Post Job Free

Resume

Sign in

Substation Commissioning

Location:
Pudukkottai, Tamil Nadu, India
Salary:
25000
Posted:
September 13, 2022

Contact this candidate

Resume:

E-Mail: adsjyc@r.postjobfree.com

MURUGESAN Mobile: +971-*********

OBJECTIVE

To work in challenging environment that promotes development of current and new skills in a leadership or individual contributor role.

PROFILE

8 Years Experienced senior Technician.

Complete commitments to work towards achieving favorable results.

Ability to grasp quickly of any kind of work with learn-more attitude.

Dedicated, Determined, Devoted the given assignment.

Complete the task at schedule time.

Nature of work:

Factory –Control and Relay panel Wiring. (ABB,SIMENS,GE,SEL,Etc..,)

Installation of cable trays and control cable laying as per cable and termination schedule.

Performing cable termination and Glanding work s per schedule.

Modification of scheme and integration of protection system.

Assisting the team lead in perform the installation, Testing and Commissioning of power transformers.

Follow of safety procedures during Testing and Commissioning of electrical equipment's.

AC/DC scheme checks at Substation.

Power cable laying, dressing and Termination up to 360 Sq mm.

Panel Board connection.

Cable pulling pole Erection.

Lead Preparation electrical cable joints.

Installation of HV, LV MCC controls.

Fixing of Busbar.

modification of protection scheme.

Replacement of CT, VT and protection relays.

Laying and termination of fiber optic cables.

Removal of Multiplex panels.

Control and Relay panel wiring.

Testing kits setups.

Secondary injection Test Kit : OMICRON(CMC 356,256,256+)

Primary Injection Kit : OMICRON (CPC 100)

CT Test Kit : OMICRON (CT ANALYZER )

Circuit Breaker Test Kit : MEGGER EGIL

Contact Resistance Kit : SCOPE (CRM100)

QUALIFICATION

ITI-ELECTRICAL completed in May-2010

CAREER SUMMARY

Senior Technician DNJ Energy LLC, UAE. Feb 2015 to till date Technician Blue Beach Technical LLC, UAE Feb 2012 to Feb 2015 CAREER HISTORY

With DNJ ENERGY LLC

From Feb 2015

Working as Senior Technician.

Project# DEWA BATTERY CHARGER AND INVERTER REPLACEMENT AT D, E & G STATIONS. Client : M/S HARIS AL FLAQ

Executed activities

Installation of inverter and battery panel.

Cable laying, glanding and termination.

Corrective maintenance of weak/faulty cell in battery bank.

Assist testing and commissioning of various activity.

Installation of GSM based temperature monitoring for battery room and substation.

Implementation of 5S in battery workshop.

AC/DC Circuits Scheme Checking.

Project# 33/11kV Brick Build Primary AADC SUBSTATION. Client : M/S ABB

Executed activities

Assist for 33/11kV Protection and Control panel Testing.

Installation, Panel Wiring Checks, DC mix-up Checks.

Panel Modification As per the Approved Wiring Schedule and Drawing.

Relay Fixing, Removing & Wiring.

Supporting for HV Testing.

GA Checks & Arrangement As per the diagram.

Project# SEWA-132/33kV SUBSTATION.

Client : M/S ABB

Executed activities

Assist for 33kV single bay add-on panel erection and HV insulation testing.

Assist the team for installation, Testing and commissioning for power Transformer.

Assist Testing and commissioning of CT/PT, isolator and auxiliary relay test.

DC scheme check and Battery bank check.

Project# DEWA- BATTERY REPLACEMENT.

Executed activities

24V/50V/110V/220V battery preventive maintenance on quarterly basis.

Corrective maintenance of weak/faulty cell in battery bank.

Assist testing and commissioning of various activity performed in battery banks at Dubai-Aluminium

Installation of GSM based temperature monitoring for battery room and substation.

Implementation of 5S in battery workshop.

AC/DC Circuits Scheme Checking.

Project# MALL OF EMIRATES PROJECT.

Client : M/S ABB

Executed activities

Assist the team for installation, Testing and commissioning for power Transformer.

Performing cable termination and Glanding work s per schedule.

AC/DC Circuits Scheme Checking.

Installation of cable trays and control cable laying as per cable and termination schedule. Project# DUBAI MALL PROJECT.

Client : M/S DULAND

Executed activities

Installation of cable trays and control cable laying as per cable and termination schedule.

Assist Testing and commissioning of CT/PT, isolator and auxiliary relay test.

Panel Board connection, AC/DC Circuits Scheme Checking. Project# DUGAS PLANT PROJECT.

Client : M/S SCHNEIDER ELECTRIC

Executed activities

Installation of cable trays and control cable laying as per cable and termination schedule.

Protection and control panel wiring and scheme check.

AC/DC Circuits Scheme Checking.

Project# DEWA REMOTE END MODIFICATION.

Client : M/S ABB-CE227

Executed activities

Installation of cable trays and control cable laying as per cable and termination schedule.

Installation of protective numerical relays.

AC/DC Circuits Scheme Checking.

Performing cable termination and Glanding work s per schedule.

Laying and termination of fiber optic cables.

With DNJ INDUSTRIES LLC.

General arrangement of control and relay panel.

Wiring and scheme checking of 220/66/21kV Transformer protection panel, RTCC panel, Busbar protection panel, control panels, Networking panel, Inverter panel.

Assist for testing of numerical relay setup.

Live panel activities and modifications up to 400kv DEWA, SEWA, AADC Substations.

General and final panel inspection checking of panels. PERSONAL DETAILS

Date of birth : 25.06.1990

Gender : Male.

Marital Status : Single.

Nationality : Indian.

Passport No : J2912310

DECLARATION:

I hereby declare that the above given information’s are true to the best of my knowledge and belief.



Contact this candidate