ARSHAD ALAM
*********@*****.***
CAREER OBJECTIVES
To initiate my career in a technical organization where I could utilize my strong conceptual base technical knowledge and provide innovative solutions to technical problems. CV SUMMERY
5+ Years Gulf Experience of MEP Field
2 Years Indian Experience Of Commercial Construction Building EXPERIENCE
UAE Driving License : Yes
Age : 31
Nationality : Indian
Marital status : Single
2014 B-Tech in Electrical & Electronics
Engineering. 74.5%
West Bengal University Of
Technology, Kolkata, India
2009
12th (HSE)
Bihar School Examination Board Patna, India
68.6%
2006
10th (SSLC)
Bihar School Examination Board Patna,
India
53.8%
PROJECTS UNDERTAKEN
Duty and Responsibility:
Analyzed and Executed of IFC and Shop Drawing as per Standard Interpret Distribution SLD.
Coordinate with civil and MEP Team for site Coordination
Prepare the material submittal, Method statement, and inspection test plan of Electrical Service as per QCS, kaharama Standard.
Monitor compliance with regulations, make an initial inspection during the first phase of construction, and follow up with further inspections throughout the construction project.
Check the NCR and proper follow-up with the site supervisor.
Prepare As-Built Drawing of LV and ELV System According to Site Work.
Managing CM & PPM activities using CAFM/CMMS software, PPM schedules, KPI reports and work action plans and checklist.
Involvement in preparation of inventory list, quotations, permit to work, various reports, and orders like MRF, GRN, BOQ, PWT, LPO, etc.
Conducting Periodic training and toolbox talk to staff members and ensuring Safety at the workplace.
Reviewing of parameter reading reports for various equipment and preparing daily and monthly Reports.
Knowledge of Testing and commissioning of 11kv, LV panel, Generator, UPS, Fire Alarm System and Security system, Nurse call System, PAVA
Maintaining DB, SMDB, light, power, ATS, and capacitor bank. Generator, UPS, Sliding door, etc.
Provide technical supervision to team members to ensure that assigned tasks are being completed to required standards. Technical Skills & Competences
Skilled in problem-solving and ability to handle multiple functions in a high-pressure environment.
Excellent coordination with clients and sub-contractors, cross- functional coordination.
Asset management system, incident report, snag sheet, RFP, PR, and site submittals works.
Familiar with norms and regulations of international and national organizations: ASHRAE, DSF, HTM,QCS, IEC, KAHRAMAA, QCDD, and Organization Policies.
Hbk Engineering Services
Current Executed Project:
Military Medical Center
Hospital Doha Qatar
Jan 2021 to till Now
Position : Electrical Eng
Previous Executed Project
Lusail Iconic Stadium, Doha
April 2019 to 2021
Position: Electrical Eng
Al Mariah United Group
Previous Executed Project:
Al Gharbia Hospital Abu
Dhabi, UAE
March 2017 to Dec 2018
Position: Electrical Eng
Previous Executed Project
Ambulatory Healthcare
Center, Al Ain, UAE
March 2016 to March 2017
Position: Electrical Eng
Praveen Electrical Pvt Ltd
Previous Executed Project
Hotel Holiday Inn Chennai
India,
May 2014 to Feb 2016
Position: Electrical Eng
April 2019
TO
StIll Continue
March 2016
TO
Dec 2018
May 2014
TO
Feb 2016
.
SOFTWARES & TOOLS
Strengths:
Hard working and discipline,
Sincerity and confident
Quick Learner & Punctual,
Good communication skills
Hobbies and Extra-Curricular Activities:
Playing chess, Surfing net & Reading books
Personal Information
Father’s Name: Aftab Alam
Date of Birth: 15th February 1991
Language Known: English & Hindi
Address: Vill-Babhangawan,p.o-Aunsi
Distt-Madhubani,P.S-Bisfi
State-Bihar,pin code-847121
Passport n : L3004608
DECLARATION
I hereby declare that all the above mentioned details are true to the best of my knowledge and belief and I bear the responsibility for the correctness of the above mentioned particulars.
Arshad Alam
Duty & Responsibilities
Designs and budget estimates.
Preliminary Designs And Feasibility Studies.
Calculation sheets and computer facilities.
Coordinates with other trades.
Final construction working drawings.
MEP Space Requirements.
Value Engineering Studies and issuing the reports.
Shop Drawings For Projects Designed By Others.
Review and comment on the shop drawings, materials, and As-Built Drawings Submitted By the Contractor.
Ensure that the contractor complies with approved shop drawings in terms of design, materials, and Workmanship Standards.
Technical Reports And Recommendations.
Testing and commissioning related works after completion of construction and ensuring Its compliance with specifications and standards.
Wide experience in the design of healthcare facilities, Commercial and residential projects including MEP systems Such as Fire Fighting, Medical Gases, BMS, traction power systems ( Elevators & Escalators ) plus all Electrical systems LANGUAGES:
ENGLISH,HINDI
AutoCAD Z W CAD
Photoshop Primavera
ETAP MATLAB
MS Office CAFM