 122 million UAE Dirhams

Position: Senior Electrical Engineer Supervisor

Project Description:

Supervision of underground building which consists of sub-station for shelter, generator room with two generators, chiller room, fans and all basement room is protected by gas tight and seismic protection.

All electrical & low current systems work.

Sub-station for all projects including the main electrical room in basement and all panels of mosque and majlis, check the design and load schedules, cable sizing & VD calculation.

Lighting Level calculations wherever required and Luminaries selection.

Electrical design drawings preparation.

Preparation of schematic wiring diagram for LV systems & ELV systems.

Preparing electrical specification and list of manufacturers.

Supervision for Lighting and Power, Fire Alarm, Telephone systems.

Erection and commissioning of L.V panels and cables.

• From 11/09/2017 up to 14/03/2020

Project: Federal Supreme Court, Public Prosecutor Office& Fatima Bent Mubarak Sports Academic

Location: UAE - Abu Dhabi

Client: Musanada

Consultant: Al Torath International Engineering Consultant Project Cost: 20 million UAE Dirhams

Position: Senior Electrical Engineer Supervisor

4

Project Description:

Supervision of all electrical & low current systems works.

Substation design and load schedules preparation, cable sizing & VD calculation.

Lighting Level calculations wherever required and Luminaries selection.

Electrical design drawings preparation.

Preparation of schematic wiring diagram for LV systems & ELV systems.

Preparing electrical specification and list of manufacturers.

Supervision for Lighting and Power, Fire Alarm, Telephone systems.

Erection and commissioning of L.V panels and cables. From 27/04/2016 up to 10/09/2017

Project: Abu Dhabi Future Schools Programme – Phase 6 (Package 1, 6, 7, 8 & 10) Location: UAE - Abu Dhabi and Al Ain

Client: Musanada

Consultant: Al Suweidi Engineering Consultant

Project Cost: 455 million UAE Dirhams

Position: Senior Electrical Engineer Supervisor

Project Description:

Supervision of all electrical & low current systems works.

Substation design and load schedules preparation, cable sizing & VD calculation.

Lighting Level calculations wherever required and Luminaries selection.

Electrical design drawings preparation.

Preparation of schematic wiring diagram for LV systems & ELV systems.

Preparing electrical specification and list of manufacturers.

Supervision for Lighting and Power, Fire Alarm, Telephone systems.

• From 03/12/2014 up to 23/03/2016

Project: Rehabilitation Health Centre.

Location: UAE – Shakhbout City – Abu Dhabi

Client: Musanada

Consultant: H.D. P (OVER SEAS) LTD. Consultant Office Project Cost: 150 million UAE Dirhams

Position: Senior Electrical Engineer Supervisor

Project Description:

Substation design and load schedules preparation and erection & commissioning LV panels.

Cable sizing and voltage drop calculations.

Lighting Level calculations wherever required and Luminaries selection.

Preparation of schematic wiring diagram for LV systems & ELV systems. 5

• From 03/11/2013 up to 30/11/2014

Project: Abu Dhabi Future Schools Programme – Phase 4 (Package 1, 2, 3, 4, 5 & 6) Location: UAE - Abu Dhabi and Al Ain

Client: Musanada

Project Manager: Project Analysis & Control Systems Co. WLL (PROJACS) Project Cost: 600 million UAE Dirhams

Position: MEP Manager

Project Description:

Project management for the project including 6 schools in Al Ain and Abu Dhabi.

Manage & coordinate the construction procurement process related to his discipline.

Manage and coordinate the discharge of MEP contractor’s obligations as defined in the construction contracts

Manage and coordinate the discharge of MEP consultants’ duties as defined in the construction contracts and the consultancy agreement.

Keep all parties fully informed of all rules, regulation and procedure relating to site safety and monitor and confirm that these are complies with by all parties.

Manage the preparation of a testing and commissioning programme.

Manage and coordinate the handing over to the Employer.

• From 03/01/2010 up to 18/10/2013

Project: Detainees and Courthouse.

