Post Job Free
Sign in

Document Controller Architectural Designer

Location:
Manila, Philippines
Posted:
August 29, 2022

Contact this candidate

Resume:

ANWAR Y. TAÑALA

PRC –REGISTERED LICENSED ARCHITECT

LICENSED NO. 0029952

***-* *** ********* **. Buhangin, Davao City, Philippines 8000

Contact No. : +63-945******* – PHILS.

Email Address: *****.******@*****.***

Skype i.d : anwar.tanala1

WORK EXPERIENCE

Contractor/Architect

PRIVATE CONSTRUCTION (SELF-EMPLOYED)

299-A San Francisco St. Buhangin, Davao City, Philippines 8000

Date: Jan. 2017 to Present

Duties Performed:

Construction drawing development.

Building Designs.

Overall in charge of the project implementation.

Project Undertaken:

Residential Buildings

Mr& Mrs Gerard Rajoo 2 Storey Residential Building

Mrs Noreen Peñnaueva 2 Storey Residential Building

Mr. & Mrs. Maximino Gulmayo 2-Storey Residential Building

Mr. & Mrs. Art Milan 2-Storey Residential Building

Mr. & Mrs. Dexter Wong 2-Storey Residential Building

Mr. & Mrs. Eric Robinos 2-Storey Residential Building

Dr. Apolonio Bernardo 2-Storey Residential Building

Dr. Apolonio Bernardo 2-Storey Residential Building

Chapel/Religious Buildings

STo. Nino Chapel-Davao Del Norte

Virgin De los remedios Adoration chapel. Toril Davao city

San Lorenzo Convent-Talomo Davao City

Commercial Building

Shunem integrity residence -3 storey Hotel Bldg,

2 Storey commercial building,

Mr. Joel Deligero- 3 Storey Commecial building

Mr & Mrs Dowey Calunod 8 Doors Commercial Building

Mr & Mrs Julio Fuego 2 Storey Commercial Building

Site Architect Architectural and structural dept.

Royal Commission project 3

BONG KYUNG CONTRUCTION LTD.

Date: May 2017 to October 2017

Yanbu, kingdom of Saudi Arabia

Client: Royal Commission

Scope of Work: Housing project

Duties Performed:

Direct Supervision and implementation of architectural works

Preparing of schedule of works

Coordinating with the parcel engineer

Coordination of Consultant

Project Undertaken:

167 parcels strorey w/ roof deck residential building

Document Controller Electromechanical Dept.

Zone 3, king Abdullah financial district

SAUDIBIN LADIN GROUP/ PUBLIC BUILDING AND AIRPORT DIVISION

Date: February 2010 to November 2012

Riyadh, kingdom of Saudi Arabia

Client: Riyadah investment Company

Scope of Work: General contract of High rise Building.

Duties Performed:

Maintaining The Status log Of Drawings

Preparing the shop and design drawings for submittal to the consultant

Coordinating with the parcel engineer

Nominated replacement as Project/Document Controller

Project Undertaken:

12 High rise Mix used building Of zone 3 kafd project

Senior Architect

Engineering Department – Architectural Section

UGNAYAN BUILDERS DAVAO CORP.PHILIPPINES

Date: June 2013 to June 2014

Ph.1 El Rio Vista Bacaca, Davao city Philippines

Duties Performed: (in a multi-discipline and multi-cultural team setting)

Building Designs (floor plans, sections and elevations site development).

Building aesthetic design for Building Perspectives.

Knowledge to operate 2D Auto Cad and editing Cad Drawings.

Extensive shop drawings submittal reviews.

Maintain project schedules.

Assisted on the infrastructure works of other disciplines.

Meeting with the owner

Coordinating with other design consultants

Supervising the update of construction

Project Undertaken:

6 storey Las Casitas Hotel Building

3- Storey Holly cross of mintal High School Building

4-Storey Immaculate Of heart of mary School building,Mati City

Complex Warehouse Buildings

Golingay Hospital Level 1 hospital, Padada Davao Del Sur

Architectural Designer

Operation Department

Rieta and Pagcaliwagan Architects

Seravilla Bldg, Rizal Ext. Davao City, Philippines

Date: June 2005 to November 2010

Duties Performed:

Shop drawings submittals reviews.

Monitored progress and workmanship on site

Attended regular site meetings and organize work

Coordinated with subcontractors and design team.

Inspected materials delivered to site for quality and compliance with standards.

Inspected workmanship on site to ensure conformity to specification and acceptable standards.

Check on work progress to ensure project schedule is maintained.

Project Undertaken:

Cluster of Mix-used Building

Gawad kalinga Housing Projects 100 Housing Units

High End Residential Buildings

Beach Resort 4 Hectares Development

TECHNICAL SKILLS

2D AutoCAD (Architectural)

Computer literate

Manual Drafting

Estimate

Preparing Bill of materials

Preparing Specifications

EDUCATION

Bachelor of Science in Architecture

University of Mindanao

Davao City, Philippines 8000

Trainings and Seminars

CAD 1 (Fundamentals of AutoCAD 2000 2D System)

Nth Geographic’s & Geometrics

J.P. Laurel Avenue, Davao City

May 20, 2003 to July 05, 2003

Leadership in Energy and Environmental Design (LEED) Seminar

Green Architecture (GA) 2011 Seminar

Uap-Mbap Riyadh Chapter

Al-Mutlaq Hotel

Old Airport Road, Riyadh KSA

Organization

Philippine Regulatory Commission

Registered licensed Architect(RLA) Licensed No. 0029952

Integrated and Accredited Professional Organization of Architects (IAPOA)

IAPOA # 27755

Philippine Institute Of Architects (PIA)

Davao Chapter

Davao city Philippines

Master Builders Association of the Philippines (MBAP)

Riyadh Chapter

Riyadh Saudi Arabia

CHARACTER REFERENCE

Arch. Neill P. Pagcaliwagan,pia

Rieta & Pagcaliwagan, architects

Managing Partner

Dr. 7 Seravilla Bldg. Simeon De Jesus St. Davao City

+63-092********

Arch. Dandy Gomez,pia

Architect

DG Architects

Go Bldg. JP Laurel Avenue Davao City

+63-092********

Arch. Michael John Cordova,pia

MGS Construction

Architect

Camella North Point, Matina Davao City

+63-092*******

I hereby certify that the above mentioned statements are true and correct to the best of my knowledge.

Ar. ANWAR Y. TAÑALA

Applicant



Contact this candidate