C.V.
Name: Atteal Mohammed Wheeb.
Address: U.A.E. - Sharjah
Place & Date of Birth: Iraq-Basra, 29-6-1967
Marital Status: married, three children.
Academic level: B.Sc. Civil Engineering-University of Basra -Iraq. Graduation year 1989
The position: (project manager, project engineer, road engineer). My Permanent Address: U.A.E./Sharjah, King Faisel Street. Mobile: 009***********
Email: *******@*****.***
Summery
My Summery here, describe my experience that qualified me to occupied the following positions: (building construction project manager, building construction project engineer, road engineer), depending to my carrier in (Road Works, Earth Works, Building Construction Works, infrastructure works). Graduated in 1989, (30 years of works) occupying a position of Site Engineer and Project Manager.
The earlier 15 years in Iraq, As Site Engineer
the works
Earthworks works, road works, Steel structure
The last 15 years in U.A.E. As Projects Manager and Project Engineer The work to Authorities:
Municipality of Sharjah, D.P.W. of Sharjah, S.R.T.A., S.E.W.A., Etisalat, BEEAH
& Private sector.
(G+1, G+2 Building, Sport clubs, Roads, big scope Earthworks like Rail Embankment, landscaping, street IT Systems and lighting, services). Personality: well-organized civil engineer project manager with strong leadership skills to join our team.
As Project Manager :
*Managing Multi disciplines projects contents
*Assuring of Management and Execution of the project according to specification, drawing, and assure compliance with the contract in all aspects.
* Aspects of the performance of the project.
* Developing Project in accordance with the plans of schedule cost, quality, risk, resources, communications, and safety.
* Assure meet to the requirements of the HSE
* Resources preparations
* Define role, responsibilities, and authorities to team members.
* Liaises with the Subcontracts, suppliers and vendors, including strong negotiation to and maximization of the opportunities.
* Approvals to the change request when occurred.
* Communicate stakeholders along with project life.
* Early Identify and solving the issues or problems.
* As-built documents properly.
* Communication skills in English and Arabic.
Computer skills: Experience in working with Microsoft Word, Microsoft Excel,
(Microsoft Project), AutoCAD
Language: English, Arabic., U.A.E. Driving License. Other qualifications:
Affiliated member in Society of engineers U.A.E. Since 08 – 05 - 2007 Sessions for Safety (Zero accident policies).
Current Address: U.A.E. /Sharjah, King Faisel Street. Experience:
1-(June 2022 – September 2022) – Masarat Road Contracting PROJECT - KIZAD LIFE SCIENCES PARK – PHASE 1
CLIENT G42 Pharmaceutical Manufacturing LLC
China State Construction CSCEC
External Infrastructure Supplying and Installing
Position Project planning, coordination and Manager Duties: Manufacturing Planning, Coordination and Management 2-(September 2020 – October 2021) – Abu Ali transportation JV Desert Man Transportation Co. AS ((project manager)
• Construction of earth work - track rail embankment Construction of earth work
- track rail embankment with total length of 5.26 km included all Utilities such box culverts, services, sand mitigation, maintenance road, supply materials, technical issues, geotechnical tests, appropriates machineries supplying, etc.
• Value 14,200,000 DHS.
Client: Etihad Rail
Package 2F2 – Freight Facility Package
Consultant: JACOB
3-(April 2016 – July 2020) - Al Karnak Building Construction Co. AS/ P.M.
• Construction of New Building (Graduate Studies, M3-A) University of Sharjah)
(G+2 Floors) Contract Value 42,350,000 DHS.
• Construction of Al THIQA handicapped sports club in Khorfakkan City Contract amount 35,000,000 DHS. (G+ 1 Floor)
• AL NAHDA Tower. (G+ 5 Parking + 15 Floor + Helicopter platform) Contract Value 40,500,000 DHS
• Removal of AL Mamzer Island, (Balance Amount 1,350,000 DHS)
• Construction of jogging truck for the 2 parks “Khesha and Shagrafa”, mainly:
(Earthwork and Road work) Scope, “Contract amount 8,401,079.00 DHS 4-(September 2006- April 2016): Al Mashriq Road Contracting Co. /P.M. Earthworks Road work, Asphalt Road works, landscape projects, construction of public parks, infrastructure.
The client: Ministry of public work, Directorate of Public Works, Municipality of Sharjah, SRTA Ministry of Auqaf, and Many other companies, Halcrow, Parson, and private projects.
5- (December 2004- December 2005): Wasseal Al Emmar General Contracting CO. – Client: South Oil Company (S.O.C.) AS P.M.
Construction of (water injection station platform for oil fields at al Rumaila) north field Client: South Oil Company S.O.C. [Earth works].
6- (September of 2003 till November of 2004) BECHTEL \ Site Engineer The client; “I.I.R. RAILWAY Authority
subcontractor “BECHTEL “
the scope of the project: Extension (from Shuaiba to umm Qasser) railway Line of 56km length, the project included the following:
(Earth Works, construction of sub blast embankment, box culverts, utilities, and construction, installing of rail track, new intermediate train stations) and facilities. Duties was:
Issuing N.O.C., permissions with relevant authorities Coordinate with local official and private parties for new services and facilities, Meeting and Coordinate
/supervision between Bechtel-Iraqi railway authorities-the subcontractor. Performance and quality control (reporting monthly qualities and quantities) and issuing I.R., quantities, invoices. Documents, As Built Drawings. 7- (June 1997- April 2003): - Ibn Majed Company / AS Site Engineer
(Ibn Majed Company /which belongs to Iraqi marine special projects/ministry of military industries) activities: Earthworks, Civil Work, construction of steel shed structures, and special structures belong ship construction and open elec. earthling yards, industrial infrastructures
8- (April 1994-February 1997): AL MUTASEM CO. / Ministry of Residential and Construction / As Sub-Contractor
Client: (ministry of residential and construction) as a subcontractor, presidential palaces (interior roads and landscaping, a lot of facilities belong project) 9- (December 1992-December 1993): AL FAO GENERAL CO. (Ministry of Industry and Military manufacturing) / As Site Engineer,
(Earthworks Water Canal Construction) work included: construction of earthwork canal, pipe culverts, raising sub stations, poster station, Duties: Surveying, longitudinal profile to natural ground levels, Q.S excavations and backfilling quantities, appropriate equipment,skilled manpower, Planning, Issuing
(N.O.C. and permissions, meetings, Coordination, Mobilization for all above, Issuing reports, progress Monitoring, Solving, Performance, and quality control, safety site requirements, Management of materials qualities and site tests, Documentation for sector papers, As-built longitudinal profile drawing to design levels Preparation for the project and utilities, cash flow of the monthly budget. 9-(October 1989 to November 1992): Site Engineer at military projects Authority - (Asphalts Roads) / As Site Engineer,Duties: Surveying works and make a longitudinal profile to natural ground levels, Estimation of cut and fill quantities, prepare required equipment, Mobilization, writing weekly and monthly reports, Follow-up progress and acceleration of late activities in the site and solving problems
For more inquires or certification:
Mobile: 009***********
Email: omwhyeb@ yahoo.com