Location: UAE - Abu Dhabi

Client: Judiciary Department-Technical Committee

Consultant: Dar Al Omran (DAO) Consulting Office

Project Cost: 670 million UAE dirhams

Position: Senior Electrical Designer and supervision Engineer Project Description:

Design and supervision of all electrical & low current systems works.

Substation design, load schedules preparation, cable sizing and voltage drop calculations.

Lighting Level calculations wherever required and Luminaries selection.

Electrical design drawings, schematic wiring diagram for LV systems & ELV systems.

Preparing electrical specification and list of manufacturers.

Supervision for Lighting and Power, Fire Alarm, Telephone systems.

Erection and commissioning of L.V panels and cables.

Erection and commissioning of Low Current Systems. 6

• From 06/04/2009 up to 31/12/2009

Project: ADD Classrooms for some schools.

Location: UAE - Abu Dhabi and Ban Yas

Client: Musanada

Consultant: Winner Consulting Engineers

Project Cost: 30 million UAE dirhams

Position: Senior Electrical Designer and supervision Engineer Project Description:

Supervision Electrical Engineer for installation in building including Lighting and Power, Fire Alarm, Telephone systems.

Design of all electrical & low current systems works, studying the tenders and price analysis.

Erection and commissioning of L.V panels, Indent cable size C.B ranges & laying cables from MDB`S to SMDB`S to DB`S.

Earth and Lightning protection system.

Erection and commissioning of Low Current systems.

Halcrow International Partnership – Abu Dhabi

• A) From 01/09/2008 up to 31/03/2009 (Part – 1)

Sr. Electrical Design Engineer, Main office in Abu Dhabi. Phase 3B – Grandstand office building project, Pedestrian Bridge for ADNEC Client and Hard rock hotel in Abu Dhabi (Electrical design engineer) for the following activities:

Design of all electrical & low current systems works.

Substation design.

Load schedules preparation.

Cables sizing and voltage drop calculation.

Lighting level calculations wherever required and luminaries’ selection.

Electrical design drawings preparation.

Preparation of schematic wiring diagram for LV systems and ELV systems.

Preparing electrical specification, B.O.Q and list of manufacturers.

• B) From 09/11/2005 up to 31/08/2008 (Part – 2)

Project: Sheikh Zayed Bin Sultan Al Nahyan Mosque, Phase – 2 Location: UAE - Abu Dhabi

Client: Public Works Department (PWD)

Consultant: Halcrow International Partnership

Project Cost: 900 million UAE dirhams

Position: Senior Electrical Supervision Engineer

Project Description:

The mosque is one of the highest profile projects in UAE & is considered as 3rd largest in the world.

7

This phase of the project is valued to be $950 million and is being constructed for Abu Dhabi Municipality.

Phase – 02 is the final phase of construction and include the construction of the finishing and MEP works include installation and commissioning of lighting system, Power system, building management system, public address system, fire alarm system and CCTV.

• From 01/09/2002 up to 07/11/2005

Projects: Police Station

Location: UAE – Khalifa (A) City – Abu Dhabi

Client: Public Works Department (PWD)

Consultant: Arab Experts Consultant (AREX)

Project Cost: 50 million UAE dirhams

Position: Senior Electrical Designer and Supervision Engineer Project Description:

Design and Supervision Electrical Engineer for installation in building including Lighting and Power, Fire Alarm system, Telephone systems.

Design and Supervision of all electrical & low current systems works.

Erection and commissioning of L.V panels, Indent cable size C.B ranges & laying cables from MDB`S to SMDB`S to DB`S.

Earth and Lightning protection system.

Erection and commissioning of Low Current System such as:

• Structured cabling system.

• Public address and Fire Alarm systems.

• Central television radios and dish system.

• Fire alarm system.

