CURRICULUM VITAE
RICHARD SOWAH
** ******* ********* *****, *******
PLOT NO. 183 ADIEMBRA RIDGE, TAKORDI GHANA
MOBILE: +233-********* / +233-*********
STATUS : MARRIED
ACADEMIC AND PROFESSIONAL QUALIFICATION
INSTITUTION QUALIFICATION YEAR
Takoradi Polytechnic H.N.D Mechanical Engineering (Air /Ref) 1999-2002
Takoradi, Ghana
Engineering Institute of Fundamentals of process plant Layout and 2011
Technology piping design
Ghana Secondary Technical School S.S.S.C.E 1998
Takoradi, Ghana
Ridge International School B.E.C.E 1995
Takoradi Ghana
8
OBJECTIVE:
To secure an Electrical and Mechanical Engineering position (electromechanical) maintenance in the field of Air condition and Refrigeration / HVAC Building facility management, Automobile coaches (Electrical and Air condition) position with an organization that will enable me to grow professionally while contributing to the company’s goals and objectives. An excellent team player.
SUMMARY OF SKILLS:
In-depth knowledge and experience to design, install, maintain, commission, estimate, repair water chillers, Boilers saw mill machines, turbines air conditioning/refrigeration air dryers, Automobile generators, general electrical works, Automobile electrical works, Kitchen equipment, ventilation equipment, Ducting plumbing.
Ability to design estimate install central air condition systems
Ability to overhaul and service refrigeration compressors
Material management there by reducing maintenance cost to bearers minimum without affecting operations.
Very good negotiation with vendors and ability to reduce administration cost.
Ability to overhaul and repair pumps.
Ability to diagnose equipment failures and provided solutions.
Good knowledge of operation and maintenance of utility equipment’s.
Ability to operate and maintain boilers.
Operational knowledge of electrical circuit and schematics.
Ability to walk safely and effectively with all types of power and hand tools.
Ability to handle busy workload.
Can work in challenging situations to provide desired results.
Good technical report writing skills.
Hardworking with excellent leadership communication and interpersonal relationships.
Ability to prepare contract documents.
Ability to prepare equipments reports failure analysis.
Ability to forecast, organize and execute al work under request.
WORKING EXPERIENCE:
June 2016 – date valeaTerminal Bus systems (South Africa)
Contractor (West Africa)
Pre delivery importation (P.O.I) for all coaches shipped to West African sub-region fitted with spheros air condition systems. Manage after sale services for the warrantee period. (approximately 1000 buses delivery so far with brands from India Ashokland, Tata China, Golden dragon Hanghuai and Brazil macropolo buses with scania, VIN chasises.
Bus wining (ticketing and tracking devices)
With my input the company is able to save about 30% cost on warrantee services quick and effective response to client and offering after sales maintenance and training to customers’ technicians. Sales of spheros Air condition has improves by 45% due my effort as an after sale support in the region.
Smakers Eatery and Hotel
Faculty Manager
General facility management of Ten (10) eatery / hotel outlets in the country was able to reduce maintenance (Administration cost) by 50% by refurbishing or replace equipment that was constantly breaking down reducing down time and cost.
A.B.C. Transport PLC Nigeria – 2004-2006
Facility Management or Coaches
My addition to the company reduced the administrative cost by 35% in the field of maintain-introduction of Refrigeration cycling plant which gas about 25-30% of refrigerant (freon) usage and other smart and effective workshop practices that save time and cost as well.
Sarmatex Timber and Plywood Company Limited (Samreboi) Ghana.
Engineering Management Training for 2 years and subsequently Electrical Manager.
Assisting the Head of Electrical Department in running the electrical department.
Also I was able to save management Administrative Cost about 20% due refurbishment and replacement of machines that were not running effectively and thereafter building a strong maintenance team.
Tag Nigeria Limited – 2006-2011
Mechanical Engineer (Estimator and Designer)
Tendering and bidden for the company. The company got close to 45% of all the competitive tenders I presented on behalf of the company was able to reduce material cost by 30% during installation.
Ghana education service (National Service)
Community Facilitator (2002-2003)
Kwabre District (Ashanti Region)
Assisting in improving quality of primary education in the district.
Assisted in reducing teenage pregnancies by 5%
Assisted the community in improving the attendance pupils
Assisting in building public school toilet and other social amenties to maintain the children in school.
Assisting teaching and learning of mathematic by the time my services was over students in the community had improved their reading and mathematics habit by about 10% enrolment had gone up to 20%.
Understanding of basic mathematics has gone up by 5% teacher student relationship had gone up by 10% parents attitudes towards education has change positively.
Ghana Naval Dockyard – 2001-2002
Industrial attachment / Apprentice in Mechanical and Electrical
Engineering Projects Handled
Design Supervision and installation of Central Air-Conditioning (Radio and Television Studio) T.V.C. Recording Station
Lagos Nigeria
Brief – I designed (Project drawings heat load calculation) and supervision and installation testing and commissioning and handing over approximately 150 tons Of cooling 400 square metres of ducting with Ducted Package with (petra-make). The company was able to save about 30% on the material cost due to the economical way I manage the installation works and economic design.
Design Supervision of Central Air Condition
At Niger House (FNB) Nigeria
Replacement of unit from chilled water systems to direct Expansion (Dx) ducted split units (upon my recommendation) for easy maintenance and cost effective. This was approximately 250 tons of Cool (units of various site ducted split units petra-make) was able to beat down the allocated budget by 35%.
Rehabilitation of Air Cooled Chillers and Fan-Coils
At Protea Hotel Oakhood Park Leki Lagos
Brief – The customer initially called me to give an estimate for complete replacement of all the Air Condition units which has been working under capacity since it installation.
On my recommendation I argued for rehabilitation which was just a fraction of the cost if the entire units were to have been replaced approximately 500 tons of cooling.
Design Supervision and installation of VRA Systems for private Residential House in Imo state Nigeria (Approximately 30% of the proposed budget was reduced).