EDWIN N. IRINCO

: Project Manager / Electrical Engineer and Estimator

PERSONAL INFORMATION

CONTACT NUMBER : 02-946-3194; 090*-***-****; 091*-***-**** adsjrz@r.postjobfree.com

STATUS : Married

BIRTH DATE : April 7, 1974

EDUCATIONAL ATTAINMENT : Bachelor of Science in Electrical Engineering SCHOOL ATTENDED

College : Technological Institute of the Phils. ( 1994 – 1997 ) MAPUA Institute of Technology ( 1991 – 1994 )

High School : Trinity College of Quezon City ( 1987 – 1991 ) Elementary : Marcelo H. Del Pilar Elem. School ( 1981 – 1987 ) PROFESSIONAL PERMIT : Registered Electrical Engineer, 0016481, April 22 1998 AFFILIATION : IIEE – CRC – Saudi Arabia Chapter ( Regular Member ) SAUDI COUNCIL OF ENGINEERS ( 51275 )

SPECIALTY AND LINE OF WORK : Electrical & Mech. Works ( WTP, WWTP & STP Works ) Electrical Works ( Substation 230KV, 138KV & 69 KV) Electrical & Mechanical Quantity Estimator

Electrical Design & Lay-out

Buildings and Infrastructure Works

P a g e 2 4

TOTAL WORK EXPERIENCE AS ELECTRICAL ENGINEER: + 20 YEARS ELECTRICAL EQUIPMENT SYSTEM INTEGRATION ( EESI )

Project 8, Quezon City Philippines

July 4, 2017 to Present

JOB DESCRIPTION: Project Delivery Manager (Industrial – Electrical, Automation & Instrumentation)

Delivering Particular Project to Completion and Providing the following : o Overall insight to run the Project with proper number of Manpower, materials and equipment o Properly Manage the Project base on schedule to meet deadlines o Study scope of work and provide Management continues update as per progress and accomplishment o Proper representation and documentation to clients o Preparation of Budget Allocation Cost for project proper budgeting for outsource works Project Presently Manage:

o 10ML Molino Reservoir and Pumping Station – Under Mettalite Builders, Client - MAYNILAD o 50ML Rizal Water Rehabilitation System - Under OTV-Veolia, Client – MWCI o Balara Treatment Plant 1&2 Flowmeter and Water Analyzer - Client – MWCI o Balara Treatment Plant 1&2 Installation of Circuit Recloser - Client – MWCI o Balara and San Juan Treatment Plant – Pressure Bays- Client - MWCI o Installation of Seismic Sensor system – STEPAN, Baun Batangas o Raise Roof Lighting for Module 1 to 8 – Universal Rubina Corporation, Calamba Laguna o New STRO Line 4 – PEPSI Philippines, Sto. Tomas Batangas o New PRO Line –AMCOR Tobacco, Cainta Rizal

TRANS SAUDIA CONTRACTING COMPANY

Riyadh, Kingdom of Saudi Arabia

April 17, 2013 to January 4, 2017

JOB DESCRIPTION: ELECTRICAL ENGINEER

Over all Electrical Work In-charge

o MV works design and Installation as per SCECO lay out standard o LV Panel works design and Installation as per Consultant / owner requirements o Power and Lightings System layout and Installations o Low Current system Layout and Installations

o Building Management System

o Smart Home System

o Bus Ducting works

o Earthing and Lightning Protection System

o Project Tendering for Unified Contract Project ( SEC ) Project attached / working on :

Abunnayan Villa, Riyadh

Al- Kharj Mall Plaza,

Mc Donald’s ( Completed 6 branch in Riyadh )

Saudi Fransi, Head Office, Riyadh Ground floor Renovation & basement Cash Center Mobily Technical Building ( Tier 3 ), Obhur Jeddah Riyadh Bank, Musadia Jeddah

New SACA Facility and ATC Modifications, Jeddah KSA Saad Edden Sweets and Pastries Factory

KUDU Warehouse

GENERAL COMMISSION FOR TOURISM & ANTIQUITIES :

The National Program for Development of Handicrafts HAIL BRANCH, Kingdom of Saudi Arabia. P a g e 3 4

JABRIA INDT’L BLDGS CONTRACTING Co. Ltd.

Riyadh, Kingdom of Saudi Arabia

November 2009 to October 16, 2012

JOB DESCRIPTION : ELECTRICAL ENGINEER :

Cost & Estimate on materials requirements for tendering ( Electrical works)

Study and take-off materials for Value Engineering

Prepare bid documents

Prepare Electrical design and Shop drawing

Prepare MV design, Transformer layout and System Operation Estimated Electrical works for Buildings, Warehouse and Various Facility Estimated Electrical works for Various Military & Government Facilities Estimated Electrical works for Commercial and Residential Establishments Design and Estimated Electrical Works for Lump sum Cost Project Proposal ENGINEERING EXPERIENCE: 11 YEARS FOR LOCAL ( PHILIPPINES ) ROMAGO INCORPORATED : July 2007 to October 2009

JOB DESCRIPTION :

AS PROJECT ENGINEER

In charge of Electrical and Mechanical work.

o Medium Voltage Works, Transformer layout and Design o Meter Center

o LV Panel Works system and layouts

o Power and lightings

o Exhaust System Layout

Provide main office materials and accomplishment status of the project

Preparation of progress billing

Prepare materials take-off for every change order / additional works

Estimation Works for High Rise Buildings for Electrical PHASOR CORPORATION : April 2007 to June 2007

JOB DESCRIPTION :

AS PROJECT ENGINEER

In charge of Electrical and Mechanical work.

o Medium Voltage Works, Transformer layout and Design o Meter Center

o LV Panel Works system and layouts

o Power and lightings

Provide main office materials and accomplishment status of the project

Preparation of progress billing

Prepare materials take-off for every change order / additional works P a g e 4 4

PHESCO INCORPORATED : Dec. 1998-Apr.1999 / May 1999 to April 2007 JOB DESCRIPTION: ELECTRICAL ENGINEER

Over all Electrical and Mechanical Work In-charge o LV Panel works design and Installation as per Consultant / owner requirements o Power and Lightings System layout and Installations o Low Current system Layout and Installations

o Building Management System

o Earthing and Lightning Protection System

Substation Facility for 230 KV, 138KV and 69 KV

- Retiring and Replacement of Existing Switchyard Equipment

13.8 KV Distribution Line and Transformer Pole Tap Sourcing

Water and Waste Water Treatment Plant Facility

Booster and Lift Pump Station for Water and Waste water Treatment Plant

Electrical and Mechanical tendering works

Project Completed, Estimated, Handled and Supervise

Construction of Boracay Environment and Infrastructure Project Phase 1 and 2, Aklan, Philippines

Construction of Baguio City Sewerage Treatment Plant, Baguio City, Philippines

Rehabilitation of Bataan Economic Zone, Integrated Sewerage Treatment Plant, Mariveles Bataan, Philippines

Various Facility for Biñan Substation Project, Rehabilitation of 230 KV Switchgear Equipment for TRANSCO in Laguna, Philippines

Estimated and Won Construction

o Dingle Substation Project

o Nasugbu Water District ( Electro- Mechanical Works ) o Urdaneta Water District ( Water Pipe laying & Reservoir ) ARB TECH : June 1998 to November 1998

AS TECHNICAL ENGINEER:

- In–charge of Submittals of shop drawing prior to installation

- Evaluate electrical plans and costing as basis of agency estimate for all electrical works under Angel Lazaro Consulting Firm