• From 21/12/1999 up to 30/06/2002

Project: Rehabilitation Health Centre

Location : UAE – Al Mafraq – Abu Dhabi

Client: Public Works Department (PWD)

Consultant: H.D. P (OVER SEAS) LTD. Consultant Office Project Cost: 140 million UAE dirhams

Position: Senior Electrical Supervision Engineer

Project Description:

Supervision Electrical Engineer for installation in building including Lighting and Power, Fire Alarm system, Telephone systems.

Design, studying the tenders and price analysis.

Erection and commissioning of L.V panels, Indent cable size C.B ranges & laying cables from MDB`S to SMDB`S to DB`S.

Erection and commissioning of Low Current Systems such as: 1. Public Address, Fire Alarm System, Disabled Call Syste and Induction Loop System. 2. Structured Cabling System.

8

• From 11/09/1999 up to 18/12/1999

Project: Majlis, Kitchen and Boundary (Sheikh’s Sultan Bin Zayed Al Nahian) Location: UAE – Sewehan – Abu Dhabi

Client: Public Works Department (PWD)

Consultant: Liwa Group Consultant Office

Project Cost: 143 million UAE dirhams

Position: Electrical Supervision Engineer

Project Description:

Installation in building including Lighting and Power, Fire Alarm system, Telephone, Earthing and Lightning Protection systems.

Erection and commissioning of L.V panels.

Indent cable size C.B ranges & laying cables from MDB`S to SMDB`S to DB`S.

• From 01/05/1997 up to 10/09/1999

Project: Polyclinic in Tawam Hospital

Location: UAE – Al Ain

Client: Public Works Department (PWD)

Consultant: Hospico Consulting Office (Sweden)

Project Cost: 50 million UAE dirhams

Position: Electromechanical Supervision Engineer

Project Description:

Installation in building including Lighting and Power, Fire Alarm system, Telephone systems.

Design of all electrical & low current systems works.

Erection and connection of Plumbing Station and its control panels.

HVAC: Chillers, air handling units, Fan Coil Units, variable air volume units, packaged units, split units, cold stores, exhaust and supply fans, chilled water pumping and distribution system.

FIRE FIGHTING SYSTEM: fire protection, water sprinkler, land hydrants, hose reels, carbon dioxide fire extinguishing systems.

HYDRAULICS: centrifugal and rotary pumps, submersible pumps, plumbing systems, wastewater disposal and drainage systems.

• From 01/10/1996 up to 30/04/1997

Project: 200 Low-Cost Houses

Location: UAE – Al Ain

Client: Public Works Department (PWD)

Consultant: Emirates Engineering Centre Consulting Office Project Cost: 200 million UAE dirhams

Position: Electrical Supervision Engineer

9

Project Description:

Installation in building including Lighting and Power, Fire Alarm system, Telephone, Earthing and Lightning Protection systems.

Erection and commissioning of L.V panels, Indent cable size C.B ranges & laying cables from MDB`S to SMDB`S to DB`S.

Design of all electrical & low current systems works, studying the tenders and price analysis.

• From 01/10/1994 up to 30/09/1996

Projects: Buildings and Streets

Location: UAE – Abu Dhabi

Contractor: Engineering Projects Establishment

Project Description:

Installation of all electrical & low current systems works.

Installation the street lighting for all the projects of the company.

Erection and connection of pumping station and its control Panel

Erection and commissioning of L.V panels and cables.

Earth and lightning protection system.

• From 04/10/1989 up to 31/08/1994

Project: Electric Middle Centre

Location: LIYBYA

Client: Ministry of Education

Position: Teacher for Electrical Subjects

Project Description:

Teaching for all electrical subjects for the technical secondary school.

Responsible for preparing the plans for the future projects.

Supervision for the electrical works for the project’s Centre.

• From 01/06/1986 up to 01/09/1989

Projects: Buildings and Streets

Location: United king of Saudi

Contractor: Arabian Roads & Building Establishment Project Description

Installation of all electrical & low current systems works.

Installation the street lighting for all the projects of the company.

Erection and commissioning of L.V panels and cables, Earth & Lightning Protection Sys.



Contact this candidate