Experience Summary – Totally 5 Plus years of experience in Installation, Service, Testing, Commissioning and Maintenance of HT/LT system, UPS, DG, Fire alarm
Professional Experience :
NAME OF THE INDUSTRY
DURATION
AREAS OF EXPOSURE & DESIGNATION
YEARS
DHEVADHARASHINI ENTERPRISES
CHENNAI
5-YEARS
“ELECTRICAL SITE ENGINEER”
JUNE 2014 to SEP 2019
ESSENN POWER CONTROLS PVT LTD CHENNAI
STILL
“ELECTRICAL SITE ENGINEER”
2022
Computer Skills:
Operating System : Windows 7 & 8, XP
Software :PSIM,MATLAB,E-CAD,MS-OFFICE
Job Responsibilities
ELECTRICAL SITE ENGINEER
Execute the site with the reference of single line diagram, Builders work, Reflected ceiling plan and various electrical shop drawings
Providing manpower, materials, tool box meeting among electricians and monthly progress reports & material submittals and specification
Coordinate with mechanical & Civil department to clear the electrical issues
Preparing the running bill, & Maintain the daily work sheet report.
Testing for Lighting, power, fire alarm systems, bus bar & cables.
Installation of various Lighting equipments, Fire damper for smoke, DDC panel for FCU.
Installation of Earth pit, bimetallic connector & lightning arrester
Installation of presence detector, lighting control panel, smoke detector
Installation of DB, SMDB, EDB, CBDB as per the commented drawing of consultants.
Installation of various ranges of isolators for fire, domestic, primary & secondary pumps, Air Handling unit & chiller unit.
Laying various sizes of power cables, ELV cables, GI Trunking, trays & ducts.
COMPLETED PROJECTS:
Annual Maintenance of HT & LT 11KV substation work at CWMF, Kalpakkam.
Ups Distribution system erection work at P3A, Kalpakkam.
250kVA DG Erection work at CWMF,Kalpakkam.
Annual Maintenance of LT Electrical distribution system work at PRP TOWNSHIP, Anupuram .
LT & HT Panels Re-pair work and Building Earthing system at P3A, Kalpakkam. AND ISRO mahendragiri.
Various type of Cable tray and cable laying work at P3A, kalpakkam AND ISRO mahendragiri.
Electrical maintenance work and Motors Re-winding work at WSCD&BFTL, kalpakkam.
Fire alarm work for various places at IGCAR, kalpakkam.AND ISRO mahendragiri.
GI conduit through lighting system at UOF Building, kalpakkam.
Various type of Power cable laying work at UOF Building, kalpakkam. AND ISRO mahendragiri.
Various Electrical works In different locations in IPRC (ISRO), Mahendragiri .
NDT building various electrical works in IPRC (ISRO), Mahendragiri.
Various ext for electrical works and conversion for building electrical works IPRC (ISRO), Mahendragiri
Academic credentials
COURSE
INSTITUTION
BOARD / UNIVERSITY
MONTH & YEAR OF PASSING
PERCENTAGE
(B.E) IN ELECTRICAL & ELECTRONICS ENGG
J.J. college of Engineering & Tech., Trichy
Anna University, Chennai
2014
68
DIPLOMA IN ELECTRICAL & ELECTRONICS ENGG
Arasan Ganesan polytechnic college, sivakasi
Tamil nadu Technical board
2011
87
SSLC
GOVT.HIGHER. SEC.SCHOOL. sankaralingapuram
Tamil nadu state board
2008
83
Personal Profile:
Father’s Name : Mr. N. Subramani,
Date of Birth : 20.04.1993
Sex : Male
Marital Status : Married
Nationality : Indian
Religion : Hindu
Languages Known : English, Tamil
Declaration:
I consider myself familiar Electrical Engineering Aspects. I am also confident of my ability to work in a team.
I hereby declare that the information furnished above is true to the best of my knowledge.
Date: 20/10/2022 SIGNATURE,
Place: Virudhunagar (S.,MUTHUKAMATCHI)